Comparison of Streetcar and Bus Operations on 501 Queen

The summer 2017 conversion of the entire 501 Queen streetcar route to bus operation presents an opportunity to compare the behaviour of the two modes on this route.

Apologies to readers in advance for the length and number of charts, but that’s the nature of the subject.

Background and Data Sources

The raw data for this article comes from the TTC’s vehicle tracking system, CIS, for which much thanks, but the processing and interpretation are entirely my own. The machinery behind the digestion and presentation of TTC data is explained in Methodology for Analysis of TTC’s Vehicle Tracking Data.

In this article, there are data from two separate time periods:

  • April 1-30, 2017: At this time, 501 Queen service consisted of two overlapping routes. 501 streetcars operated from Neville Loop to Roncesvalles, while 501L buses operated from Dufferin to Long Branch. A local shuttle, the 501M, provided service on Marine Drive in the Humber Bay area, but it is not part of this analysis.
  • May 7-31, 2017: All service on the 501 operated with buses on two branches. 501L buses ran between Neville and Long Branch Loops, while 501P buses ran between Neville and Park Lawn Loops. Buses alternated between the two branches so that, in theory, there would be a 501P half way in between every 501L east of Windermere and The Queensway where the routes diverged.

Many readers will be familiar with charts on this showing the distribution of monthly headways (time between vehicles) and link times (time required to travel between two points). In addition to the detailed data, these charts include summaries of values by hour including averages and standard deviations. The latter values indicate the degree to which actual values differ from the average, and the higher the SD value, the worse the dispersion of individual values. This translates to “bunching” of vehicles which, in the worst case, sees buses running in pairs and trios.

For the purpose of this article, I have created charts pulling together the statistics for streetcar (April) and bus (May) operation. In the case of May, only data from the 7th onward when the route had been converted are included.

Are These Data “Typical” and “Representative”?

In the process of working through the data, I became concerned at the gap between bus and streetcar times. In order to verify whether the April 2017 streetcar values were typical, I also pulled the values for January through March and found that travel times were generally lower for streetcars, although there remain periods (notably evenings) when the bus times over the route are shorter than the streetcar times. However, the difference is not as great as the April 2017 streetcar data implies.

The chart below shows the travel time from Roncesvalles to Silver Birch by month from January to May. (Silver Birch is used as the origin rather than Neville Park because vehicle layovers at the end of the route sometimes occur west of that street, and measurements from that point could include layovers.) May data is bus only, and the other months are streetcar.

This chart shows clearly that April (blue) was an unusual month, and streetcar travel times are higher than for previous months. The May (green) data is for buses which are slightly faster in the evenings, but which lie in the same travel time range as streetcars for the months of 1Q17. The same data can also be shown as a percentage difference relative to the May (bus) data.

Where the values fall below the 0.00% line, the streetcars are faster. As we will see in the detailed charts for April and May below, the advantage varies over the route and by time of day.

The differences westbound are not as striking, but they are still an improvement over the April-to-May comparison.

The moral of the story here is that a data comparison may not be what it seems, and a few weeks’ data are not necessarily representative. For example, if the first part of September were used as a reference, this would be during the traffic mess downtown brought on by TIFF and especially the 504 King diversion. This would not be representative for either mode.

Similarly, the situation under poor weather may not produce the same comparison as under the generally fair weather experienced in May, the base month for the bus comparison here.

Continue reading

TTC Service Changes Effective Sunday June 18, 2017

The TTC’s June 2017 schedule changes bring the summer schedules with cutbacks in service on many routes. The effects of lower than expected ridership numbers, fleet and budget pressures show up in the following comment in the covering memo for details of pending changes:

The total number of weekly hours of regular service planned for the June board period will be approximately 2,600 hours below the level specified in the planned 2017  Service Budget for June (August 3, 2016 version). This is a result of current bus and streetcar fleet limitations as well as deeper summer cuts than originally budgeted for.

To put this number in context, the budgeted hours were 175,410 compared to the schedule hours of 172,807, a reduction of about 1.5%.

Scheduled hours to deal with construction-induced delays and diversions are also down from a budget of 38,022 to actual of 24,365 over the first half of 2017. This translates to savings partly in the Operating Budget (costs the TTC absorbs itself), the Capital Budget (service operated to deal with projects like the TYSSE) and recoveries from other parties.

At some point, the fleet limitations will cease to be a valid explanation for service levels, and the TTC will face increased costs simply to operate the service its own standards dictate. Worth watching for will be the fall 2017 schedules and the degree to which the summer cuts are actually restored. TTC’s recent mixed messages complain of lower ridership while observing that service on some major routes is well below the level of demand.

2017.06.18_Service_Changes

Streetcar Diversions

The rider challenge for this summer will be to figure out where all of the streetcar services are actually running.

  • 501 Queen continues with bus operation over the entire route due to various construction projects. Streetcars will return to parts of the route in stages through the fall, but will not operate over its full length from Neville to Long Branch until January 2018.
    • Streetcar service resumes between Connaught (Russell Carhouse) and Roncesvalles in September.
    • Streetcar service will return to Neville in mid-October, but there will be a diversion around trackwork at McCaul & Queen until late November.
    • Streetcar service resumes west of Roncesvalles in January 2018.
  • 502 Downtowner remains as a bus operation at least until mid-fall.
  • 503 Kingston Road Tripper will continue with streetcars in June/July, but will revert to bus operation thanks to construction at Coxwell & Queen later in the summer. Construction on Wellington requires a continued extension of the route westward to Spadina.
  • 505 Dundas will continue its diversion via Bay, College, Carlton and Church around water main and track construction east of Yonge Street until October.
  • 506 Carlton will have two diversions. Bus shuttles will cover the gaps.
    • In the east, for June/July, overhead work requires a diversion via Queen between Coxwell and Broadview/Parliament (EB/WB).
    • In the west, completion of City roadwork begun, but botched by the contractor in 2016, triggers a diversion via Bathurst and Dundas until October.
  • 504 King, 509 Harbourfront, 510 Spadina, 511 Bathurst, 512 St. Clair and 514 Cherry remain on their regular routes with streetcar operation.

504 King

Some of the peak period trippers now operated on King are being removed because of the “on-going delivery of new Low Floor streetcars”. The line is still scheduled as CLRV operation although many ALRVs, freed up from 501 Queen, now operate there at all hours. The real question, of course, will be what will happen in the fall when streetcars return to Queen and the ALRVs are not available for King. Moreover, current plans are for the Flexity cars to go next onto 512 St. Clair, and it is unclear just how the growth of the new fleet removes the need for trippers.

This ties into plans for a King Street transit priority scheme to go into effect late in 2017. It will be counterproductive for the TTC to cut back in service on 504 King just when better priority might be provided.

Keele Yard

The yard east of Keele Station (originally named “Vincent Yard” after the former Vincent Loop) has not been used for revenue vehicles for many years, but the shift of all of the T1 fleet to Line 2 BD has forced the use of all available storage. The TTC will shift four trains to Keele Yard, with remaining capacity (the yard extends underground beside Dundas West Station and can hold eight trains) to be used by work cars. Moves to and from the yard will occur at the beginning and end of service providing added maintenance time in the overnight break in service.

This yard is in a residential neighbourhood, and with its long inactivity the TTC is aware of the potential for disturbing the neighbours:

Morning service train preparations and noise control

Each night, four trains will typically return to Keele Yard at around 2 – 2:20 a.m., when crews will run system checks to ensure the trains are safe-ready for morning service. The trains will then leave the yard between about 5:45 – 6 a.m. Currently, the first westbound train is scheduled to travel past Keele Yard at 6:01 a.m. Local residents are likely to hear two short horn sounds – required for safety – whenever a train is about to move inside the yard, as well as the sound of trains moving. Efforts to minimize noise will include ongoing noise monitoring, regular reminders to staff at Keele Yard to keep noise to a minimum, sounding subway horns only when necessary for safety and ensuring that the warm-up periods of subway workcars parked on outside storage tracks is kept to a minimum.

Subway workcars will generally leave Keele Yard shortly before the four passenger trains arrive at the yard for the night, and workcars will return to the yard minutes before the passenger trains leave the yard for morning service. Workcar storage in the yard will fluctuate depending on scheduled work in the west. [From TTC Notice]

Presto Effects

A new section has been added to the service memo listing changes that will require new Presto transfer definitions. For June 18, this section reads:

506/306 CARLTON – streetcar diversion/shuttle bus operation requires customers transferring between cars and buses for through travel

There are many cases where Presto cannot deal with legitimate transfers, and the TTC expects operators and riders to know how the rules vary from route to route. Even their own web site is inconsistent on this point:

On the main Presto page, they say:

Transfers using PRESTO

If you have a PRESTO card you no longer need a paper transfer. This is because a transfer is applied to your PRESTO card when you first tap onto a card reader. The transfer for your one-way continuous journey is valid for two hours from the first time you tap your card on a reader. Standard transfer rules apply.

More extensive descriptions of bus-to-other mode transfers are on the bus Presto page. Again, the rule is that no transfer is required.

But on a completely different page, the general one for bus routes, the TTC tells riders of an exception:

PRESTO card customers require a paper transfer on the following routes.

Transfers must be shown to station staff when entering Union or Royal York stations and to operators when boarding these buses. Please make sure you obtain a paper transfer at the start of your trip.

15 Evans
121 Fort York
72 Pape
48 Rathburn
73 Royal York
76 Royal York South

This information does not appear on the pages for the individual routes, nor does it appear on the pages describing fare rules.

501 Queen Construction Projects for 2017

The TTC has announced the timing of various projects affecting the 501 Queen route through the 2017 construction season.

Previously announced work includes:

  • Reconstruction of The Queensway from Parkside to Humber Loop including the bridge deck at the Humber River
  • Reconstruction of Humber Loop and installation of a new substation to improve power on Lake Shore west of the loop
  • Reconstruction of track on Lake Shore to Symons Road (surface layer only) to replace rail prematurely corroded by electrolysis
  • Reconstruction of track on Lake Shore from Symons to Dwight (full reconstruction)
  • Toronto Water construction from Spadina to Bathurst
  • Replacement of the pedestrian bridge west of Yonge over Queen

Starting on Sunday, May 7, route 501 will be operated by buses with a structure similar to the streetcar service before it was split at Humber Loop. The turnback point for half of the service will be Park Lawn. This arrangement will be in place until Sunday, September 3 when streetcars will return to the central portion of the route.

Streetcars displaced from 501 Queen will be used on 511 Bathurst, 504 King (trippers) and 503 Kingston Road Tripper. 502 Downtowner will remain a bus operation.

Additional work is planned through the year that cannot be scheduled concurrently with City activities over the summer, and this will trigger other diversions and bus shuttles later in the year.

Toronto Water work on Coxwell will affect the intersection at Queen, and the 503 Kingston Road Tripper will revert to bus operation in August.

Track replacement at Coxwell will occur in September. Although streetcars will return to 501 Queen, they will only operate between Connaught Avenue (Russell Carhouse) and Roncesvalles. Shuttle buses will operate from Neville to Carlaw, and from Roncesvalles to Long Branch. It is unclear whether this actually means a return to shuttles as far east as Dufferin, or if the TTC plans some other scheme for the eastern terminal of the “501L” service. This arrangement will remain in place until October 14. Streetcar service to Neville will resume on October 15.

Track replacement at McCaul will occur in October/November, and this will require the familiar Church, King, Spadina diversion of all 501 cars around the site. Shuttle buses will operate between the Church and Spadina via Queen. This schedule will be in place until November 25, although if past history is repeated, the streetcars may come back to Queen once the work at McCaul is completed and the concrete has time to cure.

Streetcar service beyond Roncesvalles will not resume until the end of 2017.

 

Reconstruction of The Queensway and Humber Loop (Updated January 28, 2018)

Updated January 28, 2018: Construction photos added for Humber Loop.

January 28, 2018

The track for the new Queen car loop is substantially in place, and there is one major change – the conversion of what was once a passing track intended for use in coupling PCC trains (50 years ago) to a tail track long enough to hold a Flexity car. It is unusual in two ways. First, the TTC has systematically removed tail tracks everywhere they existed. Second, it is a dogleg shaped track so that a car sitting on it will not be in a straight line.

The Long Branch side of Humber Loop is still a construction site, although the new substation is now physically in place.

On The Queensway, concrete is complete all the way into Humber Loop, but the overhead supports have only been installed as far west as the South Kingsway underpass.

Continue reading

Buses Vs Streetcars on 501 Lake Shore Service

The year 2017 brought a long-term shutdown of the 501 Queen street service west of Sunnyside Loop to permit various construction projects on The Queensway, at Humber Loop and on Lake Shore Boulevard. Although work will not be seriously underway until the weather improves, the year-long shutdown also gives the TTC some breathing room in its ongoing problem of streetcar fleet availability as it awaits the long-overdue Bombardier Flexity order.

City TV recently reported that riders on Lake Shore are very pleased with the replacement bus service. That’s little surprise considering how much more frequent the buses arrive compared to the streetcars. A well-known aspect of service evaluation is that riders are much more sensitive to waiting time, especially in bad weather, than to in-vehicle travel time, especially if riding conditions are moderately comfortable.

There is also the question of comparative travel speeds with bus operations versus streetcars. Do the buses make better time than streetcars and, if so, when, where and why?

Continue reading

TTC Service Changes Effective March 26, 2017 (Updated)

Updated March 27, 2017 at 7:50 am: The City of Toronto has deferred the work on Queen that would have required diversion of the 501 streetcar service between Spadina and Shaw to later in the year when the route will be operating with buses.

The TTC plans for service changes in March 2017 are not extensive. They are detailed in the spreadsheet linked below. I have modified the format of this to include not just headways but also running times (including layovers). This was done to clarify situations where adjustments are made to deal with traffic conditions on routes and to show the amount of time added for diversions.

2017.03.26_Service_Changes

Construction Projects

Although diversions and bus replacements are inevitable for track construction projects, the degree to which the TTC and city are content to remove streetcars for construction outside of the streetcar lanes says little for the “transit first” language we often hear. There also appears to be little incentive to complete such projects as quickly as possible.

501 Queen

Construction projects affect sections of the Queen route for all of 2017:

  • Reconstruction of The Queensway right-of-way, the Humber bridge, Humber Loop and track on Lake Shore
  • Sidewalk reconstruction on Queen between Spadina and Bathurst (late March to late summer) (summer)
  • Reconstruction of the intersection of Coxwell and Queen (August)
  • Replacement of the overhead walkway west of Queen and Yonge linking the Eaton Centre to the Simpson’s building (now HBC/Saks)

For the period from March 26 to May 6, Queen cars will divert both ways via Spadina, King and Shaw. Replacement bus service will operate from University to Dufferin (terminating at Dufferin Loop south of King). Night service will operate from Yonge to Dufferin looping in the east via Church, Richmond and Victoria. (Deferred)

During the Queen diversion, running time will be added on 510 Spadina to allow for streetcar congestion and delays making turns at Queen and King. One cannot help wondering where “transit priority” fits in this situation considering that problems with this diversion were quite evident during 2016.

Starting on May 7, the route will be converted to bus operation end-to-end. This will have two branches similar to the streetcar service before 2015. One branch will operate from Neville to Long Branch, while the other will run from Neville to Park Lawn. Buses will run through the construction area from Spadina to Bathurst.

Because so many buses will be required and streetcars now on Queen will be released, streetcars will return to 511 Bathurst, 503 Kingston Road Tripper and the 504 King trippers.

Streetcar service on Queen between Neville and Sunnyside will resume in September, and over the full route to Long Branch in January 2018.

See also Ben Spurr’s article in the Star.

505 Dundas

Three projects affect the Dundas service during 2017:

  • Reconstruction of the intersection at Victoria and Dundas Square (beginning late March)
  • Reconstruction of the intersection at Dundas and Parliament (May-June)
  • Watermain construction between Yonge and Church (late March to October)

Effective with the March schedules, 505 Dundas cars will divert both ways via Bay, College, Carlton and Church.

During the May-June period when streetcars will not be able to operate through the Parliament intersection, a different arrangement will be required, but the details have not been announced.

504 King

Starting with the March 26 schedules, the King bus trippers will be extended north to Dundas West Station to avoid congestion at Sunnyside Loop.

With the May schedules, the Queen turnback at Sunnyside will end, and the bus trippers will be replaced by streetcars.

503 Kingston Road Tripper

With the May schedules, this peak period route will return to streetcar operation, but it will loop downtown at Charlotte Loop (Spadina, Adelaide, Charlotte) because Wellington Street will be under construction.

For the July schedules (mostly in August), the intersection at Queen and Coxwell will be under construction, and so bus operation will return to the 503.

The 502 Downtowner service will remain a bus operation throughout.

506 Carlton

When the March schedules were planned, a diversion was to be implemented between Broadview and Coxwell to allow reconstruction of the overhead over that section of the route. This diversion has been deferred due to the shortage of buses, but the new temporary schedules were already in place for March-April. This will leave 506 Carlton service on its regular route, but with added running time and wider headways. The standard schedule will come back into operation in May.

Continuation of last year’s sidewalk construction and streetscape improvements is likely, but yet to be confirmed, beginning in June between Bathurst and Lansdowne. Service adjustments are yet to be announced.

Route Changes

73 Royal York

The peak period 73A service that now terminates at Dixon Road will be extended north following the same route as the 73C Albion Road service to loop via Knob Hill Drive and Oak Street in Weston. This branch will be renamed as 73D.

121 Fort York – Esplanade

The route will be extended west into Exhibition Place so that operators on the route have access to a washroom (in Exhibition Loop). Running times during certain periods will be adjusted to match conditions on the route.

131 Nugget Express

Two branches of this service operate to supplement the SRT while the fleet undergoes major repairs to extend its lifespan. The 131E runs from Kennedy Station to Old Finch, but the 131F runs only from Kennedy to STC. Due to low ridership the 131F service will be removed. Service on the 131E is unchanged.

TTC Service Changes Effective Sunday, January 8, 2017 (Updated)

Updated December 12, 2016 at 3:00 pm and at 4:25 pm: Details of the works planned for the west end of the Queen line during 2017 have been added to this article.

The planned service changes for January 2017 bring major restructuring of two routes, and a troubling indicator about the general availability of vehicles for TTC service.

Bus Availability

Several routes will have AM peak service cuts because there are not enough buses to operate the service. None of these will push the service over the loading standards, and these could be thought of of “trimming” excessive service. However, the explicit reason given is the lack of buses.

This is partly due to the slow delivery of new streetcars and to the operation of buses on many streetcar routes either to make up for missing fleet, or to cover for construction projects, but also because of additional demands for spare buses for maintenance.

Streetcar Availability

At the time of writing this article, car 4429 is about to leave Thunder Bay. This leaves Bombardier on track if they push out one more car to hit their much-revised delivery target for 2016. However, the rate of deliveries is not expected to speed up until the second quarter of 2017 and so it will be some time before we see streetcars return across the system.The shortage is partly due to late deliveries and partly to the increased need for cars in maintenance for rehabilitation pending receipt of more Flexitys.

As of January, the following routes or portions of routes are operating with buses:

  • 502 Downtowner and 503 Kingston Road
  • 501 Queen (bus operation west of Sunnyside Loop to Long Branch)
  • 504 King (bus trippers)
  • 511 Bathurst

Effective January 8, 2017, the 501 Queen service will operate with streetcars only between Sunnyside Loop and Neville Loop. A bus service will run from Long Branch Loop via Lake Shore, Windermere, The Queensway, Queen and Dufferin to Dufferin Loop. The same arrangement will be in place for night service, and so riders bound west of Roncesvalles will have to transfer to the night bus.

Beginning in the spring, The Queensway right-of-way will be rebuilt over its entire length including the bridge at the Humber River, the “Long Branch” side of Humber Loop will be rebuilt, as will the track from Humber Loop west to Dwight and Lake Shore (just at the point where Lake Shore straightens out). Streetcar service is not expected to resume until late in 2017 January 2018.

Update: The timing for various components of this project, tentatively, is:

  • Queensway track from Claude to Humber Loop will be rebuilt in concrete rather than with open ballast as at present. This work will occur over much of the construction season.
  • City work on the Humber River bridge will also run through the construction season.
  • Track on Lake Shore from Humber Loop to Dwight will be replaced in the spring.
  • A new substation will be installed at Humber Loop in the summer.
  • Track at Humber Loop and through the tunnel to Lake Shore will be replaced in the late summer and fall.
  • There are no plans at this point to change the stop at Parkside Drive which is not accessible.

Further to the above, the TTC advises that “most of the track work west of Humber Loop is the replacement of the rail and top layer of concrete only, and so the alignment does not change.”

[Thanks to Scott Haskill at the TTC for these details.]

A separate project to rebuild and reconfigure The Queensway east of Parkside to Roncesvalles, including replacement of the intersection and the junctions with the carhouse, is planned for 2019.

Concurrent with this change, some of the bus trippers on 504 King will revert to streetcar operation. Also, the 80A Queensway service to Keele Station will operate at all hours rather than cutting back to Humber Loop to preserve a connection with the 501 Queen bus service.

Metrolinx Construction on the Eglinton LRT

This project continues to affect more routes whose schedules have been adjusted mainly by giving more running time and stretching headways.

The major change in this regard is that the 25 Don Mills route will be split on weekdays at Don Mills Station into two separate routes so that construction delays on the south end of the line do not affect service north of Sheppard. The service levels on the 25 Don Mills local buses and 185 Don Mills Rockets have been slightly adjusted to reflect greater demand on the locals.

2017.01.08_Service_Changes

501 Queen: Construction Effects on Service (Updated)

Since May 8, 2016 and continuing until Thanksgiving weekend, route 501 Queen is diverting around water main construction on Queen west of Spadina. The westbound diversion takes streetcars south to King at Spadina, west to Shaw and back north to Queen, and eastbound service follows the same route in reverse.

This article compares the line’s operation before and after the diversion took effect.

Updated July 26, 2016 at 4:00 pm: A chart has been added shown the delaying effect on King Street service eastbound at Spadina caused by queues for left turning eastbound Queen cars.

Continue reading

Reviewing the New Schedules on 501 Queen for January 2016 (Part II)

In January 2016, the TTC implemented new schedules on route 501 Queen making the following changes:

  • The route was split into two sections with an independent Humber to Long Branch service (in effect, a return of the long absent 507 Long Branch route), and
  • Running times were increased so that scheduled and real-world travel times were better matched and short turns could be reduced.

The first article on this subject reviewed headway behaviour (the space between cars) with the new schedules. This article turns to running times (the time required to get from A to B) and service behaviour at terminals.

Continue reading