GO Transit Expansion: February 2020 Documents

This page is a repository of documents that were used by GO/Metrolinx as part of the February 2020 round of consultations, but which may no longer be available on their site. I have posted them here for comparison with whatever designs are revealed in the November final round of TPAP consultations.

Note that some of these files are very large.