Scarborough LRT 2010 Environmental Assessment

This page contains the documents for the 2010 Environmental Assessment of the Scarborough LRT line.

Updated July 5, 2016: Display panels from the public consultations in March and April 2010 have been added.

The TTC began a review of the SRT’s reconstruction and extension as a study of using updated RT technology (such as in Vancouver), but changed the study to LRT with the arrival of the Transit City plan to piggyback on the availability of a common LRT network.

Environmental Assessment

Executive Summary

Table of Contents

Chapter 1: Introduction

Chapter 2.1 Objectives / 2.2 Major Functional Alternatives

Chapter 2.3 Refinements

Chapter 2.3 Refinements (2) / 2.4 Preferred Design

Chapter 2.4 Preferred Design (2)

Chapter 2.4 Preferred Design (3)

Chapter 2.4 Preferred Design (4) / Conceptual Design (1)

Chapter 2.4 Conceptual Design (2)

Chapter 2.4 Conceptual Design (3)

Chapter 2.4 Conceptual Design (4)

Chapter 2.4 Conceptual Design (5)

Chapter 2.4 Conceptual Design (6)

Chapter 3 Existing and Future Conditions (1)

Chapter 3 Existing and Future Conditions (2)

Chapter 4 Environmental Impacts, Mitigation Measures and Monitoring

Chapter 5 Future Commitments

Chapter 6 Consultation Process

Appendices A-C: Alternative Analysis / Natural Sciences / Noise & Vibration

March 4, 2010 Public Information Centre Display Panels

2010-03-04 Part 1

2010-03-04 Part 2

2010-03-04 Part 3

2010-03-04 Part 4

April 12, 2010 Public Information Centre Display Panels

Note that this presentation includes a surface link from the extended SLRT to Sheppard Avenue via Progress. This option was rejected by Toronto’s Executive Committee and replaced with an underground link.

2010-04-12 Part 1

2010-04-12 Part 2

2010-04-12 Part 3

2010-04-12 Part 4