Ontario Line East Segment Update

On June 24, 2021, Metrolinx held an online consultation session for the Ontario Line segment between the Don River and Gerrard Station.

In a distinct change from a previous round, Metrolinx did not begin by insulting the audience with claims that the session would deal with “myths and misinformation”. This is refreshing and long overdue. Metrolinx appears to be going out of its way to fine-tune the design through Riverside to produce the least side-effects as possible while preserving their preferred alignment. Although they are looking at underground alternatives, much of their work focuses on their planned scheme with a shared GO+OL corridor.

Since the previous articles I have written on this project, the East Segment Neighbourhood Update page has been substantially revised.

Readers should also refer to:

Metrolinx has revised maps of this segment to show the Ontario Line on the north side of the rail corridor rather than the “straddle” configuration previously shown.

Continue reading