Where Is The Grass? (Updated)

Updated August 4, 2021: Metrolinx has begun installation of a test strip of grass at the Golden Mile stop (Warden). See their blog article The Eglinton Crosstown LRT is going green.

With the recent interest in testing activities on the Eglinton Crosstown, and the inevitable flurry of photos that will appear in coming weeks, a question popped up on social media recently: where is the grass?

Illustrations of the line’s eventual state vary, but there are two examples below that clearly show a grassed right-of-way, at least in some locations. [Source: Early Works Open House Presentation]

I asked Metrolinx about the extent of the line that will be grassed, and when we might see more about this. Here is their reply [email from Metrolinx Media Relations, June 1, 2021]:

  • There will be grass across the full width of the Guideway, with the exception of bridges and underpasses, Stop platforms, intersections, and where roadway vehicular, pedestrian and/or emergency services access is required.
  • Plant material of the Green Tracks shall be selected from suitable species of sedum or grass that are low maintenance and resilient to track conditions such as drought, salt, frost and cold, urban pollution, heat, and pulling wind forces of the vehicle.
  • Vegetation surface of the Green Tracks shall be harmonized with the whole track system.
  • We’ll have more details to share closer to the project’s completion.