On a day that hinted vaguely of, dare I say it, Spring, I visited King-Queen-Queensway-Roncesvalles to see the current state of affairs.
In brief:
All track is assembled and concrete placement is underway for the north gate (Roncesvalles Avenue) entrance of the carhouse.
Eastbound road traffic on The Queensway is now using the new curb lane.
Construction of the track foundation between Glendale and Parkside is underway.
Overhead contact wire is up at Sunnyside Loop, although the work to attach it to hangers is not yet finished.
One might think it possible we will see streetcar service at least to Sunnyside on Queen and on Roncesvalles to Dundas West Station this Winter-Spring. Schedule details for the mid-February and late-March changes have not yet been announced.
At the very least, long-suffering residents of Roncesvalles should get their buses back between The Queensway and Howard Park in a few weeks unless the project is delayed in some mysterious way even longer.
The full list of closures begins on p 13 of the report. There is a variety of full weekend, early closing and late opening events (check the legend to the chart).
There are fewer Line 1 closures in 2023 due to ATC (Automatic Train Control) than in 2022 because the main work is complete. However, there is a follow-up phase that will require some weekend closures for testing and implementation. Other work affecting Line 1 includes repair of station finishes on the University subway, elevator installation at Lawrence, various track replacements, and preliminary work at Finch for the Yonge North Subway Extension.
On Line 2, there will be work at Kipling to add a new storage track, preparatory work at Kennedy for Scarborough Subway Extension, preparatory work on the east end of the line for ATC installation, and some track replacement work. As usual there will be several late openings of service on Sundays for beam replacement on the Prince Edward Viaduct.
Many closures involve only an early shutdown of subway service to give a longer overnight maintenance window than would be possible with normal hours of service.
Streetcar
There is a long list of events for the streetcar system, but many of them are short interruptions of overnight/weekend work for inspections or minor repairs.
The major trackwork planned in 2023 is listed both in the report (starting on p 19) and on the TOInview map of City construction projects. The schedule implies that a good chunk of the streetcar system will be shut down at various times during the year. The Ontario Line contributes some of this to the Queen car, but the long-suffering riders on King do not get a break either after years of work at King-Queen-Roncesvalles. Note that Adelaide from York to Victoria is a Metrolinx project and so does not appear in this list.
Some of the dates in the TTC list do not align with info on TOInview. This is very common.
Parts of the schedule simply do not make sense. Some projects have far more time reserved than they should take based on past experience. Some projects will block the routes from carhouses in the east end to the rest of the network either via Queen Street or via Coxwell and Gerrard Streets, and times for these overlap.
Update: The TTC confirms that planned work on Gerrard Street will not occur at the same time as projects on Queen will block access to Leslie Barns and Russell Carhouse. See the map at the end of this section for a graphic view of the planned work.
Details of the Broadview Station Loop expansion are not yet available, nor is it confirmed whether this will actually occur.
I hope to get clarification of what is going on from the TTC.
Feb 27-Mar 26: King Street West from Close to Strachan
Mar 10-Oct 29: Dufferin Loop
Mar 24-Nov 28: Queen Street East from Carlaw to Leslie & Leslie to Greenwood
Mar 31-Apr 7: Intersection of King & Church
May 1-Nov 29: York from Queen to Adelaide (Ontario Line diversion)
May 6-July 8: Intersection of Lower Gerrard & Coxwell
May 6-Nov 21: Russell Yard
May 14-Nov 8: Broadview from Gerrard to Broadview Station
June 18-July 29: Intersection of King & Parliament
July 30-Nov 18: Metrolinx work at Queen/Degrassi overpass
Sept 3-Oct 2: Broadview Station Loop
Sept 7-Oct 29: Queen from Parliament to River & Davies to Broadview
Oct 8-Dec 16: Oakwood Loop
Oct 16-Feb12: St. Clair West Station Loop
The report does not list specifics for 2024, but info already appears on the TOInview map. It is not clear how some of this work will interact with Metrolinx Ontario Line construction at King & Bathurst. There is a proposed track and lane realignment at Bathurst & Fleet, but it is not clear whether this will actually occur, or if the planned work is simply replacement of existing special work as is. Details of the Spadina Station streetcar loop expansion are not yet available.
St. Clair & Yonge
St. Clair & Bathurst
Queen St. W from O’Hara to Triller
King St. W from Strachan to Spadina
King & Queen (Don Bridge)
Bathurst St. from Queen to Front
Bathurst & Queen
Bathurst & Fleet
College St. from Bay to Yonge
Main & Gerrard
Russell Yard (continuing from 2023)
Expansion of the streetcar platform at Spadina Station Loop
Update: The following map was included in the staff presentation to the Board on January 19, 2023.
This map contains several geographic errors:
The project labelled Queen & Yonge points at King & Spadina.
The project for St. Clair & Bathurst is shown east of St. Clair West Station rather than west of it.
The project for St. Clair & Earlscourt is shown well west of Lansdowne rather than east of it.
Carstops on Queen East at Wineva and at Waverley are shown as west of Kingston Road rather than east of it.
The project for Queen & Jarvis is shown well west of Yonge.
The project for Fleet Loop actually points to Exhibition Loop.
There are a few more, but my point in cataloguing them is that this is sloppy work and it speaks to the quality of information presented to the Board by management.
Pantograph Conversion
Gradually, and several years behind the original target date, the TTC has converted overhead wiring designed for trolley poles first to a hybrid pole/pantograph configuration, and then to pure pantograph style. A map of the current status was included in the staff presentation.
There are some problems with this map which is based off of a track plan that is itself out of date. “Wrong way” track has been removed from the one-way streets downtown, although it still appears here. Also, some work is underway on King West even this is not shown with the orange “in progress” colour. The intersection of King & Shaw had already been converted to Hybrid format when I visited it a month ago. (There are other errors in the map, but please don’t bother commenting with fixes.)
One amusing relic is the legend “Hillsdale Ave” on Lake Shore Blvd West. This was the site of a long-removed wye, the last in the system, and the street is called “Hillside Ave”. “Hillsdale” is in North Toronto.
Again, this is an unfortunate example of how the “official” records of the system are out of sync with actual conditions in the field.
The TTC will modify many routes on January 8, 2023, although most of the changes are small tweaks rather than a significant overhaul of service. Current changes are achieved mainly by reallocation of vehicles, modification of running times and headway adjustments.
Updated January 3, 2023 at 4:35pm: A table showing the number of replacement buses on streetcar routes has been added.
In the January schedule period, the planned weekly service is down from November 2022 levels. That is the appropriate comparison because the “December” schedules only cover the holiday period when service is reduced. All of these reductions have been reversed in the January schedules, and some school trips have been added beyond the November level.
Service in the latter part of 2022 ran below budget because riding had not rebounded as quickly as originally hoped across the system. January 2023 continues at a similar level, and a service budget has not yet been published, let alone approved.
Hours/Week
Regular Service
Construction Service
Total
Nov 2022 Budget
182,016
4,492
186,508
Nov 2022 Planned
173,249
4,187
177,436
Dec 2022 Planned
170,708
3,779
174,387
Jan 2023 Planned
171,802
5,175
176,977
Source: TTC Service Change Memos for November/December 2022 and January 2023
Subway Service
There is no change in subway service for January 2023.
Streetcar Service
506 Carlton will return to its normal route over its entire length after an extended sojourn on Dundas Street. The 306 night service will return to streetcar operation. Construction of streetscape changes on College Street is not yet complete, but this will not require a diversion in 2023.
Some streetcar routes will have new schedules:
509 Harbourfront and 510 Spadina will be modified to reduce layover conflicts at Union and Spadina Stations.
Service on 509 Harbourfront will be reduced to match demand in some periods.
Sunday early evening service on 510 Spadina will be changed so that all cars operate as 510A to Union rather than a split service with 510B turning back at Queens Quay. This matches the Saturday service pattern.
512 St. Clair service will be reduced to match demand during some periods.
The allocation of routes to carhouses will change slightly to balance resources. The table below includes a long absent route “507 Long Branch” and the temporarily suspended “508 Lake Shore”, but not the “502 Downtowner”. Make of that what you will.
The number of buses operating on streetcar routes for construction projects is shown in the table below.
Bus Service
Routing Changes
29/329 Dufferin
Due to construction for the Ontario Line’s Exhibition Station, the 29 and 329 Dufferin services will be rerouted as shown in the maps below.
43B Kennedy and 985A Sheppard STC Services
These routes will be modified to access Scarborough Town Centre via a different path in order to provide connecting stops with the temporary GO bus terminal.
95C York Mills and 996 Wilson Express Service to Ellesmere Station
The 95C York Mils branch will be dropped, and in its place the 996 Wilson Express will be extended east to Ellesmere Station.
The levels of service in the “before” and “after” configurations are compared below.
Buses/Hour
AM Pk Pre
AM Pk Post
Midday Pre
Midday Post
PM Pk Pre
PM Pk Post
95A Pt Union
7.5
6
3.3
6
5.5
6
95C Ellesmere Stn
7.5
3.3
5.5
995 UTSC
5.5
5
3.8
3.8
5.5
5
996 Ellesmere Stn
6.7
4.8
6
Total to Ellesmere Stn
20.5
17.7
10.4
14.6
16.5
17
Total to UTSC
13
11
7.1
10.8
11
11
Other affected bus routes
600 Run As Directed: The number of scheduled RAD buses is deeply reduced with only 6 weekday crews and none on weekends. Divisions will assign buses locally depending on operator availability.
19 Bay: An AM peak tripper to handle demand to the waterfront will be created by diverting one 503 Kingston Road bus to run eastbound as a Bay bus to Dockside Drive and Queens Quay, then deadhead to Broadview and Queen to resume service on the 503.
20 Cliffside and 113 Danforth: Headways will be standardized so that an evenly blended service can operate from Main Station on these overlapped routes.
25 Don Mills: The split branch structure north and south of Don Mills Station will be extended into the early evening on weekdays.
925 Don Mills Express: Trips added during peak periods to match demand.
939 Finch Express: Midday and PM peak service improved, evening service reduced.
41 Keele: Service reduced to match demand.
44/944 Kipling South: Some early express trips will be replaced with local buses. Two school trips from 44 Kipling South will interline with 76 Royal York South school trips.
945 Kipling Express: AM peak service improved.
48 Rathburn and 112 West Mall: PM school trips serving Michael Power Saint Joseph HS will be changed to match dismissal times.
52 Lawrence West: A new trip will be added from Westwood Mall at 6:52am to accommodate demand. A new trip will be added between Lawrence and Lawrence West Stations in the early PM peak. This is a hook-up with an existing school trip.
57 Midland: Service reductions to match demand.
60C/960 Steeles West: Service between Pioneer Village Station and Kipling on the 60C branch will be reduced in peak periods to match demand. This will be offset by improvement to the express service.
960 Steeles West Express: Early evening service reduced.
63 Ossington: Service modified for resiliency and to match demand (mainly reductions).
68/968 Warden: Schedules adjusted for reliability with less frequent service during many periods.
79 Scarlett Road: Service reduction weekdays in peak and midday periods.
86 Scarborough: Zoo shuttle will operate only on Saturday to serve Terra Lumina. Sunday service dropped.
95/995 York Mills an 96/996 Wilson: 996 Express service extended to Ellesmere Station replacing the 95C local service (see map above). Service changes during many periods to improve reliability with a mix of frequency changes.
102/902 Markham Road: New trips to serve school demand to R.H. King Academy and Centennial College.
116 Morningside: New PM school trips from Morningside & Ellesmere to serve Jack Milner PS and Sir Wilfrid Laurier CI.
122 Graydon Hall: All trips will now enter service eastbound at Don Mills.
130 Middlefield: New school trips to serve Henry Kelsey Senior PS.
165 Weston Road: Service reliability changes primarily through longer running times and additional buses.
168 Symington: Service reduced to match demand.
Peak bus service
The Details
Details of these changes are in the spreadsheet linked below.
Updated December 23, 2022: The City has issued an update stating that the work on Roncesvalles will not be finished until at least the end of February, and The Queensway will not be complete until Spring 2023.
Stage 3 work on Roncesvalles will be completed by the end of February 2023.
Work will continue after this period with the installation of TTC streetcar track platforms and overhead wiring, with only lane restrictions as necessary.
The final major piece of trackwork installation is underway. Once new paving is in place, the overhead can be restored and, at least in theory, streetcars can return to Roncesvalles Avenue. This is likely to be confined initially to carhouse moves to and from Howard Park until TTC schedules catch up. A service restoration date for 504 streetcars has not yet been announced, but the mid-February schedule change would be the first opportunity. (As I write this, the January changes have not yet been announced.)
With the revised completion dates announced by the City, the first schedule change that could restore streetcars to Roncesvalles would come at the end of March or early April. It is possible that bus service on Roncesvalles could be restored as work north of Queen reaches a point where some lanes can be opened.
Meanwhile, although road construction continues on The Queensway between Sunnyside and Parkside, only the span wires and hangers are up at Sunnyside Loop, but no contact wire. There is still no track between Glendale (St. Joseph’s Hospital stop) and Parkside (the first stop on the Queensway right-of-way). Paving of the new curb lane eastbound from Parkside to Roncesvalles was underway on December 22, and the new eastbound Glendale stop platform is now in place.
Dates for restoration of streetcar service to Sunnyside and to Long Branch have not been announced.
The City’s update puts completion of the road work in Spring 2023. Whether this will include restoration of track and overhead remains to be seen.
As part of work being completed on The Queensway (Parkside Drive to Roncesvalles Avenue), the contractor has uncovered conflicts with underground utilities that require modifications to the designs.
The Stage 2 work is now expected to be complete in Spring 2023. Upon completion, all travel lanes on The Queensway will be restored and northbound access to Sunnyside Avenue from The Queensway will be reinstated.
Looking north on Roncesvalles from QueenLooking west across Roncesvalles at North Gate of carhouseWelding track on Roncesvalles north of QueenThermite welding jigs and cauldron
Dundas Sinkhole
A major sinkhole on Dundas near Brock caused a service diversion of route 505 Dundas via College and Ossington. This ended in the early evening of December 19. The photo below, provided by reader Raymond Lee, shows the track restoration in progress on December 10.
Reinstalling track over Dundas sinkhole. Photo by Raymond Lee.
King & Shaw
Service was restored to King Street west of Bathurst on December 9, 2022. 504A Distillery cars run to Dufferin Loop. 504B Broadview Station cars run to Bathurst Street.
Looking east on King at ShawLooking west on King at Sudbury
Adelaide Street
Work is expected to be complete to Charlotte Street by year-end. Work east from York Street to Victoria, and on York Street itself will be done as a separate project in 2023.
College Street
Most work on College Street is complete although 506 Carlton streetcar service remains on diversion. The TTC should be restoring the normal route soon, but has not announced a date yet. As of December 19, the 506C bus shuttle operates along College and Carlton streets rather than diverting along Harbord, Hoskin, Queen’s Park, University and Gerrard.
In spring 2023, the City’s contractor will return to complete work on the elevated cycle tracks between Manning Avenue and Spadina Avenue and upgrades to the existing bike lanes between Spadina Avenue and Bay Street.
Wellington Street
Updated: This original text has been removed because it proved to be out of date.
The current status is that undocumented underground conflicts still dog this project, which also was delayed to accommodate local festivals. Work on the north side of Wellington is expected to be largely completed in 2022, but the south side will be finished next Spring.
There is no word on when TTC will reinstall overhead so that 503 cars can return to the Church-Wellington-York loop.
Updated December 20, 2022: Detailed charts have been added for the segments between Jarvis and Yonge, and between Yonge and University. Click here to jump to the new part of the article.
This article continues a series looking at the travel times on King Street in the “transit priority” segment between Bathurst and Jarvis Streets with data to the end of November 2022.
With the resumption of commercial and social activities, the comparative calm on King has disappeared, and the street can be very busy in the Entertainment District especially in the evening. The laissez-faire approach to traffic management and enforcement on King did not matter much during the pandemic shutdowns, but the benefits of the priority area are slowly being lost.
This echoes other aspects of the transit system where as a City we seem to have forgotten how to run things well under “normal” conditions either because of permanent funding cuts, or because we have forgotten the effort needed to deal with heavier demand on our services and infrastructure.
The first set of charts in the article takes the long view starting in 2016 to show the evolution from before the transit priority zone was created, then the effect of that zone, the arrival of the pandemic and the return to pre-pandemic activity.
There are two distinct sections of King Street. East of University is the business district, and it is less affected, at least from a transit travel time point of view, because activity there is still below “normal”, pre-pandemic conditions. However, interference from north-south traffic backlogs at intersections is starting to have an effect, mainly in the PM peak. West of University is the Entertainment District and its high density residential neighbourhood where one might ask “what pandemic?” from the number of pedestrians and motorists on the streets.
Later in the article, I will review changes in travel times over short segments between Jarvis and Bathurst.
This article arose from complaints I saw on Twitter about the poor service on the 63 Ossington bus during November and early December. The common thread is that service is extremely erratic, a common problem on many routes.
In the case of the Ossington bus, most trips are comparatively short because it extends only from Eglinton West Station to Liberty Village, and many trips are to or from the subway at Bloor. This means that wait times can form a substantial part of a journey on the route, sometimes more than half. Moreover, they are unpredictable and riders must allow time for this whether they will need it or not. This is not a formula for attracting demand back to the system from those who have a choice of travel some other way.
Service on 63 Ossington during November 2022 operated with schedules that had been in place for some time. The weekday schedules had been in effect since March 2022, and the weekend schedules since November 2021.
During peak periods, half of the service short turns at St. Clair via Oakwood Loop, but at all other times, all buses run over the entire route.
During November 2022, there was an enlarged south end loop to avoid construction at King & Shaw, but no additional running time was provided in the schedule to compensate for this.
The route has frequent opportunities to regulate headways with layovers at the terminals and at Ossington Station Loop. Note that recovery times are particularly large during weekday peak periods and midday. This is intended to deal with congestion due to Line 5 Crosstown construction at Eglinton West Station. Recovery times are more commonly only one headway or less.
Here is a brief update on various construction projects in progress.
King/Queen/Queensway/Roncesvalles
Excavation continues on Roncesvalles at the north gate of the carhouse while the track panels for the new junction remain on trailers on King Street (see previous update).
Track installation has started south from Harvard Street toward the north gate.
Looking across Queen from King to RoncesvallesLooking north on Roncesvalles from QueenLooking south on Roncesvalles to QueenLooking west to the north gate of the carhouseNew track installation south from Harvard Ave.
The TTC has not yet announced a date for resumption of through service on Roncesvalles between Howard Park and The Queensway on route 504 King, nor for through streetcar service from downtown to Dundas West Station.
On The Queensway, the eastbound stop at Glendale has finally been taken out of service. Passengers are now directed to use westbound buses to access St. Joseph’s Hospital transferring at Roncesvalles or at Colborne Lodge Drive as appropriate.
The map below was tweeted by @ttchelps. As I write this, neither this map nor the diversion notice for the 504 bus service are linked to the route’s schedule page.
Construction continues on the new eastbound curb lane and the eastbound streetcar stop at Glendale. Work is also in progress on the track between Glendale and Parkside.
Overhead is still not in place at Sunnyside Loop although many span wires and hangers have appeared. The 501 Queen service cannot be extended from Dufferin to Sunnyside until this loop is available.
King & Shaw
According to a City of Toronto construction notice, this intersection will reopen on Friday, December 16. This would allow the 504 King and 63 Ossington services to resume normal operations here.
When the TTC announced their November service changes, this included a temporary option, once King & Shaw reopened, with half of the 504 service turning back at Exhibition Loop (the 504B Broadview cars) and half running through to Dufferin (the 504A Distillery cars). The 504C buses which loop at York Street would shift to a Bathurst turnback.
The TTC has not yet confirmed whether these arrangements will actually happen.
Adelaide Street
Construction has moved swiftly west on Adelaide and is now in the final stretch between Widmer and Charlotte Streets. The section east from York to Victoria will be rebuilt in 2023.
Looking east on Adelaide from Peter to WidmerLooking west on Adelaide across Peter
Wellington Street
New overhead has not yet been installed on Wellington Street. The 503 Kingston Road bus is looping via York, Richmond and University from King. Streetcar service should return in the Spring when pantograph-friendly overhead on the downtown loop and on Kingston Road has been installed.
Dundas at Brock Street
A large sinkhole appeared under the streetcar tracks on Dundas at Brock due to a burst 120-year old sewer. The City expects the street to be restored by the end of December, but the TTC will then have to restore the track and overhead. Until that work is finished, tentatively by the end of January 2023, the 505 Dundas service is diverting both ways east of Lansdowne via College and Ossington.
Media coverage is available from CBC and CITY, among other sources.
College Street
The diversion of 506 Carlton streetcars around the College Street reconstruction project is expected to finish by the end of 2022. Streetcars continue to operate both ways via Bay, Dundas and Ossington.
The KQQR project is heading into the home stretch with work now underway on the North Gate to Roncesvalles Carhouse, and roadway construction and paving on The Queensway west to Parkside Drive. Alas, there is no announced completion date.
At the North Gate, recently completed utility work allows the area to be excavated in preparation for the new special work. This track has not yet been rebuilt to current standards (a program that will take years to complete as the cycle time is 20-30 years) with a concrete foundation, pre-welded track mounted on panels, and a top layer of concrete that can be removed for repairs without disturbing the two layers below.
The new track panels are sitting on trailers on King Street east of Roncesvalles awaiting installation.
Meanwhile there is some preliminary work on new overhead leading north into this area, but the main installation cannot occur until the new track is in place and overhead trucks can drive under the new wire.
On The Queensway itself, overhead has begun to take shape at Sunnyside Loop, but it is still not operational. This leaves the 501 Queen service turning back at Dufferin Street.
On King Street east from The Queensway, conversion of overhead suspension to pantograph compliance has finally started. This area and Kingston Road are the last two major areas to be converted.
Along the south side of The Queensway, much of the new curb is now in place and concrete for the new curb lane will likely appear soon, weather permitting. At Glendale eastbound (St. Joseph’s Hospital) the bus stop is even more rudimentary than on previous visits. Passengers wait in the temporary crossing area (which is now at least concrete rather than a wooden bridge), and then move across the traffic lane to board a bus when it arrives.
Between Claude and Parkside (the easternmost part of the existing streetcar right-of-way) excavation is in progress to remove old track and wooden ties in anticipation of completing the new trackwork between Glendale and Parkside.
Roncesvalles Carhouse North GateLooking north on Roncesvalles to HarvardLooking west across Roncesvalles into the North GateLooking north on Roncesvalles from QueenTrack panels for Roncesvalles Carhouse North Gate on King StreetTrack panel with Fasetta track craneFasetta track craneLooking west to The Queensway and ParksideLooking east on the Queensway at GlendaleEastbound bus stop on The Queensway at Glendale
This article was originally going to be a very long reply to a comment left in the Spadina vs Bathurst thread, but I have moved it to its own article for better exposure.
I received the following comment from someone whose identity I will keep to myself. You know who you are.
Steve, I am a political strategist at the municipal level here in Toronto. I have a meeting with some new inner city Councillors next week (+ the Mayor) who are interested in this issue of streetcar speed and reliability (as am I as a fervent reader of your blog!).
Putting aside cost and political barriers for the moment: from a purely technical perspective, what measures would you recommend implementing on the Spadina and St. Clair streetcar routes to speed them up without losing ridership?
For instance:
Are there any stops on the Spadina line, near or far side, that could be eliminated while still retaining the riders who use those stops via other stops?
What kind of TSP [Transit Signal Priority] extension would yield the best results if having to choose between the two: extending the seconds of green light extension OR maintaining the green light extension window while simultaneously allowing for more active TSP (ie rather than just if it’s late)?
How much time would be saved if all far side stops were eliminated on Spadina and St Clair?
How much delay does the lack of grade separation for the final/first leg of the St Clair route (ie when it’s entering or leaving the station and having to wait for cars and pedestrians) cause? Would installing a signal system for that unprotected stretch that prioritizes the streetcar result in any substantial gains?
Open to all thoughts and suggestions – many thanks 🙂
I am replying to this in public because (a) the comment was left in the public thread rather than sent in a private email, and (b) my answers will be of interest to other readers.
Back in August 2021, I published an article about running times on the 510 Spadina streetcar including comparisons with the nearby 511 Bathurst car. Despite being on its own right-of-way, the Spadina car is almost always slower than the Bathurst car.
There are various reasons for this including double stops at signalled intersections and longer stop service times due to the demand level on Spadina.
That article used May 2021 data which reflected mid-pandemic traffic conditions. With demand and traffic rising in past months, I return to the subject using October 2022 data.
The situation has not changed much in the intervening year and a half. 511 Bathurst cars still win the race during most time periods, although on a few occasions the 510 Spadina cars take the prize.
Comparing Travel Times
Here are comparative running time averages for October weekdays on the two routes. Two sets of values are shown here:
The solid lines show average travel times between Bloor and Front each way.
The dotted lines show the average travel times between Bloor and Richmond each way avoiding problems with congestion and enroute layovers at the south end of these lines.
Throughout these charts, data for Spadina are plotted in red while data for Bathurst are in green.
During most weekday periods, Bathurst cars have the lower average travel time between Richmond and Bloor, but the results are mixed between Front and Bloor.
Here are the comparable charts for Saturdays and Sundays. Bathurst almost always wins out.
The charts below subdivide the weekday data by week to show that the numbers are not always exactly the same. There is even more variation on a day-to-day basis. I include these to illustrate the importance of not taking averages over long periods at face value because this can hide variations.
In these charts, the warmer colours (red through light green) show data for the Spadina car while the cooler colours (blues and purple) show the Bathurst car.
These charts show the general shape of average data, but more a more detailed view is needed to compare the routes’ behaviour.