Where Will Fido Sleep?

Those who ride the Danforth subway might be forgiven for thinking that we did not fit into the “One Stop” universe as so few of “our” stations had video screens.  Not enough eyeballs, obviously, to make it worth their while.

Just last week, however, things started to change with the disappearance of the electronics from the old “Metron” displays and the installation of new “One Stops”.

Gone is the full working set of Metrons at Donlands Station which faithfully displayed ads for a travellers’ kennel near Pearson Airport for all those years.  Now dogs on the Danforth will have to put up with what passes for news and the occasional, if erratic, notice about service blockages.

At least the time will be correct.

Yonge Subway Headway Study 1988 (Part 7)

This section includes the remainder of Chapter 4 covering three alternatives to the centre platform option at Bloor Yonge.

  • A double station with new platforms north of the existing Bloor Station
  • A bi-level station
  • Two versions of a diversionary route with a new southbound or northbound track and station

I commend these to the readers who have been proposing various alternative tunnel and platform arrangements here for a clear view of just where the structures actually lie.  Bear in mind that much has been built since these plans were drawn, and assumptions about available rights-of-way or the acquisition and demolition of buildings are probably no longer valid.

Continue reading

Yonge Subway Headway Study 1988 (Part 6)

I am inserting a little sidebar into the discussion because my archives yielded up an exhibit not included in the TTC’s report.

This is the demand analysis shown in Chapter 2 which establishes the need for additional capacity on the Yonge line, specfically at Bloor-Yonge Station.

This is the companion chart from the Network 2011 study showing the projected demand on the rapid transit network with the addition of lines on Eglinton West, Sheppard, the DRL and the Spadina/Harbourfront line.

 

 

These two charts appear side by side in the Network 2011 study, but only the first one was included in the Improved Headway Study.

The DRL diverts a good chunk of traffic off of the Yonge line below Bloor, although this is partly backfilled by new riding pouring in at the top of the line. (Other studies had different versions of this line including routes that went further north.)

The projected demand on the Spadina line, 7,500 per hour, was rather high considering it was to be a surface operation crossing many streets. Oddly enough, only the Harbourfront portion was built initially, and we waited until 1997 for the Spadina streetcar.

I don’t intend this to be a definitive example of a demand model (I don’t think “definitive” is a word one can use in that context anyhow), but it points out how the importance of the DRL was recognized over 20 years ago. Indeed, in the Network 2011 plan, it was the second priority for construction with 1st place going to a Sheppard line only as far east as Victoria Park.

Yonge Subway Headway Study 1988 (Part 5)

In this section, we begin Chapter 4 of the study with a description of the centre platform option at Bloor-Yonge Station.

Some of the work needed for this scheme was built during construction of 33 Bloor Street East and the Toronto Parking Authority lot between Hayden and Charles Streets.  The TTC took advantage of the subway structure being uncovered to widen the station and replace the centre columns with a roof spanning both platforms and tracks.  As you can see from visiting the station, this work ends at the northern third of the station because this is physically inside the structure of The Bay.

The section on construction feasibility describes what is necessary to continue this layout further north and it involves, among other things, closing the Bay’s concourse during construction.  That entire passage is almost surreal because it details problem after problem with the construction, but forges bravely onward.  There’s also the small matter of closing Bloor-Yonge Station because the existing platforms must be removed before the tracks can be relocated.

Continue reading

Yonge Subway Headway Study 1988 (Part 4)

This installment completes Chapter 3 of the study with the evaluation of alternative signalling strategies.  The recommented alternative is Automatic Train Control, no surprise there, based on the premise that it provides the maximum benefit versus the expenditure.  Underlying this, however, is the goal of a 90-second headway and the increasing challenges to subway operations as the headway drops.  ATC is treated as a means to achieve this dubious goal rather than a worthwhile move in its own right.

Continue reading

Yonge Subway Headway Study 1988 (Part 3)

This section presents considerations for the vehicle fleet and yards required to house these cars.  An important consideration for any decrease in headway is that the number of trains in service goes up.  This generates added capital and operating costs for an expenditure that addresses only peak period demand.

A proper comparison of lines would look at what happens if the fleet is expanded (regardless of the technology) elsewhere so that new off-peak service is available in a corridor that does not now have rapid transit.

As we will see later, the additional vehicles are a substantial portion of the total project cost for peak headway improvements on an existing line.

Continue reading

Yonge Subway Headway Study 1988 (Part 2)

This thread began with an introduction to the “problem” of capacity at Bloor-Yonge Station which dates back to the 1980s, an era when all expansion of capacity for travel from the suburbs to downtown was assumed to be on the subway network.  If you accept that premise, then it follows that massive expansion of subway capacity is absolutely required.  However, as we have recently seen from demand projections by Metrolinx, when there are good alternatives to the existing subway, people may find other ways to get downtown.

In this section, I will present another chunk from the long Chapter 3 in the TTC’s 1988 study.  This part includes descriptions of four ways to achieve shorter headways on the Yonge line through signalling changes.

Continue reading

Yonge Subway Headway Study 1988 (Part 1)

Recently, there has been a lot of discussion here about the practicality and desirability of adding capacity to the Yonge-University subway.  My position is clear:  there is more to be gained by adding new capacity in other corridors that can, in addition to relieving pressure on the Yonge line, provide alternatives in the transportation network to what now exists.

For twenty years, the focus has always been on beefing up the Yonge line, and this reflects the TTC’s long-standing tradition of looking only at their network when planning transit capacity.  Earlier subway expansion schemes completely omitted the GO Transit network from calculating potential regional demand and modelled all growth in riding on the subway system.  The effect of this shows up in the Network 2011 proposal that projected large increases in subway demand.  Those increases triggered a study in 1988 of what could be done to add capacity to the Yonge line, and we are still living with some of the fallout from that study today.

When I dug the report out of my archives, I thought that I would only scan, edit and post a few chapters. However, I soon realized that the arguments of 20 years ago are worth reading today because they are instructive both for the basics of transit operations, and because they show the origins of some current thinking.

For convenience, I have chopped up the document into sections.  The text, which was originally doublespaced typewriter (Courier) format, has been converted to single spaced Times Roman (yes, I know some of you just hate Times Roman).  Some exhibits that didn’t lend themselves to text-based conversion have been scanned separately as jpegs.

The first installment (this post) contains chapter 2 and the first parts of chapter 3 of the Final Report (chapter 1 was the Executive Summary) dealing with the problem of projected congestion and the various ways in which signal changes could be used to reduce headways.  In the next installments, we will see:

  • detailed descriptions of four schemes for signalling changes to achieve closer headways
  • a discussion of vehicle requirements
  • conclusions and recommendations for signalling
  • four schemes for a reconstructed Bloor-Yonge Station
  • evaluation of impacts at other stations and terminals, notably Finch and Wilson
  • options for the Yonge-Spadina loop
  • final summary and recommendations

Chapter 4 (the Bloor Yonge schemes) contains useful material to those of you who have been, figuratively speaking, drawing lines on maps for the past few weeks with possible alignments for additional tracks.  It helps to know the lay of the land both above and below ground.

Because we have already had quite a lot of discussion about routing alternatives, I will exercise my editorial prerogative to delete or severely cut repetitions of past discussions.  The main reason I am putting this material up is to show what was actually considered and how the history of past studies like this colours future projects.  That’s an important context for the current Regional Transportation Plan discussions — things that seem trivial today will take on the aura of historical received wisdom in less than a decade.  Maps drawn on stone tablets are hard to change.

Continue reading

Transit City — The Movie

Today’s TTC meeting brought us an update on the various parts of the Transit City plan.  You can read the full report yourself, and there is a quick review of the status of various lines and studies below.

Meanwhile, the TTC is starting a media campaign to tell people about Transit City and about LRT.  You can watch the video on the TTC’s website.  Although it is a breath of fresh air to see the TTC promoting LRT after all these years, there are a few oddities in this piece (the timings where they occur are included below).

  • (0:39) “Work on Transiy City is already well underway.”  Hmmm … a few traffic barriers does not make a construction project.  I wonder why they don’t show the upheaval on St. Clair?  Shortly later we see a new car mockup superimposed on the westbound stop at Yonge Street.
  • (0:55)  “What is Light Rail Transit?”  We learn that LRT is used around the world including, wait for it, in Vancouver!  Er, ah, there’s a heritage streetcar line running with a former BC Electric interurban car, but no LRT.  This is a howling error.  Other cities shown on the world map are many fewer than the actual inventory.
  • (1:15)  “LRT can operate in a street, but has the flexibility to operate underground like a subway.”  LRT advocates will be amused to hear that their chosen mode has the “flexibility” to be just like a subway, when the real issue is the inflexibility and cost of 100% grade separated modes.
  • (1:50) Light rail is bigger than standard streetcars, and allows level boarding from platforms.  It’s nice to hear how LRT is a streetcar, but not a streetcar.
  • (2:10) LRT cars don’t need loops!  Amazing what you can do with modern technology.  See also Kennedy Station Loop.
  • (2:20) All door loading … but wait .. it’s a subway car!
  • (2:38) LRT will be separated from the effects of traffic congestion, not to mention pesky “transit priority” signals if the animation can be believed.
  • (3:32) Streetscaping.  Aside from the gigantic, fast-growing trees (maybe they’re from Vancouver too), note the typical suburban layout with wide setbacks of buildings from the street.  Contrast this with later illustrations of dense suburban redevelopment.
  • (4:05) Transit will be an even better travel alternative.  With a new subway train?  What’s that doing here?

The map of projects reflects the original Transit City announcement because many possible changes are still under study by both TTC and Metrolinx.

Transit City project updates follow the break.

Continue reading