501 Queen and the Effect of the King Street Pilot (Updated)

Updated November 27, 2018: A major section has been added comparing travel times between Jarvis and Bathurst on Queen and King Streets.

With the King Street Pilot a year old, one area that also deserves a review is the effect it has had on transit service on Queen Street. The short answer is “very little” with the usual caveats about seasonal variations and unusual events that complicate direct before and after comparisons.

The charts presented here cover the period from March 2016 to October 2018, the same period as King Street charts in recent articles. Selected images are included in the post, and more extensive sets are linked in PDFs.

(Note that the level of detail in the three-year charts is such that they suffer when reduced in size to the scale of a blog post. Click on any of them to open a full size version in a new browser tab.)

Major Events on Queen Street

More so that on King Street, Queen has been affected by many construction activities over the three years, and of course it also has more special events disrupting service in the area parallel to the pilot on King. The major events affecting travel times between Jarvis and Bathurst Streets are highlighted in these charts.

  • April 2016: Reconstruction of King and Charlotte diverted service onto Queen adding to streetcar running times there primarily through delays where King cars turned off of Queen without assistance from traffic signals.
  • May to December 2016: Water main reconstruction on Queen west of Spadina triggered a long-running diversion of service via Spadina to King. The times shown are measured between King and Bathurst and Queen and Jarvis for this period where vehicles were diverted.
  • September 2016: Although TIFF closed part of King Street, the service was split rather than diverted. There is no effect on Queen running times beyond that already seen for the diversion of the 501 route.
  • May to August 2017: Construction continued for another summer on Queen including completion of work started in 2016 and replacement of the pedestrian bridge at Queen and Yonge. Buses operated on 501 Queen.
  • September 2017: Streetcars returned to Queen. Reconstruction of Dundas from Church to Yonge caused some traffic to shift south to Queen. King services diverted onto Queen during the opening weekend of TIFF.
  • October 2017: Reconstruction of Queen & McCaul caused Queen service to divert via King between Church and Spadina.
  • November 2017: King Street Pilot begins.
  • June 2018: Construction delays.
  • September 2018: TIFF diversions delay Queen service.

Chart Format

As with the King Street analysis, the charts here show the 85th percentile values for travel times in orange. This includes most trips across the area parallel to the pilot on King. The median value (50th percentile) is shown in blue. Half of the trips took longer and half shorter than this value. When these values track close together, most trips will lie in a fairly narrow band of values (see details for October 2018 later in this article). Where the lines pull apart, travel times seen by riders will have more variation in length.

Where the route was on diversion in 2016, the time shown is measured between Bathurst & King to Jarvis & Queen via Spadina.

For the diversion in 2017, the time is measured between Bathurst and Jarvis on Queen, but includes the diversion both ways via Spadina, King and Church.

Where a value drops to zero, this indicates that no car was observed between the two points usually due to a short-term diversion around a major blockage.

AM Peak 8 to 9 am

Westbound

The beginning of the pilot in November 2017 had no effect on AM peak travel times. The spike in late June 2018 was caused by construction delays according to TTC eAlerts.

Eastbound

Continue reading