The June 24 schedule change brings a major upheaval to the streetcar routes and the usual round of summer service cutbacks.
2018.06.24_Service_Changes
Construction Projects Ending
Queensway & Lakeshore
Streetcar service will, after a long absence, be restored west of Humber Loop. The new service design is similar to the pre-shutdown arrangement where a separate service, the old “507 Long Branch” in everything but name, will operate between Humber and Long Branch Loops. Late in the evening and overnight, streetcar service will run through from Neville to Long Branch.
Weekdays Saturdays Sundays
First EB through trip 11:02 pm 10:42 pm 10:32 pm
First WB through trip 10:09 pm 10:00 pm 9:52 pm
During the AM peak, five trips will operate through to downtown via Queen arriving at Yonge Street starting at 8:05 am and every 15 minutes after to 9:05.
Midday service at 9 minutes will be slightly better than the 10-minute network would require because the dead-head time to and from Russell Carhouse for one car is not worth the effort.
Recovery time for the “Long Branch” service will be scheduled at Humber Loop to maximize the overlap with the main service on 501 Queen for transfers between cars.
Gerrard & Parliament
With the completion of construction at Gerrard and Parliament, the 65 Parliament and 506 Carlton routes return to normal through this location. However, the 506 Carlton will divert a bit further east (see below).
New Construction
Broadview Avenue from Dundas to Gerrard
The track on Broadview from Dundas to Gerrard, including both intersections, will be rebuilt over the summer months. This affects many routes.
For the duration of the project, the 504 King, 514 Cherry and 503 Kingston Road routes will operate as a single “504” route with three services:
- 504A streetcars will operate from Dundas West Station to Distillery Loop. This will be scheduled entirely with low-floor cars to preserve accessibility on Cherry Street. Note that the ramps will not be deployed on Roncesvalles because the “bump out” stops are incompatible with the ramps. This problem will be fixed in 2019 while streetcar service is removed from Roncesvalles for the intersection reconstruction at Queen Street.
- 504B/C streetcars will operate from Dufferin Loop to Bingham Loop (weekdays daytime) and to Woodbine Loop (evenings and weekends). This service will use CLRVs.
- 504D buses will operate from Broadview Station to King & Parliament.
Overnight service will operate with a 304 streetcar service from Dundas West Station to Woodbine Loop, and a bus service from King & University to Broadview Station. The streetcar service will be scheduled to use low-floor cars.
With the shuffling of buses between routes, the 502 Downtowner peak period service will revert to streetcar operation for the summer using CLRVs.
While construction is underway south of Gerrard to Dundas, diversion routes will be:
- 504D King bus: From Broadview Station south to Gerrard, west to River, south to King, west to Parliament looping via Parliament, Front and Berkeley.
- 505 Dundas bus: From Broadview Station south to Gerrard, west to River, south to Dundas.
- 506 Carlton bus: No diversion.
While construction is underway at Gerrard and Broadview (starting in late July), diversion routes will be:
- 504D King bus: From Broadview Station south to Jack Layton Way, then west and south via St. Matthews Road to Gerrard, and west via the River Street diversion as above.
- 505 Dundas bus: Same diversion as 504D King to bypass the intersection at Gerrard.
- 506 Carlton bus: Via River, Dundas and Logan both ways.
These diversions will add a lot of turning buses to the intersections at River & Gerrard, and River & Dundas. One can only hope that the City Transportation Department will adjust the traffic signals to suit this arrangement.
Main Station
Construction continues at Main Station, but new work by Hydro has further affected routes in this area, and diversion routes around work on Main will be implemented as needed through the summer.
The 87 Cosburn and 64 Main routes will be interlined. On weekends, 64 Main buses will divert northbound via Kingston Road and Woodbine to Danforth on weekends due to City road construction.
Keele Yard
Due to maintenance work at Greenwood Carhouse, movements to and from the yard will be reduced during the daytime weekdays. Four peak trains that normally return to Greenwood between the rush hours will instead use Keele Yard.
Lawrence West Station
Paving work at Lawrence West Station will prevent buses from using it as a terminus. The 52G Lawrence to Martin Grove service will be extended east to Yonge Street, along with the 59 Maple Leaf route. 109 Ranee buses will serve the station from the street.
Summer Route Changes
The 29 Dufferin bus will not operate into Exhibition Place during the summer because of many events that block roadways. All service will terminate at Dufferin Loop.
The 30 Lambton bus will be extended into High Park on weekends.
The 121 Fort York–Esplanade bus will be extended to Ontario Place.
Evening service will be improved on 509 Harbourfront and all recovery time will be scheduled at Exhibition Loop to avoid delays at Union Station.
New/Improved Services
The 83 Jones bus service will be improved off-peak to provide more frequent access to Leslie Barns as the infrequent evening and weekend operation interferes with operator access and crew changes.
There is a particular irony to better service on this route. In 1972, a group of local residents forced the TTC to hold its Board meetings in public as required under the Municipal Act with the intent of making a deputation asking for a bus on Jones Avenue. This was the beginning of open meetings at the TTC, a residents’ group lobbying for a route the TTC did not want to run.
A new route, 176 Mimico GO, will operate between the Lakeshore/Park Lawn area and Mimico GO Station during peak periods on a 30 minute headway to improve access to the GO service.