TTC Service Changes Effective Sunday May 7, 2017

The May 2017 schedules will bring many changes to bus and streetcar routes across the city. The majority of these fall into three groups: construction-related changes and diversions, seasonal changes mainly related to the end of spring term at post-secondary institutions, and changes in the type of equipment assigned to routes.

Construction and Equipment Type Changes

On 501 Queen, buses will replace streetcars over the entire route from Neville to Long Branch. Two services will operate from Neville with one ending at Park Lawn Loop and the other running through to Long Branch. This restores the route structure as it was before the service west of Humber Loop was split off from the central part of Queen.

The 501L Long Branch buses will operate via Windermere and Lake Shore Boulevard as the 501L Queen bus does now. The 501M Marine Parade service will be replaced by the 501P Park Lawn buses which will operate westbound on the same route as the 501L, but eastbound via north on Park Lawn and east on The Queensway.

The 301 night service will operate as a through bus route from Neville to Long Branch.

To provide enough buses for 501 Queen, streetcars will return to other routes:

  • 504 King will be entirely operated with streetcars, with many runs using ALRVs (the two-section cars) displaced from Queen.
  • 503 Kingston Road will be operated with streetcars, and will be extended west to Charlotte Loop because Wellington Street is under construction. (502 Downtowner will remain a bus operation.)
  • 511 Bathurst will return to streetcar operation initially with ALRVs, but will transition to low-floor Flexity service as new cars become available.

Although 501 Queen will operate with buses through the summer, possibly to Thanksgiving, the planned intersection replacements at Coxwell and at McCaul will not occur during this period as there is too much other work concurrently according to the TTC’s Brad Ross. The dates and service arrangements for these two projects have not yet been announced.

The 505 Dundas car, which as I write this, is about to begin a diversion via Bay, College/Carlton and Church bothways for water main construction, will shift to a longer diversion via Carlton, Parliament and Gerrard beginning in May when the Dundas/Parliament intersection is rebuilt. The 65 Parliament bus will also divert around this work via Gerrard, Sherbourne and Shuter.

Temporary schedules were implemented in March for 510 Spadina and 506 Carlton in anticipation of extra traffic from a Queen diversion that was not implemented (510) and for overhead work on Gerrard that has been deferred (506). These routes revert to their normal schedules in May.

The 514 Cherry streetcar will now be scheduled for all low-floor service, and the weekday midday headways will be widened from 10 to 15 minutes.

In order to avoid unpredictable traffic conditions for Metrolinx Crosstown construction, the evening interlines of routes 5 Avenue Road & 56 Leaside, and of 51 Leslie & 61 Avenue Road North, will be discontinued. These routes will operate independently at all hours.

The schedule for the 34C Eglinton East service to Flemingdon Park will be revised to give operators more layover time at Eglinton Station due to construction conditions.

The bus loop at Royal York Station will be closing for about 18 months for reconstruction, and this will eliminate the loop now used by four routes. Services will be interlined on 73 Royal York & 76 Royal York South, and on 15 Evans & 48 Rathburn. The 315 Evans night service will be extended to Islington Station.

Construction at Coxwell Station has completed, and the interline of 22 Coxwell & 70 O’Connor will cease.

Seasonal Changes

Service will be improved on weekend evenings on 509 Harbourfront. This route is now designated as a low-floor route and will be operated entirely with Flexitys.

A Sunday PCC service will operate as an unscheduled extra on the 509 subject to availability of a car and operator from about noon to 5:00 pm.

Services to many campuses will be reduced to reflect lower demand during the summer term on various routes: 38 Highland Creek, 41 Keele, 44 Kipling South, 188 Kipling South Rocket, 60 Steeles West, 75 Sherbourne, 134C Progress/Centennial, 191 Highway 27 Rocket, 195 Jane Rocket, 196 York U Rocket, 198 UTSC Rocket, and 199 Finch Rocket.

Other seasonal changes affect 92 Woodbine South, 121 Fort York-Esplanade and 165 Weston Road North. Note that the 121 will operate to Cherry Beach during all service hours this summer rather than selected periods as in the past.

A Rose By Any Other Name

In anticipation of the TYSSE opening in  late 2017, the name of Downsview Station will change to Sheppard West. This allows the “Downsview” label to shift to the new “Downsview Park” station.