Updated August 25 at 10:30 pm:
For some time, I have been working on a different version of the program that produces the headway and link time charts, and this work is now complete. This will simplify future work on other routes, but also it cleans up the existing charts.
I have made the following changes to the charts that are linked from this post:
- The data points are shown on the charts so that readers can see exactly where they are. Each point represents a car on a specific headway at a specific time, or a car’s travel time between two points.
- I have added a moving average trendline based on 7 consecutive data points to show the reliability (or lack of it) of the detail as opposed to the longer term average which approximates the scheduled headway (provided there are no delays or short turns).
Otherwise, this post is unchanged. Information about other days will appear soon.