The weekend of Sept 23-24 saw another shuffle in the streetcar diversion list on which I last reported a few weeks ago. This round of changes is triggered by two events:
Metrolinx work on the Lakeshore East corridor at Queen & Degrassi streets prevents streetcar operation through the underpass, and at times the road will be closed to all traffic.
Toronto Hydro work on Queen West has completed to the point that streetcars are no longer diverting via King Street through Parkdale.
Services now operating on Queen Street include:
501L (aka 507) Queen bus from Long Branch to Dufferin. These buses do not appear on transit apps.
501B Queen bus from Bathurst to Broadview & Gerrard, with downtown diversion around Ontario Line construction.
501 Queen streetcar from Sunnyside Loop to McCaul Loop.
501D (aka 513) Queen bus from Victoria Street (looping via Church, Richmond and Victoria) to Neville Loop. These buses appear on transit apps as 513 Queen East.
503 Kingston Road bus between the Don River and Kingston Road.
During certain periods, the underpass at Degrassi will be closed to all traffic and the 501/503/513 services will divert via Broadview, Dundas and Carlaw.
Complete closures are planned for Sunday, September 24 all day, and from Friday, September 29 at 10pm to Monday, October 2 at 4am.
The 504 King car operates only west of Distillery Loop pending completion of road and track construction on Broadview from Gerrard to Broadview Station Loop. Heavy construction at the loop will begin on Monday, September 25. Paving in the curb lanes on Broadview south of Danforth has begun following completion of track work.
The 72A Pape bus serving King Street East will use the same diversion around Queen & Degrassi as the Queen services, and will not serve stops south of Dundas nor on Queen east of Broadview during periods when the underpass is closed.
The 505 Dundas car no longer serves Queen Street East except between Coxwell and Woodbine Loop. It now operates via Broadview, Gerrard, Coxwell and Queen to Kingston Road.
There is no map of the current route arrangement in the east end on the TTC’s Streetcar Service Changes page, and some maps for 505 Dundas reflect its route before the shift north to Gerrard Street. The 505 Dundas section also still includes a reference to the 506C bus from Castle Frank Station which no longer operates.
The 506 Carlton car is unchanged with normal service except at the west end where cars divert to Dundas West Station due to water main construction on Howard Park Avenue.
Routes 509 Harbourfront, 510 Spadina and 511 Bathurst are operating normally.
Further to my recent post about planned service changes effective September 3, the TTC has issued a revised set of route arrangements thanks to a change in the schedule for Metrolinx work at Queen & Degrassi.
There will be four stages to the service modifications:
Sunday, September 3 to Friday, September 22 at 10 pm
Friday, September 22 at 10 pm to Friday, September 29 at 10 pm
Friday, September 29 at 10pm to Monday, October 2 at 4 am
Monday, October 2 at 4am to Sunday, October 8
October 8 falls on Thanksgiving weekend which is the October TTC schedule change date. Service arrangements beyond that point have not been announced.
The information here is adapted, with corrections, from the TTC’s website Streetcar Service Changes page. As I write this (4:50 pm, August 29), there are several inconsistencies or errors on the TTC’s site. This article is an attempt to consolidate the available information.
This is a preliminary version based on GTFS data (the standard format for transit schedules used by online services) and some Service Advisories on the TTC site. I expect to receive the full list of September service changes early in the week of August 28 and will update this article accordingly including the usual detailed comparison of service levels.
Updated August 26 at 9:15 pm: 512 St. Clair updated to reflect complete bus replacement for work at various locations on the line.
Updated August 27 at 4:30 pm: At 10:30 am on August 28, the Mayor, TTC Chair and CEO will hold a press conference at STC Station to “outline how the TTC will increase service beginning September and into the fall.”
Updated August 29 at 5:30 pm: Due to changes in the Metrolinx schedule for work on the Lake Shore East Queen Street bridge, there has been a further revision of planned service. Please see this post for details.
At the TTC Board meeting on July 12, 2023, there was a brief discussion of the problem of short turns on streetcar lines. The information provided by management was, shall we say, less than a full accounting of what is actually going on.
This issue flared up many years ago particularly with short turns of service in The Beach among other areas, and in general a problem with erratic, gap-filled service on the outer ends of routes. TTC management committed to reducing or eliminating this problem, and to that end there was a “no short turns” policy that everybody seemed to know about at the operational level, but which was officially denied.
The stats did go down, but looking under the covers showed that not all was well:
Short turns are a bona fide service management tactic for dealing with delays to restore even spacing of service. There is nothing wrong with a short turn of some cars in a parade because this will restore service sooner than if every car trundles to the terminal and they return in a pack.
The official count of short turns fell to almost zero. However, this was due in part to selective reporting that was clear to (a) anyone actually riding the system and (b) anyone looking at vehicle tracking data.
Rick Leary got the equivalent of a gold star from the Board who frankly did not know any better, but occasionally wondered why claims of improved service did not align with complaints from constituents. The standard excuses for occasional upsets due to congestion and construction were regularly trotted out even though service could be erratic at times and locations when these were clearly impossible.
The charts below from the July 2023 CEO’s Report show the official count of short turns on the streetcar and bus network. An important factor in comparing the two is that the buses overall have many routes where congestion and construction do not affect most, if any, trips. The figures are not broken out by route to flag the “bad actors”. Moreover, the values are presented as a percentage of all trips so that time-of-day effects are hidden.
The “no short turns” policy implementation is quite clear in the data from Fall 2018 through Spring 2019. In reviewing actual short turn counts from tracking data, I have found that the values are consistently under-reported, and they do not represent actual conditions. For example, the proportion of service outbound on 501 Queen from downtown (as counted at Woodbine vs Greenwood) reaching Neville Park ranges from 100% to below 50% in January to June 2023.
Updated July 15, 2023: In June 2023, the TTC changed its reporting of short turns from an absolute number to a percentage. The scale of these charts does not make sense because the streetcar chart claims it is per 1000 departures, but cites a percentage (per 100). For comparison, the May 2023 charts are below.
I have written many times on this site about service quality and there are many factors at play including:
Unreasonably short or long scheduled travel times. This may sound like an odd pairing, but both can produce erratic service.
Too short times lead to short turns to keep operators on time especially for crew changes.
Too long times lead to extended layovers at terminals.
Lack of headway discipline at terminals and along routes.
Lack of headway management for vehicles re-entering service from a short turn to “split” a gap rather than simply running behind a through vehicle and carrying few passengers.
There are, of course, ad hoc situations where accidents, short-term construction or special events produce conditions that are not “standard”. These are normal and have to be managed to the degree possible. One side effect of the overall reduction in service on streetcar lines to a 10 minute level on many routes is that there is no spare capacity when delays occur, and wider headways make the effect on riders of any missing vehicle (either not in service or short-turned) greater.
This is not the first time the system encountered that problem, and tuning out surplus capacity has been a generic issue across the network any time budget “efficiency” takes precedence over service. The phrase “adjusting service to meet demand” goes back over four decades.
Service standards that allow for some empty space on vehicles are important because they guarantee some flexibility to absorb small problems without service collapsing. An analogy for motorists is that a highway totally jammed with cars does not move traffic at all well, and some empty space is necessary to ensure the road is usable. On transit, empty space is viewed as waste while on our roads no congestion is a holy grail.
The remainder of this article reviews the short-turning situation on most streetcar routes and the underlying causes.
When I receive the detailed plans for coming schedule periods, I will post the usual omnibus articles.
Updated July 13, 2023: The eastern terminus of the 506C bus has been corrected to Victoria Park Station.
Updated July 14, 2023: The 506 Carlton street service will resume on Gerrard East to Coxwell on Monday, July 17.
Updated July 15, 2023: The map of the revised 506 Carlton routing has been posted by the TTC.
Week of July 17 (Updated)
With the completion of water main and track work at Coxwell & Lower Gerrard, the 506 Carlton cars will be extended east from Broadview via Coxwell to Woodbine Loop on July 17. Service to Victoria Park Station will continue to be provided by the 506C Carlton bus.
Through bus service on Coxwell from Danforth to Queen will be restored on July 30 when 22 Coxwell return.
July 30
Several changes will occur on Sunday, July 30 including adjustments in response to demand levels, scheduling improvements and construction work.
The 31 Greenwood bus route which has been operating temporarily via an expanded south end loop will be permanently extended to Queen & Eastern Avenue.
The 506 Carlton route will be shifted to Dundas West Station as its western terminus to permit water main construction on Howard Park Avenue.
September 3
Streetcar service will return to Long Branch with 501 Queen cars running to Humber Loop, and 507 Long Branch cars from Humber to Long Branch. The peak period 508 Lake Shore (via King) will also return.
Streetcar service will return to Upper Gerrard and Main Street Station with completion of construction work there.
Streetcars will be replaced on Queen East and on St. Clair for construction.
On 501 Queen, the Ontario Line work at Degrassi (east of Broadview) will require bus service in place of streetcars. As previously announced, the temporary 505 Dundas service to Woodbine Loop will be routed via Gerrard and Coxwell due to the Metrolinx work on Queen.
On St. Clair, reconstruction of St. Clair West Station Loop will require buses over the entire 512 route. This will also affect 33 Forest Hill and 126 Christie (which will interline rather than looping at St. Clair West), and 90 Vaughan which will be extended south to Bathurst Station.
Reconstruction of Dufferin Loop will alter the south end loop arrangements for the 29/929 Dufferin services, and the 504B King to Dufferin service will be extended to Roncesvalles.
The duration of these new construction projects has not been announced.
Oh the irony! The TTC’s Annual Service Plan consultations are all about how to handle a few (but not all) of the construction projects coming in 2024, but the elephant in the room remains bad communications and changes on the fly.
The new routes implemented in May and June 2023 were in cases impractical thanks to a combination of unduly optimistic running times in schedules, less than adequate transit priority and line management whose priority was not the provision of well-spaced, reliable service. Several changes will take effect on July 4 and 5 to correct some of these problems, but the information is scattered through the TTC’s website, if you can find it at all.
First, a summary of the changes:
The 501/504 shuttle bus (an ad hoc service implemented to cover for the absence of the 503 Kingston Road car to King Street downtown) will be rebranded as “503” and will serve Kingston Road to Bingham Loop until 8pm every day. This will become a scheduled bus service at the end of July, and will revert to 503 streetcars likely in October.
The 505 Dundas car will only operate east on Queen from Broadview to Woodbine Loop, except after 8pm when service to Bingham will be provided by streetcars.
The 506 Carlton car will only operate to Queen and Broadview and will return west to route via Queen and Parliament Streets without running east to Woodbine Loop.
The 512 St. Clair car will be restored, temporarily, west of Lansdowne to Gunns Loop. While it lasts, this will correct for the erratic service now provided there by the 47 Lansdowne extension.
The challenge is to find out that this is happening to your route. The TTC website is very poorly organized with information in many places that is inconsistently placed and linked (or not) to the main route pages affected. Some items are out of date, but remain in place to confuse riders. Some items describe major changes but are hard to find if you don’t know the site in detail.
These are the hallmarks of a site maintained by many groups each with its own (probably jealously guarded) responsibility for providing information. Nobody appears to care about overall site consistency and ease of navigation, or if they do, are in any position to change what is a clearly broken process. Some information is just plain wrong indicating that whoever created or updated the page was either sloppy, or does no know what is actually happening.
Updated July 4, 2023 at 7:10am: Changes to the TTC website since this article was posted are noted in various places below.
Updated July 5, 2023 at 4:30pm: Changes to the TTC website since the July 4 update are noted throughout the article.
This article describes the transit services affected by various construction project in the east end and the changes that will take effect on Sunday, June 18, 2023. This is a follow-on to my original article, and some of the information there is out of date due to changes in the TTC’s plans.
Updated June 14, 2023: Information about the 304 King Night Bus added.
Construction projects affecting streetcar service are summarized in the map below. Some of this work is underway or completed already.
TTC overhead upgrades for Flexity streetcar operation with pantographs on King and Kingston Road was completed in the Spring. All routes in the system now operate with pans, although there are selected areas that have not been modified yet and operators must switch to trolley poles if cars run there.
Repairs to the Queen Street Don Bridge were completed a few weeks ago, and streetcars are now operating over the bridge, albeit only for carhouse moves and short turns.
Repairs at Main Station are underway and will continue through the summer.
The sewer work at Coxwell & Gerrard has completed, and work will now shift to track replacement.
Sewer work on Broadview is underway.
Changes Effective June 18, 2023
Here is a map showing the route configuration from June 18 to July 29, 2023.
The major service change is that there will be no north-south service on Broadview from Danforth to Gerrard due to track and road reconstruction. Work in this area includes:
Reconstruction and expansion of Broadview Station streetcar loop to accommodate two streetcars at a time on both the 504 King and 505 Dundas platforms. The first phase of this (June 18 to early July) will require Broadview to be closed to traffic from Erindale to Danforth for track replacement. Work will shift into the loop in a second phase to allow streets to re-open. The planned expansion of the loop has been deferred.
Track reconstruction between Gerrard and Danforth. The first phase (July 4 to early August) will run from Victor to Sparkhall with track storage between Gerrard and Victor. (See maps in the original article linked above.)
The affected routes are:
504/505 Broadview/Parliament shuttle bus: This route will not operate and there will be no bus service on Broadview between Danforth and Gerrard and beyond to King & Parliament. This will be replaced by:
72A Pape: This branch of the Pape bus now operates to Pape and Eastern Avenue, but it will be redirected and extended effective June 18 to operate west from Pape on Queen and King to loop as Parliament the way the 504/505 has been doing.
The 304 King Night Bus will operate to Pape Station via Queen, Carlaw, Riverdale and Pape.
Not shown on the map but also effective on June 18:
100 Flemingdon Park: This route now operates to Broadview Station, but it will shift east to Pape Station effective June 18.
8 Broadview, 62 Mortimer and 87 Cosburn will remain at Broadview Station, but looping arrangements have not been announced for the various stages of construction.
In the previous article, based on maps in a March 2023 presentation regarding Main Station, there was a new route “519” that would split off the west end of the 72B Pape to Union Station service. This proposal is not part of the June 18 package, and the 72B will continue to serve Union Station.
The 501B Queen shuttle bus will be modified to improve its westbound connection with the 501 Queen streetcars. Before June 18, the 501B loops north on Broadview to Gerrard, west to River and south to Queen. This loop will be changed so that buses run south on River only to Dundas, and then return east to Broadview and south to Queen. This will provide an overlap between the 501B and 501 services at Broadview in both directions.
The 501 and 505 streetcars will continue on the same diversions and schedules:
501 Queen cars will operate via McCaul, Dundas and Broadview to bypass Ontario Line construction, and thence east to Neville Loop.
505 Dundas cars will operate via Broadview, Queen and Kingston Road to Bingham Loop at Victoria Park.
The 506 streetcar diversion will be changed westbound:
506 Carlton cars will operate eastbound from Gerrard and Broadview via Broadview and Queen to Woodbine Loop at Kingston Road.
Westbound 506 cars will change their route. Until June 17 it is (officially) via Queen, Broadview, Dundas and Parliament to the regular route at Gerrard. This will change on June 18 to run via Queen and Parliament to Gerrard. Many cars do this already.
The schedule for 506 Carlton has not been updated and is still short of running time. Many cars will likely continue to short turn at Broadview and return west rather than going east to Woodbine Loop.
The pseudo-503 Kingston Road service will continue to be provided by 504/501 buses running from Kingston Road & Queen to York & King. These buses are now scheduled as part of the 501 service and should appear on tracking apps. Current plans call for the 503 service from Bingham Loop to King & York to return as a bus at the end of July, and as a streetcar in the Fall.
Track reconstruction at Coxwell & Lower Gerrard will cause changes in three routes:
22 Coxwell, which has been operating between Danforth and Queen with diversions enroute, will be suspended.
31 Greenwood will operate from Coxwell Station (its current terminus during reconstruction of its home station for accessibility) to Woodbine Loop via Danforth, Greenwood and Queen. The routing at the south end via Eastern Avenue is not known as I write this.
506C Carlton bus service will continue to run between Castle Frank and Victoria Park Stations, but it will divert via Greenwood, Danforth and Coxwell to Upper Gerrard in both directions. 506C buses will make on street stops at Coxwell & Danforth. They will not enter Coxwell Station.
There will be no service on Coxwell between Upper Gerrard and Queen. The normal 22, 31 and 506C routes will resume on July 30.
Reconstruction of Main Station continues through the summer. All of the bus changes with route interlines and extensions to Victoria Park Station will remain in effect.
The TTC has three key messages about the pending changes.
Among various problems that became evident with the many route changes on May 7 was the deep mismatch between advertised and delivered service.
Both the 501 to Neville and the 505 to Bingham Loop were often missing in action short turning usually at Woodbine Loop (Kingston Road & Queen, named after the former racetrack).
Aside from the scenic tour the 501 Queen car takes via McCaul, Dundas and Broadview, plus the usual congestion on Dundas Street, another congested location was Broadview northbound between Queen and Dundas.
In that segment, three services, 501 Queen, 505 Dundas and 506 Carlton, were all queuing for the left turn at Dundas, compounded by 504/505 buses attempting to serve the northbound stop while blocking both lanes of traffic.
Under these conditions, it was impossible for any of these services to stay on time. The situation has been partly remedied by using traffic wardens to manage the intersection, but even that depends on ensuring that streetcars get priority all of the time despite the signal setup there.
As the week of May 7 wore on, I noticed that a lot of 506 Carlton cars were not getting east of Broadview. Riders complained about cars going out of service, and I received a tip from a reader about scheduled travel time changes.
This sent me into the electronic versions of TTC schedules which are published for use by trip planning apps and which also are the source for info on their own website. These files give a stop-by-stop schedule for each vehicle on a route and allow very fine-grained examination of the schedule design. What I found was quite surprising.
Over the portion of 506 Carlton common to the March 2023 schedules when all streetcars ran through to Main Station and the May 2023 versions with service diverting to Queen Street East, the running times were substantially shorter in May than in March. The schedule as designed could not be operated, and it has become common practice to turn most of the service back westward from Broadview. Here are charts comparing the scheduled travel times.
The eastbound comparison on the left covers the route from High Park to Broadview where streetcars turn off of their usual route. The westbound comparison covers the route from Parliament, where cars rejoin the route, to High Park. Each dot is one scheduled trip plotted with the departure time on the X-axis (horizontal) and the trip length on the Y-axis (vertical). Values move up and down over the day based on expected conditions on the route.
In almost every case the March travel time is longer than the May time. It is no surprise that streetcars have to be short-turned when the schedules work against them. How the schedules came to be designed this way is a mystery, but it creates big problems for riders.
This sort of thing cannot be corrected overnight, but in the meantime the TTC should formalize the route change and post notices everywhere so that riders know how the route will actually operate. New schedules will come in late July when Metrolinx closes Queen at Degrassi for preparatory work for GO corridor expansion and the Ontario Line, and all of the streetcar routes will shift north to Gerrard. With luck, they will reflect actual travel time requirements.
Shifting the westbound Carlton cars off of Broadview at Dundas reduces the number of turns that the intersection must handle per hour. A related issue will be the degree to which traffic wardens intervene to move transit vehicles through this choke point in the network. Both of these changes improve travel times for 501 Queen and 505 Dundas cars and could contribute to more reliable service east of Queen and Kingston Road to the two terminals. I will be monitoring this over coming weeks.
Footnote:
For the benefit of readers who don’t know the whole context, the 506 Carlton car normally operates to Main Station via Gerrard. During construction at Coxwell, it has been diverted via Broadview and Queen eastbound to Woodbine Loop. The westbound diversion runs via Queen, Broadview, Dundas and Parliament including a north-to-west left turn at Dundas because there is no track for a left turn northbound at Gerrard. (The TTC was planning to add one, but the message was lost somewhere in planning when the intersection was rebuilt.)
Darwin O’Connor has left a comment noting that you can get comparisons of scheduled and actual running times from his site TransSee.ca. Here is a chart comparing the situation for eastbound travel from High Park to Broadview in March (green) and May 2023 (red). The dots show actual travel times while the lines show the scheduled values.
Note that the green dots (March) are almost all below the green line, while the red dots (May) are almost all above the red line showing that with the new schedule cars would always be late, sometimes by a wide margin.
O’Connor notes that this type of analysis chart is available on his site free for the Toronto streetcar routes.
Updated June 13, 2023 at 2:50pm: The proposed expansion of Broadview Station Loop has been deferred to an unspecified date. Street trackage at the loop will be replaced this year as planned. The planned removal of most bus service from Broadview Station will not occur. Routes 8 Broadview and 62 Mortimer will continue to serve the station. Route 100 Flemingdon Park will be rerouted to Pape Station where it will interline with 72A Pape to King and Parliament.
Other changes have been made in future plans and this article should be used only for historical reference to the original plans. See also:
The full list of closures begins on p 13 of the report. There is a variety of full weekend, early closing and late opening events (check the legend to the chart).
There are fewer Line 1 closures in 2023 due to ATC (Automatic Train Control) than in 2022 because the main work is complete. However, there is a follow-up phase that will require some weekend closures for testing and implementation. Other work affecting Line 1 includes repair of station finishes on the University subway, elevator installation at Lawrence, various track replacements, and preliminary work at Finch for the Yonge North Subway Extension.
On Line 2, there will be work at Kipling to add a new storage track, preparatory work at Kennedy for Scarborough Subway Extension, preparatory work on the east end of the line for ATC installation, and some track replacement work. As usual there will be several late openings of service on Sundays for beam replacement on the Prince Edward Viaduct.
Many closures involve only an early shutdown of subway service to give a longer overnight maintenance window than would be possible with normal hours of service.
Streetcar
There is a long list of events for the streetcar system, but many of them are short interruptions of overnight/weekend work for inspections or minor repairs.
The major trackwork planned in 2023 is listed both in the report (starting on p 19) and on the TOInview map of City construction projects. The schedule implies that a good chunk of the streetcar system will be shut down at various times during the year. The Ontario Line contributes some of this to the Queen car, but the long-suffering riders on King do not get a break either after years of work at King-Queen-Roncesvalles. Note that Adelaide from York to Victoria is a Metrolinx project and so does not appear in this list.
Some of the dates in the TTC list do not align with info on TOInview. This is very common.
Parts of the schedule simply do not make sense. Some projects have far more time reserved than they should take based on past experience. Some projects will block the routes from carhouses in the east end to the rest of the network either via Queen Street or via Coxwell and Gerrard Streets, and times for these overlap.
Update: The TTC confirms that planned work on Gerrard Street will not occur at the same time as projects on Queen will block access to Leslie Barns and Russell Carhouse. See the map at the end of this section for a graphic view of the planned work.
Details of the Broadview Station Loop expansion are not yet available, nor is it confirmed whether this will actually occur.
I hope to get clarification of what is going on from the TTC.
Feb 27-Mar 26: King Street West from Close to Strachan
Mar 10-Oct 29: Dufferin Loop
Mar 24-Nov 28: Queen Street East from Carlaw to Leslie & Leslie to Greenwood
Mar 31-Apr 7: Intersection of King & Church
May 1-Nov 29: York from Queen to Adelaide (Ontario Line diversion)
May 6-July 8: Intersection of Lower Gerrard & Coxwell
May 6-Nov 21: Russell Yard
May 14-Nov 8: Broadview from Gerrard to Broadview Station
June 18-July 29: Intersection of King & Parliament
July 30-Nov 18: Metrolinx work at Queen/Degrassi overpass
Sept 3-Oct 2: Broadview Station Loop
Sept 7-Oct 29: Queen from Parliament to River & Davies to Broadview
Oct 8-Dec 16: Oakwood Loop
Oct 16-Feb12: St. Clair West Station Loop
The report does not list specifics for 2024, but info already appears on the TOInview map. It is not clear how some of this work will interact with Metrolinx Ontario Line construction at King & Bathurst. There is a proposed track and lane realignment at Bathurst & Fleet, but it is not clear whether this will actually occur, or if the planned work is simply replacement of existing special work as is. Details of the Spadina Station streetcar loop expansion are not yet available.
St. Clair & Yonge
St. Clair & Bathurst
Queen St. W from O’Hara to Triller
King St. W from Strachan to Spadina
King & Queen (Don Bridge)
Bathurst St. from Queen to Front
Bathurst & Queen
Bathurst & Fleet
College St. from Bay to Yonge
Main & Gerrard
Russell Yard (continuing from 2023)
Expansion of the streetcar platform at Spadina Station Loop
Update: The following map was included in the staff presentation to the Board on January 19, 2023.
This map contains several geographic errors:
The project labelled Queen & Yonge points at King & Spadina.
The project for St. Clair & Bathurst is shown east of St. Clair West Station rather than west of it.
The project for St. Clair & Earlscourt is shown well west of Lansdowne rather than east of it.
Carstops on Queen East at Wineva and at Waverley are shown as west of Kingston Road rather than east of it.
The project for Queen & Jarvis is shown well west of Yonge.
The project for Fleet Loop actually points to Exhibition Loop.
There are a few more, but my point in cataloguing them is that this is sloppy work and it speaks to the quality of information presented to the Board by management.
Pantograph Conversion
Gradually, and several years behind the original target date, the TTC has converted overhead wiring designed for trolley poles first to a hybrid pole/pantograph configuration, and then to pure pantograph style. A map of the current status was included in the staff presentation.
There are some problems with this map which is based off of a track plan that is itself out of date. “Wrong way” track has been removed from the one-way streets downtown, although it still appears here. Also, some work is underway on King West even this is not shown with the orange “in progress” colour. The intersection of King & Shaw had already been converted to Hybrid format when I visited it a month ago. (There are other errors in the map, but please don’t bother commenting with fixes.)
One amusing relic is the legend “Hillsdale Ave” on Lake Shore Blvd West. This was the site of a long-removed wye, the last in the system, and the street is called “Hillside Ave”. “Hillsdale” is in North Toronto.
Again, this is an unfortunate example of how the “official” records of the system are out of sync with actual conditions in the field.