What Does Scarborough Transit Need?

At the risk of re-igniting the Scarborough subway debate, I am moving some comments that are becoming a thread in their own right out of the “Stop Spacing” article over here to keep the two conversations separated.

In response to the most recent entry in the thread, I wrote:

Steve: Probably the most annoying feature of “pro Scarborough subway” (as opposed to “pro Scarborough”) pitches is the disconnect with the travel demands within Scarborough. These are known from the every five year detailed survey of travel in the GTHA, and a point that sticks out is that many people, a sizeable minority if not a majority, of those who live in Scarborough are not commuting to downtown. Instead they are travelling within Scarborough, to York Region or to locations along the 401. Many of these trips, even internal to Scarborough, are badly served by transit. One might argue that the lower proportion of downtown trips is a chicken-and-egg situation — it is the absence of a fast route to downtown combined with the impracticality of driving that discourages travel there. That’s a fair point, but one I have often argued would be better served with the express services possible on the rail corridors were it not for the GO fare structure that penalizes inside-416 travel.

We now have three subways — one to Vaughan, one to Richmond Hill and one to Scarborough — in various stages of planning and construction in part because GO (and by extension Queen’s Park) did not recognize the benefit of providing much better service to the core from the outer 416 and near 905 at a fare that riders would consider “reasonable” relative to what they pay today. I would love to see service on the CPR line that runs diagonally through Scarborough, out through Malvern into North Pickering. This route has been fouled up in debates for years about restitution of service to Peterborough, a much grander, more expensive and less likely proposition with added layers of rivalry between federal Tory and provincial Liberal interests. Fitting something like that into the CPR is tricky enough without politicians scoring points off of each other.

The most common rejoinder I hear to proposals that GO could be a form of “subway relief” is that the service is too infrequent and too expensive. What is the capital cost of subway construction into the 905 plus the ongoing operating cost once lines open versus the cost of better service and lower fares on a much improved GO network? Nobody has ever worked this out because GO and subway advocates within the planning community work in silos, and the two options are never presented as one package.

With the RER studies, this may finally change, and thanks to the issues with the Yonge corridor, we may finally see numbers comparing the effects of improved service in all available corridors and modes serving traffic from York Region to the core. I would love to see a comparable study for Scarborough.

Meanwhile, we need to know more about “inside Scarborough” demand including to major centres such as academic sites that are not touched by the subway plan.

I will promote comments here that contribute to the conversation in a civil manner. As for the trolls (and you know who you are), don’t bother. Your “contributions” only make the Scarborough position much less palatable, and I won’t subject my readers to your drivel.

John Tory’s “SmartTrack”: Will That Train Ever Leave The Station?

Late in May, John Tory launched his “SmartTrack” transit line, the centrepiece of his “One Toronto” plan. Media reps gathered for a preview at the Metro Toronto Convention Centre, and the launch was handled almost entirely by Tory’s staff. All of the background papers are on the One Toronto website, and little has been added since that event.

Even then, in the early days of the campaign, there was good reason to distrust Tory’s grasp of his own proposal, let alone a willingness to engage in debate, when he made the briefest of appearances for a canned statement to give the media clips for the news broadcasts, but answered few questions.

I was modestly impressed that at least a Mayoral candidate was not just thinking at the ward level for a transit proposal, but felt the plan was rather threadbare — a single line to solve almost all of Toronto’s problems.

Wearing two hats that day – as both reporter and activist – I was scrummed by the media for comments, and the Tory campaign chose to lift one phrase out of context as an “endorsement” for SmartTrack that remains online.

Steve Munro, Toronto Transit Blogger, said, “This is very much a refocusing of what transit in Toronto should be.”

What I was talking about was the need to look at the region and at trips to points other than the corner of Bay & Front and times other than the traditional commuter peaks. As to the specifics of SmartTrack, I was rather less complimentary.

In brief, SmartTrack would see electric multiple unit (EMU) trains operating primarily on GO Transit corridors between Unionville on the Stouffville line and Mount Dennis on the Weston corridor (the Kitchener-Waterloo line). At Eglinton and Weston, the line would veer west along the former Richview Expressway lands to the Airport Corporate Centre, but not to the airport itself.

The route would charge regular TTC fares with free transfers to the existing system, and with frequent all-day service at peak levels of every 15 minutes. Over its 53km it would have 22 stations, and might, according to the campaign, carry over 200,000 passengers per day.

Continue reading

Metrolinx Board Meeting June 26, 2014 (Corrected)

Correction July 1, 2014: In the original version of this article, I attributed a comment to Metrolinx Chair Rob Prichard regarding the sharing of information between bidders on rapid transit projects, and expresssed my surprise that this did not match the process I was familiar with from my own public sector experience. In fact, the remark was with regard to sharing information about questions to Metrolinx from candidates in the municipal election.

The procurement process does include sharing of information via addenda to Requests for Information issued to all bidders as mentioned in the Rapid Transit Quarterly Report. I regret this error and frankly cannot understand how I scrambled two very different topics together.

However, the process for dealing with candidate questions at Metrolinx is completely different from that followed by the City of Toronto. Where Metrolinx preserves confidentiality about questions a campaign might ask, the City posts responses to any query online so that no candidate has the advantage of professional advice not available to others. The basic premise is that the staff works for Council, not for an individual member or candidate.

As a public agency, Metrolinx should be providing information to everyone. The discussion (which starts at about 21:10 of the meeting video) emphasizes that Metrolinx has no part in the election, and yet the confidentiality of information exchanges could offer an advantage to a campaign that is unknown to other candidates.

Original Article  from June 29, 2014:

The Metrolinx Board met on Thursday, June 26 in a quite celebratory air. With the provincial election out of the way and the return of a pro-transit Liberal majority to Queen’s Park, Metrolinx sees a rosy future for transit expansion. They wasted no time telling anyone who would listen about the great work now at hand.

Among the items of interest were reports on:

Another burning question about the recently announced funding is just how much money is on the table, especially how much is new money as opposed to funds earmarked for specific projects like RER or previously announced/expected for projects in the “Next Wave” of Metrolinx undertakings. It didn’t take the assembled media long to notice that the GO RER scheme would gobble up much of the $15b earmarked for transit in the GTHA. I will return to this in a separate article.

Continue reading

TTC Board Meeting June 24, 2014

The TTC Board met a light agenda and little inclination to debate. As events at City Hall wind down toward the October election, there are no major decisions, and Commissioners in the Karen Stintz camp have succeeded in blocking any significant policy discussions until 2015. This leaves the Commission and Council going into the election and next year’s budget process without background information that could be useful in quick implementation of a policy shift in the post-Ford era at City Hall.

If it is any consolation, Stintz currently is polling at 3%, below the “don’t know” category.

Items of interest on the agenda include:

Details on the debate and actions taken, if any, follow the break.
Continue reading

John Lorinc and the Sad Story of Scarborough Transit

For those who may not follow their site, Spacing Toronto has an excellent series by John Lorinc about the machinations at City Hall and Queen’s Park behind the many changes in transit plans for Scarborough.

Reading through this, and in particular the double-dealing at Queen’s Park, not to mention self-serving moves by some city councillors, it is impossible to have any faith in plans or grand statements about the future of our transit system. Even worse, any thought of transparency is a fiction, and transit planning is a secret, political exercise utterly devoid of credibility.

This is not news to those of us who watch the process close up, but seeing the gory details on Scarborough brings a stench of opportunistic grandstanding to every other transit scheme on the table. Does anyone actually care about transit riders, or are we just buying votes with billion dollar promises?

Neptis Reviews Metrolinx: A Critique (I)

In December 2013, the Neptis Foundation published a review of the Metrolinx Big Move plan authored by Michael Schabas. This review received prominent attention in the Toronto Star and is regularly cited in their coverage of transportation issues. Some elements also appear in recent comments by Transportation Minister Glen Murray, and it is reasonable to assume that his view of Metrolinx priorities has been influenced by the Neptis paper.

Since its publication, I have resisted writing a detailed critique in part because of the sheer size of the document and my disappointment with many claims made in it, and a hope that it would quietly fade from view. Recent Ministerial musings suggest that this will not happen.

The stated goals of the report arose from four basic questions posed shortly after The Big Move was released in 2008:

  • What evidence suggests that the projects in the Big Move will double the number of transit riders and significantly reduce congestion in the region, as promised by Metrolinx?
  • Does each project offer good value for money?
  • Do all the projects add up to a substantial regional transit network or is the Big Move just an amalgam of projects put forward by diverse sponsors?
  • How do the projects in the Big Move relate to the Growth Plan for the Greater Golden Horseshoe, its land use equivalent? [Page 2]

The report itself addresses a somewhat different set of questions and notably omits the land use component.

  • Will the Big Move projects achieve the Metrolinx objective of doubling transit ridership?
  • Are these projects consistent with Metrolinx’s own “guiding principles”?
  • Are they well-designed, consistent with international best practice, and integrated with other transport infrastructure?
  • Will they support a shift of inter-regional travel onto transit?
  • Are there alternative, more effective schemes that should be considered?
  • What changes would help Metrolinx produce better results? [Page 14]

Schabas’ work is frustrating because on some points he is cogent, right on the mark.

Metrolinx has bumbled through its existence protected from significant criticism, swaddled in a cocoon of “good news” and the presumed excellence of its work. To be fair, the agency operates in a political environment where independent thought, especially in public, is rare, and years of planning can be overturned by governmental whim and the need to win votes.

That said, Metrolinx is a frustrating, secretive organization conducting much of its business in private, and tightly scripting public events. Schabas rightly exposes inconsistencies in Metrolinx work, although his own analysis and alternatives are, in places, flawed and blinkered.

Continue reading

Neptis Reviews Metrolinx: A Critique (III)

This article is the third section of my critique of the December 2013 review of the Metrolinx Big Move Plan written by Michael Schabas for the Neptis Foundation. It should be read in conjunction with Part I and Part II.

Continue reading

Scarborough 2006 Travel Patterns (Update 2)

Updated 2 April 13, 2014 at 2:50pm:  Eric Miller, the author of the illustrations originally used for this article, has objected to their being taken out of context and has asked that they be removed.

Meanwhile, the information is available in a paper by Dr. Miller of February 24, 2012 which is available on the City of Toronto’s website.  This is cited in a City Planning presentation at the Sheppard Transit Corridor Expert Panel on March 2, 2012.

I am hoping to obtain new information about Scarborough travel patterns from a regular reader.  When this is available, I will update the article. Continue reading

John Tory’s Mythical Subway

I think people forget, for example, that we have to rebuild the LRT in 25 or 30 years, just like we have to with the Scarborough RT. With a subway we won’t have to do that. The Yonge Street subway just celebrated its 60th anniversary and it’s still in good shape.

[John Tory in an interview for Metro News, April 7, 2014, courtesy of Matt Elliott]

The false comparison of long-lasting subway with a comparatively short-lived LRT is the sort of comment I expect to hear from (former TTC Chair and Mayoral candidate) Karen Stintz, or from the subway-loving Brothers Ford.  The number “100” is often bandied about as the longevity of a subway investment by analogy to the much older networks found in cities like New York, London and Paris.

I have written before about this and won’t belabour the details here, but now that a major candidate for the office of Mayor has taken up the line, it’s worth revisiting the topic.

Continue reading