GO Kitchener-Waterloo & Guelph

Mark Dowling passed along a link to the presentation materials from the recent GO Transit EA meeting in Kitchener.

You can follow the story of GO service from a Kitchener-Waterloo perspective on the GOKW Blog.

One of the fascinating points about the proposal for this corridor is that it recognizes that this line has bidirectional demand, as well as local demand that isn’t going to downtown Toronto.  This has always been the case, although VIA has done the worst to discourage people from using their service.

Intriguingly the track plans in the display materials show a substantial increase in VIA service in the future.  Those of us who travel to Stratford will relish better service, but the real bread-and-butter on this line is the traffic to and from universities.  It’s always been a natural corridor for better service, and maybe, finally, we may actually see it.

Also worth noting is the idea of eventually moving Kitchener Station so that the line will make a good connection with the planned KW LRT line.

Ontario Parks

This morning, Premier McGuinty announced that, with the generous assistance of our friends in Ottawa, we are about to see a boom in transit spending.  On parking lots.

About $175-million will go to expanded parking at 12 GO Transit sites, half of which will receive parking structures.  This marks a reversal from the “we won’t build structures because they’re too expensive” policy of many years.  Moreover, it does nothing to address capacity on trains nor on the local transit systems that many GO riders use to reach those trains.

Metrolinx may be working on a regional plan, but this announcement sounds like an echo of the days when commuting meant driving to a parking lot.  Yes, we can build it quickly, but is this what we should be doing with transit infrastructure dollars.

Lurking down at the end of the announcement, almost as an afterthought, is $75.5-million for the Hamilton Junction grade separation.

It appears that the cost of these projects will be shared 50/50 by both governments.

Transit City Status Update

This month’s TTC agenda includes a long update on the status of the Transit City plans.  I will not attempt to précis this report, but will touch on points of particular interest.

Funding is in place to allow continued work on Environmental Assessments [sic] and other engineering work, but the real challenge comes later this year when construction is slated to begin on Sheppard.  The fog may clear a bit once the provincial budget is announced and we know just how much money will flow to Metrolinx and to transit in general.

A related problem, of course, is the question of new LRVs for the existing and future streetcar/LRT networks.  By the time the budget is out, the TTC should know what the bids for new cars look like, and Queen’s Park will have to decide whether they are serious about paying for them. Continue reading →

Yonge Subway Tunnel Repairs Phase 2 Begins (Updated)

Effective Sunday, February 15, repairs on the subway tunnel liners between Eglinton and Finch will shift further south and the late-night turnback operation will move from Lawrence to Eglinton.

The 97 Yonge route will operate from Eglinton to Finch station stopping in Lawrence, York Mills and Sheppard stations enroute to make connections with east-west routes.  The late night extension of routes south to Lawrence Station will end, as will the 97F service via Yonge Boulevard.

Bus service will run every 3 minutes Monday to Friday, and every 4’30” on Sundays.  As in Phase 1 of this project, subway service will run through to Finch on Saturdays.

Updated:  An early plan to use the “special events” bay (the old surface terminal at the Duplex Avenue end of the station) has been changed.  Shuttle buses will use the regular terminal.

GO Georgetown South Open House Reviewed

Robert Wightman reports:

I was at the GO South Georgetown open house in Mt Dennis (Eglinton and Weston Rd.) today.  Some interesting things that I learned are:

  1. There will be a seven or eight track corridor from the TTR yards up the Weston Sub to the North Toronto sub where two tracks will head west on the Galt Sub. GO owns the Galt Sub south of the Diamond at the North Toronto Sub. If there are eight tracks one will probably disappear at Lansdowne where the Newmarket sub branches off.
  2. Bloor station will be two island platforms serving four tracks. It will be possible to have the Milton trains stop here. There would be four ARL (Air Rail Link formerly known as Blue 22) trains, four Mt. Pleasant locals, one or two Kitchener express trains, plus one or two Milton trains each way each hour in base service. God knows what it would be like in rush hour. There would be a direct connection to Dundas West Station, finally.
  3. There will be a four track depressed line in a 650 m long tunnel through Weston north of Lawrence. The station for Weston would be moved south to a level area so that the north end of the station, four tracks, would be just north of the bridge at Lawrence with most of the station to the south. There would be two CP tracks and one or two CN tracks go through at grade as they do not want to run them down and up the grade. Clearance would be 22 feet, 6.8 m in the tunnel, enough for electrification at 25 KV AC.
  4. Future stations are planned for Eglinton, to connect with the LRT to form a major transit hub and one at Woodbine. These would not happen until the line is electrified. The electrification would probably be at 25 KV AC but this has not been finalized though everything is being built with adequate clearances. Apparently when the Deux Montagnes line in Montreal was re-equipped it was converted to 25 KV AC according to the consulting engineer I talked to.
  5. The ARL line will be run with two car trains of self propelled Budd RDC’s on a 15 minute headway. There would be four trains providing the service with a two car hot spare train. (It would be plugged in with warm engine oil and be either heated or cooled to the proper temperature to be quick a change off.) There would also be one spare car for running maintenance. I do not think that this is an adequate spare ratio but we shall see.
  6. SNC Lavalin wants high platforms to provide easier loading and unloading but the GO guy and the consulting engineer doubt that this will happen as it make for under utilized station platforms at Union Station and will require gauntlet tracks at the line stations to allow freight and express trains to pass the high platforms. The artist’s rendering shows low level bi folding doors at each end, sort of like skinny doors on the single level GO trains.
  7. The line from the GO line to the airport is extremely interesting. The consulting engineer said that it was “straight from Canada’s Wonderland.” It consists of a light and airy, perhaps even flimsy, elevated single track line down the middle of the Goreway to get to the Airport and then grades up to 5% to get through the airport to a two track 80 m long island platform. This will allow for expansion to three car trains. He also said he saw a drawing of a two car train with a high platform sliding double door in the middle of the car. This would allow for faster loading and unloading.
  8. Every level crossing from Strachan Avenue to the airport will be closed or grade separated for passenger trains. It will be interesting to see what happens to the two remaining level crossings in Brampton but this study did not go that far. They figure that there will be 240 + trains a day through Weston with the freights still making level crossings at two streets.
  9. There was no one there who knew much about the rush hour only service to Bolton. One map had a line labelled enhanced GO service to Orangeville and one person thought that they were going to run GO trains through the Forks of The Credit but I think that it means better bus service to meet the more frequent GO trains.

I will try to get out to the meeting in Kitchener tomorrow night for the extended GO service but as I have to be at the airport for 6:00 a.m. Friday I may not make it. Apparently the storage area at Baden is the third choice. There is not room at the Kitchener station to store trains and they do not want to do a reversing move on the mainline so the yard must be to the west. The storage areas at Milton and Richmond Hill are accessed by yard trackage and are considered a reversing move so they do not have to change ends and perform a brake test. 

Scarborough RT/LRT Benefits Case Analysis (Updated)

Updated February 3:  In a previous version of this post, I was using 4-car trains for the Base Case and therefore claimed that the fleet was undersized.  This has been corrected.

On January 16, the Metrolinx Board approved release of the Benefits Case Analysis (BCA) for the replacement and extension of the Scarborough RT.  This document is now available online.

The original TTC proposal, was simply to replace the current technology with Mark II RT cars on the existing alignment. This is now referred to as the “Base Case”.  Four alternatives, all considered superior to the base case, were evaluated in the BCA.

  • 1: Extend the RT 5.4 km to Malvern Town Centre using the current technology.
  • 2: Extend the RT to Markham & Sheppard where it would connect with the Sheppard East LRT including an LRT branch north to Malvern.
  • 3: Replace the RT over its entire length with LRT and extend to Malvern on approximately the same alignment as the first RT option, completely in an exclusive right-of-way.
  • 4: Replace the RT with LRT and extend to Malvern with a partially exclusive right-of-way east of McCowan.

Major Flaws in the BCA

To save readers from combing through the rest of the text, here are major points where the analysis does not hold up.

  • The peak demand for which the line is designed, 10K/hour, is substantially above the modelled peak demand of 6.4K/hour in The Big Move.  The Metrolinx regional plan includes frequent commuter rail services through the extended RT’s catchment area, and this likely attracts some riders away from the RT.  Designing for higher capacity than required inflates fleet, carhouse and operating costs.  It may also affect train lengths and the cost of retrofitting existing stations.
  • LRT options presume the construction of a dedicated carhouse for the Scarborough line even though, by the time an LRT would operate, the Sheppard line’s new carhouse would be operating and could act as the base for Scarborough trains.  This inflates the capital cost of LRT options.
  • The alleged cost-benefit ratios are highly sensitive to the presumed value of travellers’ time.  This value is orders of magnitude greater than the value of environmental effects (reduced car use) and dominates the calculations.  The model overall favours proposals that serve long trips at comparatively high speeds (e.g. with widely spaced stations) that may not be conducive to the type of neighbourhood preferred in the Official Plan.
  • The values assigned to savings from reduced automobile use are based on a much higher factor than in the VIVA Benefits Case report, 95 vs 23 cents per km (2031).  The effect is to grossly overstate the savings from reduced auto usage for all options.
  • Economic benefits include the money spent on labour during construction.  This value for all options is a disconcertingly low percentage of the total project cost (well under 20%).  This shows that a substantial portion of any scheme is consumed by planning and design, materials, vehicles and system component costs.  Moreover, the idea that spending more on one project is “good” because it generates more work is valid only if one ignores other projects that could be built with the same money and labour.  This will be an important factor when projects are weighed against each other.
  • Estimates for the length of time the RT would be closed for upgrade or restructuring are “at least 8 months” for RT and “up to 36 months” for LRT.  These figures need to be reviewed in detail to determine where the differences lie.  The numbers are taken from the original TTC study (which did not include the qualifiers) when the physical changes needed to handle Mark II RT cars were considered to be trivial.  This may no longer be true.
  • Overall the analysis looks at the RT in isolation from the surrounding network and ignores alternative ways that the demand might be served on the network, not just on the RT corridor.  Although the report shows LRT as the less expensive option, the difference versus RT options may actually be understated.

Continue reading →

Three Years / A Grand Design Revisited

Today, January 31, 2009, is the third anniversary of this site.  I started out posting a collection of Toronto Film Festival reviews just to get things rolling, but the primary focus here has always been transit.

For a moment, I will indulge my ego and say that the amount of exposure, the references, the cross-links to this site are gratifying.  However, you, the readers, contribute a lot with your comments, even those I don’t agree with, because there is a real sense of people caring about how the transportation system in Toronto and surrounding areas should grow and improve.

Indeed, having this ongoing conversation hones my own thoughts on many issues.  Would that some politicians and professional transit folk had to undergo the rigour of hourly challenges to their policies and assumptions.  Some days here it’s like a non-stop Question Period.

My thanks to all who have contributed and to those who merely drop by to see what’s new.

At the three-year mark, it’s worth looking back at one major post that declared my position on regional transit planning.  A Grand Design, published in March 2006, was an attempt to “draw a map” even though I hate doing that sort of thing.  The debate can quickly descend into miniscule details of how each line would be built rather than a discussion about the overall philosophy.  Some of you will remember excruciatingly long threads where writers battled over the exact alignment, construction techniques and service plans for routes that wouldn’t open for two decades.  If I had allowed people to upload images, I am sure we would have debates about the colour of tiles in Barrie subway station.

With the recent publication of Metrolinx’ A Big Move in December 2008, GO Transit’s GO2020 and the TTC’s Transit City plan, I decided to look back at A Grand Design to see how it fared.  Before I do, let’s remember the context of January 2006.

  • The TTC was still digging out of the Harris legacy, and broad support for transit from Queen’s Park was in the future.
  • The GTTA Act (Metrolinx’ enabling legislation) was introduced in the Ontario House in April 2006 and received Royal Assent in June.  (Some sections relating to the takeover of GO Transit and other transit operations in the GTAH have not yet been proclaimed.)
  • Transit City was unveiled in March 2007.
  • MoveOntario 2020 was unveiled in June 2007.
  • Metrolinx began serious work on a regional plan in fall 2007 culminating in publication of A Big Move in December 2008.

Also, before appearing to claim all of A Grand Design for myself, I must repeat the acknowledgement from page 1 of the document.

I must acknowledge the many people — professional planners, engineers, transit management and staff, urban thinkers, writers, politicians, transit fans, fellow advocates, friends and even a few political enemies — for the long education they gave me in how cities work and what transit can do.

My own contribution was to show what a consolidated plan might look like, and particularly what one that didn’t assume all the prejudices, political and technical, of how things were done for past decades. Continue reading →

Council Calls for Relief Line Study

Wednesday saw a long debate at Toronto Council on the Yonge Subway Richmond Hill extension.  As I write this (January 29, just after midnight), I do not have all of the details of Council’s final decision.

However, this much I know:

  • Council has requested a study of the Downtown Relief Line.
  • Some Councillors used the debate as a springboard for attacks on the TTC’s project management costs and proposals for private sector participation.
  • Council agreed that Transit City is the top priority for transit spending.

I find myself in the unusual position of being part of a wave of advocacy for the DRL, a line that will almost certainly be a conventional subway.  If this seems odd, my reasoning is that we must look at how the network operates as a whole.  The core of the network needs more capacity, and jamming more people into the existing Yonge line (getting more out of existing infrastructure as the TTC so delicately puts it) is irresponsible and possibly reckless.

If the studies that really need to be done emerge, we will look at both TTC and Metrolinx plans, and question what will work best for the core area, the outer 416 and the 905.  Both agencies have much to answer for in their shortsighted, misleading planning and their inadequate evaluation of alternatives to network structure and staging.

As details emerge, I will add to the information here.

Metrolinx Announces Weston Corridor Airport/GO Study (Updated)

Metrolinx has launched a study of substantially increased rail capacity in the Weston Malton corridor to serve the growing demand on several lines in the northwest as well as a Union-Airport shuttle service.

Affected and proposed GO services include:

  • Brampton (frequent, express all day service)
  • Georgetown (all day service)
  • Guelph (peak service)
  • Bradford (all day service)
  • Bolton (peak service) 

For further information please refer to the Metrolinx project homepage.  There will be six public meetings between February 3 and 12 in various communities.

Worth noting is the timetable which includes several months of consultation, then the formal assessment of the proposal and public comment.

Updated January 24:

Mike Sullivan from the Weston Community Coalition has provided the following information about proposal.

  • From a meeting with Metrolinx Chair Rob MacIsaac, Mike has learned that three tracks are to be added between West Toronto Junction and the Airport, four tracks from the Junction to Union.
  • The tracks on the CN only (not the CP) will be in a trench through Weston, and this will be covered (ventillation will obviously be an issue with diesel trains) from just northwest of Church to just southeast of King.
  • The John Street crossing just north of Weston Station will be closed and replaced with a pedestrian bridge.
  • Air-Rail Link trains will stop at Weston Station.
  • The crossings at Strachan Avenue (west of Bathurst) and Dennison Avenue (about .5 km south of Lawrence) will be grade separated.
  • Operations will be diesel both on GO and the Air-Rail Link.  Electrification might happen in the 15-25 year timeframe.  [By that time, the refurbished Budd cars providing the airport link will be at least 70 years old if they are still in use.]
  • Some land expropriation is likely both for the grade separation at Dennison and at the north end of Weston.
  • Service to Brampton will be every 15 minutes all day long in addition to the airport service and other trains in the corridor.

Metrolinx Fare & Service Integration (Update 3)

Thanks to an oversight on the security on the Metrolinx website, it was possible to view a report that was pulled from the agenda for this Friday’s meeting.  (Thanks to one of my regular correspondents for spotting this.)

The report talks about integration of services between the TTC and other systems as well as a Metrolinx-GTAH pass.  Because the report has been withdrawn it cannot be considered to be an authoritative Metrolinx statement, but it’s indicative of Metrolinx’ ham-fisted attitude to local systems including the TTC.

Updated:  Comments on the report added.

Update 2:  Tess Kalinowski writes about this issue in The Star.

Update 3:  For the convenience of readers, the report which was pulled from the Metrolinx site is now available here.

John Barber’s scathing commentary on this report is online at the Globe and Mail.

This report proposes that Metrolinx embark on a takeover of fare integration and service co-ordination for cross-boundary operations.  To that end, Queen’s Park would be asked to implement the necessary legislation to remove jurisdictional obstacles and to proclaim the section of the GTTA act empowering Metrolinx to implement a Farecard Division.  The target for full GTAH-wide fare integration would be 2012.

Notable in many discussions of fare and service integration is the absence of GO Transit, even though the GTTA Act includes GO as part of a future integrated system.  Nobody wants to mess with GO’s revenue stream, or to contribute “local” demand to what is seen as a regional service.  Strangely, the same approach is not taken with respect to the TTC (see the Richmond Hill subway debate).

The report notes that between 1996 and 2006, transit trips to downtown Toronto from the 905 have increased while auto trips decreased.  I venture that the vast majority of this effect is thanks to GO rail services, not to cross-boundary bus routes. Continue reading →