TTC CEO’s Report: August 2019

Although the TTC Board takes a long siesta through the summer, the CEO produces a monthly report even in months when the Board does not meet. The August 2019 edition was recently posted on the TTC’s site.

This report continues a format established some time ago by CEO Rick Leary in which the focus is on measures of system performance. There is no financial information here, and only summary ridership numbers with no sense of the associated revenue. All of the financial reporting was hived off of the CEO’s report into a quarterly CFO’s report, but we have not seen one of those since April 2019, and that covered the year ending December 2018. One might have expected an update at the July Board meeting, but the abrupt and unexpected departure of CFO Dan Wright in early June appears to have iced the short-lived report.

I spoke with Wright at the Audit & Risk Management Committee meeting the day before he left the TTC, and he gave no indication of his impending departure. We spoke about the problems of counting “rides” in an environment where there is only a tenuous link between fare payment and the actual number of trips (or trip segments) taken.

The TTC has been wrestling with the possibility that ridership has been over-reported for some time, and the situation is further complicated by Metropasses, the move to Presto and the two-hour fare. Just what is a “ride” for statistical purposes? I had planned to follow this up with Wright for an article here, but alas he vanished like so many other senior TTC staff in the past year. The problem is summarized in the CEO’s Report:

Higher PRESTO adoption appears to have affected measured ridership in two ways. First, we now have more precise ridership data compared to counting tokens and weighing paper tickets. Second, more than 25% of our former monthly pass customers have converted to PRESTO pay-as-you-go e-purse each month in 2019, likely to take advantage of the two hour transfer and for some, the TTC/GO discounted co-fare. This would affect measured ridership to the extent that these customers may ride less often than the monthly average of 71 rides per adult monthly pass. [p 25]

Josie La Vita, the Executive Director of Financial Planning for the City of Toronto, replaced Wright on an acting basis pending recruitment of a new CFO, a process expected to take 12-24 months.

The CEO no longer reports financial data on operations or capital projects, and the absence of a CFO’s report leaves a major gap in information available to the TTC Board and Council on the system’s actual performance.

Moreover, riding counts (i.e. vehicle occupancy) are only rarely reported at a route level, and a “crowding report” has not recently seen the light of day. When crowding data are released, they are averaged and this gives no indication of the effects of bunching and gapping on individual vehicle loads. Performance metrics that do appear in the CEO’s Report do not fully describe the service quality actually experienced by riders particularly on surface routes.

Ridership for 2019 to the end of June is reported as 267.8 million as against a target of 271.9m and a 2018 figure of 270.3m (down 1.5% and 0.9% respectively). For the month of June itself, ridership is on target. As the chart below shows, the shortfall in 2019 came primarily in the winter months which were unusually cold. June’s ridership was boosted by the Toronto Raptors Championship Parade without which the number would have been down 0.6% compared to 2018.

Weekend ridership is down, and this is thought to be due to various factors including the number of subway shutdowns. These are not going to end any time soon with the ongoing signalling projects and other infrastructure upgrades, and at some point the TTC cannot treat their effects as unexpected. A follow-on problem for the TTC is the perception by riders that “the subway is always closed” and this can affect ridership as much as the actual shutdowns.

Presto fare card usage continues to increase and by June 2019 the adoption rate reached about 80%. Presto ridership for the first half of 2019 was 214.2 million out of the total reported ridership of 267.8m.

Vehicle Reliability

The fleet benefits from improved preventative maintenance and from the retirement of older vehicles. Before the onset of hot weather, there was a concerted effort to get air conditioning systems in good order, and AC failures were rare even with the particularly hot weather in 2019. (Personally, I never encountered a “hot car” on the subway, a first for several years running.)

On the streetcar fleet, the decline in the proportion of service provided by the nearly 40-year old CLRVs and the disappearance of their ALRV cousins (of which a few are still officially active but never seen in revenue service) contributes to a reduction of in service failures. The Flexity fleet has its ups and downs for reliability, but even running below its target, these cars are much more reliable than those they replace.

On the bus fleet, the retirement of old buses and the recent purchases of hundreds of new vehicles has substantially lowered the average age of a bus and increased the proportion of buses that are “spare” relative to service needs. The fleet is over 2,000 vehicles, but the peak requirement in June was 1,641 including buses used on streetcar lines. This generous spare ratio has benefits in service reliability but also a cost in both capital and in garaging.

Continue reading

TIFF 2019 To Demolish Downtown Transit Service, Again

Updated Aug. 22, 2019 at 8:05 pm: The TTC has advised that temporary stops for the diversions are still to be finalized. Also, there will be Paid Duty Officers to manage traffic at Spadina, York and Church Streets. Thanks to Stuart Green for the update.

The City of Toronto and TTC have announced various road closures and service diversions associated with the 2019 edition of the Toronto International Film Festival (TIFF).

As in past years, King Street will be completely closed to traffic including transit operations from University Avenue to Spadina Avenue. This will begin at 5 am on Thursday, September 5 and continue through to 5 am on Monday, September 9.

Additional ad hoc diversions might occur on both Monday and Tuesday, September 9-10, for “red carpet events” from 3:30 pm onward.

Service arrangements this year are somewhat different from 2018 because there is now the split 504A/504B King service and the soon-to-be-restored 508 Lake Shore.

The primary diversion for almost all services will be:

  • From King to Queen on Spadina, both ways
  • From King to Queen on York, northbound/westbound
  • From Queen to King on Church, southbound/eastbound

Riders wishing to transfer from the subway to an eastbound King car to Broadview Station or to the Distillery should do so at Queen, not at King, or they will have to walk from Yonge to Church from King Station. There will be no eastbound King cars at Osgoode Station. It is not yet confirmed whether the TTC will establish a stop at Queen and York for a walking transfer.

Riders wishing to transfer from the subway to a westbound King car must do so at King or Osgoode Stations. There will be no streetcar service at St. Andrew Station, although there will be plenty of King cars nearby at York Street. Whether a temporary stop will be created at King and York is still to be confirmed.

This service design will see ALL of the King Street services, both ways, operating northbound on York Street giving an extremely frequent service, not to mention the potential for a total bottleneck making the turns east and west at Queen Street.

504A Dundas West to Distillery Service

This service will be broken into two segments:

  • From the west, 504A cars to/from Dundas West will operate downtown via Spadina and Queen east to Church, then loop via Church, King and York.
  • From the east, 504A cars to/from the Distillery will loop downtown via King, York, Queen and Church.

504B Broadview Station Service

The Broadview Station service will use the same loop downtown as the 504A Distillery cars:

  • Westbound on King to York, then north to Queen, east to Church and south to King.

There will be no replacement bus service parallel to King as has been attempted in some past years. Anyone destined for the area between University and Spadina on King will have to walk in from the bounds of the closed area or south from Queen Street. This is of particular concern for anyone going to screenings at TIFF Bell Lightbox which will have no transit service during the diversions.

508 Lake Shore Service

The new 508 Lake Shore trippers will loop downtown via:

  • Eastbound via Spadina, Queen and Church
  • Returning westbound via Richmond and Victoria to Queen, then west to Spadina

304 Night Service

The 304 night cars will divert via Spadina, Queen, Church/York both ways.

A shuttle night bus will operate between Wolseley Loop and Parliament/King bypassing the TIFF district via Adelaide and Richmond Streets.

503 Kingston Road Bus

Not mentioned in the TTC’s announcement is the 503 bus service which consolidates the 502/503 Kingston Road services in September. These buses are supposed to loop via York, Richmond, and University to King including a layover point on York north of King. That area will be thick with streetcar service. It is ironic that the only service that will stop eastbound at St. Andrew Station will be the 503 bus on what is sure to be a “now and then” schedule.

I am a TIFF supporter as a member and donor, and have attended the festival for over three decades. That said, I am disgusted by the gorilla-like behaviour of TIFF in elbowing aside vital transit services on weekdays in Toronto.

These diversions produce severe effects on service not just downtown, but on parts of the King and Queen routes far from the TIFF district. Riders across the city suffer so that TIFF can have its street fair.

Every year we hear that “next year will be different”, but nothing happens.

From the TTC’s diversion announcement:

We encourage you to plan your trip in advance. We thank you for your patience during this important event benefitting Toronto’s economy and international reputation as a world-class city.

A “world class city” would figure out how to integrate its transit service into a major cultural festival.

Metrolinx Shifts Responsibility for Improvements to Future 3P

In the comment thread on the article about GO Transit Service Changes, two readers asked about the status of expansion projects that were supposed to be “in the works” – the addition of track capacity from Don to Scarborough Junction and from Guildwood to Pickering, as well as a contract for signalling upgrades.

I wrote to Metrolinx for comment on these issues, and have received a reply from Matt Llewellyn in Media Relations.

1. Someone left a comment on my blog today claiming that the projects to add a fourth track from Don to Scarborough, and a third track from Guildwood to Pickering, have been cancelled. Is this true, and if so, why?

Through our new rigorous analysis of potential investments we are prioritizing the infrastructure needed right now, giving communities the transit system they need and deserve, while making taxpayer dollars go further.

As part of that process, it was determined it is possible to reduce the entire three-mile three track section while still achieving the current service levels needed between Rouge Hill GO Station and Durham Junction. We’re able to delay these major improvements now thanks to a stronger working relationship we’ve developed with our Railway partners. By finding smarter and better ways to work together, we’re significantly accelerating service improvements to these areas.

Any future infrastructure needed in this area will be determined through the OnCorridor Program that is currently in procurement.

We will continue to work closely with the impacted stakeholders and community as we work towards upgrading transit and adding essential regional transportation capacity to our network.

On a related note, has the scheme to build the “Ontario Line” above grade, possibly in the rail corridor from Gerrard west to Parliament, had any effect on the four-track plans for that section of the corridor?

Metrolinx Initial Business Case indicates the Ontario Line will have a portal east of Cherry Street, crossing over the Don River and continuing along the GO Rail corridor, along a widened embankment or elevated structure.

We are currently reviewing the work that is needed to advance the infrastructure necessary to provide more GO service on this stretch of the corridor, alongside the infrastructure needs for the Ontario Line.

What is the status of a project to re-signal GO corridors to allow more frequent headways and better safety control? There was a consulting contract let to Parsons in late 2017 but is the project actually progressing?

Parsons is supporting Metrolinx as a technical advisor for the Signal and Train Control program under Go Expansion.

The signaling and train control program, which will allow for more trains at a lower headway and improved safety, is progressing under Go Expansion.

The Go Expansion program is currently in the procurement phase.

Through the GO Expansion program, we will be leveraging the worldwide expertise of the private sector to drive contractor accountability for delivering on the required service outcomes.

From these answers it is clear that Metrolinx has decided to shift responsibility for any infrastructure upgrades to whichever consortium wins the GO Expansion program bid and takes over responsibility for this work. This could bring a level of expertise to GO not seen before (if the comment above is to be believed), but this could also add yet another layer of opacity and frustration to any meaningful public participation in a review of what might or might not be built.

GO Transit Service Changes Effective September 3, 2019

After the flurry of activity about rumoured widespread cuts to GO Transit’s bus service, the changes announced for September 3 are all “good news”. Whether there is “another shoe to drop” later in the fall remains to be seen. So far, these are not the moves of an agency about to make widespread route cuts.

Bus Routes

Seasonal bus service will end on 12 Niagara Falls. Effective Labour Day weekend, weekday express service will end, and weekend express service will be cut back to every two hours. The weekend express service will end at Thanksgiving.

School trips will be restored on the following routes:

  • 15 Brantford/Burlington
  • 25 Waterloo/Mississauga
  • 29 Guelph/Mississauga
  • 45-46-47-48 Highway 407 West
  • 51-52-54 Highway 407 East
  • 88 Peterborough/Oshawa
  • 93 UOIT/Scarborough

The 60 Canada’s Wonderland route will not return, and riders are encouraged to use TTC or GO services to reach York Region Transit Route 20.

In the announcement of restored and extended service on the Stouffville corridor, there is a note:

Evening bus service will continue to help you transition back to the train.

This implies that the bus service will disappear after the transition is complete, but there is no effective date for this.

Rail Corridors

On the rail network, there are many changes with new trips and hours of service on five corridors.

Lakeshore West

  • Service at West Harbour Station in Hamilton will be doubled to four trips each way from the current two.
    • In the morning peak, two trains that now originate at Aldershot will begin at West Harbour departing at 7:09 and 7:49 am. These are added to departures at 6:09 and 6:39 am.
    • In the afternoon peak, a new train will leave Union at 4:45 pm, run express to Clarkson and then local to West Harbour arriving at 5:57 pm.
    • The 6:30 pm train from Union which now ends at Aldershot will be extended to West Harbour arriving at 7:42 pm.
    • The other two PM peak trips to West Harbour leave Union at 4:00 and 5:15 pm.
  • Two Oakville trips will be extended to Aldershot leaving Union at 3:13 and 6:15 pm.
  • The 8:32 am eastbound train from Oakville will be extended from 10 to 12 cars to add capacity.

In what must be the most over-hyped part of the entire announcement, train service to Niagara Falls will run every day all year. However, weekday service remains one train each way, and otherwise travel between the Falls and Toronto will use buses for the portion of the trip beyond Burlington GO. The weekday trains serve West Harbour Station in Hamilton.

  • The morning commuter train leaves Niagara Falls GO (VIA) Station at 5:19 am arriving at Union at 7:50 am.
  • The afternoon train leaves Union at 5:15 pm arriving at Niagara Falls at 7:47 pm.

Weekend service that is now seasonal will become permanent. Note that these trains do not serve West Harbour, but run express between St. Catharines and Burlington.

  • Trains to Niagara Falls from Union depart at 9:00 am, 4:18 pm and 8:10 pm.
  • Trains to Union from Niagara Falls depart at 8:30 am, 11:30 am, 7:20 pm and 11:00 pm.

Lakeshore East

There are small changes to the Lakeshore East schedule:

  • New eastbound trips will leave Union at 2:58 and 3:28 pm running local to Oshawa arriving there at 3:56 and 4:26 pm.
  • A new westbound trip will leave Oshawa at 4:48 pm running local to Union arriving there at 5:50 pm.
  • The train which now leaves Oshawa westbound at 1:52 pm running express to Union will now depart at 1:53 and will stop at Whitby, Ajax and Pickering, then express to Union.

Kitchener

  • The train which formerly started eastbound from Mount Pleasant at 9:00 am will now originate in Kitchener at 7:57 am.
  • The 12:53 pm train westbound from Union will now run through to Kitchener arriving at 2:47 pm.
  • The train which formerly started eastbound from Mount Pleasant at 3:52 pm will now originate in Kitchener at 2:57 pm.
  • The 6:00 pm Kitchener train will now run express to Bramalea then local to Kitchener arriving there at 7:47 pm.
  • A new 5:45 pm train from Union will make all local stops to Bramalea.
  • From 6:53 pm hourly westbound trains run at least to Mount Pleasant with some continuing to Guelph or Kitchener.
    • The 6:53 train will run to Kitchener arriving at 8:47 pm.
    • A new train at 9:53 pm will run to Kitchener arriving at 11:47 pm.
    • A new train at 10:53 pm will run to Guelph arriving at 12:22 am.
  • A new train from Kitchener at 8:57 pm will arrive at Union at 10:51 pm.

Other schedule changes will reflect actual operating conditions and will adjust departure times earlier or later. Consult the schedule for details.

Finally, some train lengths will be adjusted to 6 cars:

  • The 9:48 am westbound train from Union
  • The 11:00 am eastbound train from Mount Pleasant
  • The 2:57 pm eastbound train from Kitchener

As a result of the new schedule, eastbound trains originating at Kitchener will run at:

  • 5:20 am, 5:45, 6:10, 6:50, 7:15, 7:57 (new), 2:57 pm (new), 8:57 (new)

Westbound trains running beyond Georgetown will leave Union bound for Kitchener (except as noted) at:

  • 12:53 pm (new), 3:35, 4:50, 5:27, 6:00, 6:53, 9:53 (new), 10:53 (Guelph, new)

Stouffville

On the current schedule, train service southbound to Union ends with the 3:31 pm trip from Mount Joy Station. The last northbound trip to Lincolnville leaves Union at 7:10 pm and the last Mount Joy trip leaves at 8:00 pm.

On the new schedule, southbound train service continues to end at 3:31 pm, but it resumes at 9:31 pm for three trips (hourly to 11:31 pm). The last northbound Lincolnville train remains at 7:10 pm, but train service to Mount Joy at 8:15 pm and hourly thereafter. The 11:15 pm train runs through to Lincolnville.

While this is some improvement, it is still a far cry from frequent, bi-directional all day rail service.

Two trains will be changed to six-car consists:

  • The 12:15 pm trip northbound from Union
  • The 1:31 pm trip southbound from Mount Joy

Barrie

The schedule for this corridor will not change, but some train lengths will be modified to better match demand.

  • The weekday 7:05 pm train from Union will be extended from six to ten cars.

The following trains will only be six cars long:

  • Weekdays:
    • 7:40, 8:40, 9:40 and 10:40 pm northbound from Union
    • 8:41, 9:41 and 10:41 pm southbound from Aurora
  • Weekends:
    • 11:40 am, 2:00 pm and 6:20 pm northbound from Union
    • 3:01 and 7:21 pm southbound from Aurora
    • 4:20 pm southbound from Allandale Waterfront

The full set of current and future schedules is available on the GO Transit website.

TTC Service Changes Effective Sunday, September 1, 2019

On September 1, TTC routes that had summer service cuts in May and June will revert to their regular service levels.

Several routes will have “reliability improvements”, a catch-all term for a variety of changes.

  • Most commonly, the buses assigned to a route are stretched further apart on wider headways with additional driving and/or recovery time in the hope that the service will stay more on time than it is now. Whether this actually happens is a matter of conjecture because the TTC does not regular report on route performance at a granular enough level to judge the effect of schedule changes.
  • In a few cases, running times are trimmed in recognition that the current schedules are excessive. This usually frees up buses that are either assigned to another branch of the same route, or which go into the pool for improvements on other routes.
  • In a few cases, there are adjustments between the local and express services on a route.

The TTC has not published crowding statistics since March 2019, although this was supposed to happen quarterly.

There will be major changes on the streetcar network, notably on 501 Queen and related routes, due to construction at Kingston Road and Queen, as well as the conversion of service west of Humber Loop to 100% low-floor cars. See my previous article for more information. The service plan for the restructured routes is included in the spreadsheet linked below.

Other changes of note:

  • Construction changes to 34 Eglinton East, 51 Leslie, 54 Lawrence East and 91 Woodbine related to the Crosstown project will end and these routes will resume their normal configuration.
  • Running times on 36 Finch West are extended to compensate for the effects of the Finch West LRT project.
  • Construction at Sheppard West Station will affect many routes there.
    • The 84/984 Sheppard services will not enter the station, but will serve on-street stops.
    • 101 Downsview Park, 106 Sentinel, 107 St. Regis, 108 Driftwood and the Wheel-Trans services will move to new bus bays as the work progresses.
    • A temporary loop will be provided in the passenger pick-up area for use by 104 Faywood, 105 Dufferin North, 117 Alness-Chesswood and YRT services.
  • With the return to fall service levels on Line 2 Bloor-Danforth, the second gap train recently introduced on that line will be removed.

Details of the service plans are in the spreadsheet here:

2019.09.01_Service_Changes

Various construction projects that have required buses to be added to several routes are scheduled to wind down in the coming months. Whether the buses released from construction service will actually shift to service improvements on the network as a whole remains to be seen. A basic budgetary problem for the TTC is that at least some of the extra construction service is paid for in capital project budgets, but this money is not available on an ongoing basis to run the same vehicles in day-to-day operations.