Updated May 30, 2014: The TTC has announced that streetcar service along Queen will resume its normal route at 7:00 pm on Saturday, May 31. The shuttle buses will continue to terminate at Church because Victoria Street will not reopen to traffic until June 7. At that point, the shuttles will be extended to Victoria to make a closer connection with the Yonge subway.
Updated May 29, 2014: This project is now substantially complete. All four quadrants’ special work plus connections to the existing track have been installed and set in concrete, and as of today, paving work and other cleanup activities were underway in the curb lanes.
Reconstruction of Queen & Victoria began on May 12, 2014 with excavation and removal of the old track. Following a typical pattern for intersections, the job reached the point where some of the new foundation slab was in place by May 16.
Track panels for the diamond and for the east quadrant are parked on Victoria at Richmond (the diamond) and on Queen east of Victoria.
This is a 3/4 grand union with a pair of curves in all but the northwest quadrant.
- Looking NE across Queen and Victoria
- Looking N on Victoria across Queen.
- Looking W on Queen across Victoria
- Queen/Victoria diamond
- Installing the diamond
- Looking W on Queen across Victoria
- Looking N on Victoria
- Looking E on Queen to Church
- Looking SW across Queen
- Looking E from Yonge
It looks like they’ve wrapped up work in the area. I had no idea installation took so much time for something that looks simple.
LikeLike