TTC 2013 Capital Budget Part III: Streetcar Fleet and Infrastructure (Updated)

The 2013-2022 Capital Budget includes plans for the conversion of streetcar services from the existing CLRV/ALRV fleets to the new low-floor light rail vehicles (LFLRVs), related projects to bring the infrastructure up to the required standard for the new fleet, and continuing system maintenance.

Updated Nov. 4, 2012 at 8:30 pm:

The headway shown for LFLRV operation on Queen was incorrectly calculated in the spreadsheet.  This has been fixed.

Continue reading