Updated May 19:
The question of turnback points and storage tracks on the Sheppard East LRT has come up in the comment thread on this post, and I have now received some details from the TTC.
There will be a crossover at “regular intervals” along the line for turnbacks. As for storage tracks, there are two potential locations that were shown in the preliminary designs at public meetings. Neither of these is confirmed yet, and their inclusion will be subject to detailed design and costing.
- Don Mills Station (third track)
- Malvern Garage (spur)
No three-track section on Sheppard itself is planned.
Details of the Don Mills Station configuration will be included in a report on the TTC agenda for May 28. Continue reading