If you were not able to get to the Public Information Centre meeting last week, the handout can be accessed on the Toronto Waterfront website (scroll down to the end of the list of reports).
This package does not include drawings of proposed treatments of the underpass at the railway viaduct. Although there have been some proposals, detailed design and evaluation is part of the study of the area south of the railway including the complex problems of connecting both parts of Cherry, Lake Shore and Queen’s Quay.