South Spadina Headways: What the Riders See

The matter of service on Spadina south of King has been before the TTC on two previous occasions, most recently in March 2011.

In brief, local riders and their Councillor, Adam Vaughan, complain that service is poor and riders are packed into streetcars.  TTC staff reply that the average load on a streetcar south of King is 29, and therefore additional service is not justified.  This matter was held down in March in order to get updated riding counts on the route.

The problem with the TTC’s analysis is that it looks at overall averages, not at the specifics of actual experience on the route.  Most importantly, if a service that is supposed to run every 7’30” is badly disrupted and unreliable, then wide headways will be common.  Because more riders accumulate waiting for long gaps than short ones, the “average” rider’s experience will be a long wait followed by an overcrowded car.  This situation exists on many TTC routes, but it is particularly troubling if that is the case on a short route with an entirely private right-of-way.

First, let’s have a look at how well behaved headways are in this area.  Before you even open the file, I will warn you that it’s a real mess.  The intention is to show the mess before attempting an analysis.

South of King Northbound Headways February 2010

Those of you familiar with my previous analyses of TTC’s vehicle monitoring data will recognize this chart as a scatter diagram of headways by time of day.  Each dot represents one car.  The vertical position on the chart is the headway as seen just south of King Street northbound, and the horizontal position is the time of day.

If the service were well-behaved, these points should be clustered on either side of the scheduled headway through the day.  However, the points appear as a cloud with little discernible concentration.  This means that the actual headways seen by customers are essentially random, and they are spread over a wide range.  Many cars run close together, and gaps over 10 minutes are common.

My next step was to break down this information based on the TTC’s standard that service ±3 minutes of schedule is considered to be “on time”.  Of course riders don’t care about the schedule, only the headway, and it is the headway that determines the wait time and average load on a car.  For the purpose of this analysis, I subdivided the information about each car into three categories:

  • Early (headway less than 4.5 minutes on a 7.5 minute schedule)
  • Late (headway greater than 10.5 minutes on a 7.5 minute schedule)
  • On time (headways between 4.5 and 10.5 minutes)

It’s worth noting that, assuming a uniform arrival rate for passengers, that a car carrying a 10.5 minute headway will have over twice the passengers than one carrying 4.5 minutes.

Headway Distribution ±3 minutes South Of King Northbound February 2010

There are four pages for this chart, one for each half-hour interval from 0700 to 0900.  The vertical bars represent each weekday, and the rightmost bar averages the values over the month.

The dark red portion of each bar shows how many cars were “on time”.  The cream and blue portions are the “early” and “late” cars respectively.

On a 7’30” headway, there should be 4 cars in each half hour, although minor variations may give us 3 or 5 where a car expected in one period actually arrived in an adjacent one.

Between 0700 and 0730, things are fairly well behaved, but the service becomes less reliable as the AM peak continues.  At least half of the service fails the TTC’s own “on time” test, even averaged over the entire month.  For some periods and days, most of the headways lie outside of the acceptable range.  This means that a large proportion of the riders on the south end of Spadina receive far worse service than is advertised, or even what is considered acceptable by the TTC’s own standards.

If we considered a tighter standard allowing only ±2 minutes, the situation is even worse.

Headway Distribution ±2 minutes South of King Northbound February 2010

When the TTC reports its riding counts, it does not include any information about the reliability of service.  Moreover, if short turn trips are mixed in, these may be counted and dilute the average even though they are not of use to all riders.

In the case of northbound service at King, this isn’t an issue.  However, short turns southbound do affect the quality of service on Queen’s Quay eastbound to Union Station, as well as westbound for riders wishing to travel northwest to locations on Spadina.  During the AM peak, almost all of the scheduled service reaches Union Station, albeit on an erratic headway.  However, starting about 9am, short turning at Queen’s Quay Loop becomes fairly common and disrupts service reliability on Queen’s Quay.

York Eastbound Headways February 2010

This chart contains five pages.  The first is the monthly headway scatter diagram similar to the one shown above for service northbound at King.  Once again we see a cloud of data points spread over a wide range of values.  It is worth mentioning what the scheduled headway is supposed to be here:

  • AM peak: 7’30”
  • Midday: 5’40”
  • PM peak:  6’00”
  • Early evening:  6’00”
  • Late evening:  6’00”

The next four pages of the chart break down the cloud of data into individual weeks and add trend lines for each day.  These lines show how the typical headways are, overall, higher than the scheduled value.  This is due to short turns at Queen’s Quay Loop.  The variation in headways with many values well over 9 minutes (the high end of the “on time” standard for a 6 minute headway) shows just how far actual service quality is from what the TTC advertises.

Soon, the bus network will switch over completely to GPS-based vehicle tracking, and the data stream is supposed to be made public.  Whether this actually happens depends in part on the success of TTC managers, who prefer to hide information about service quality, in convincing the new Commission of the need for this secrecy.  In our new era of “Customer Service” and “Transparency”, there will be no excuse, and we may finally start to see just how bad service is on the system as a whole.

Meanwhile on Spadina, TTC staff will again claim that there is lots of service.  The problem is that it does not run reliably.  Capacity could be provided out of thin air simply by spacing cars regularly so that wait times were predictable and loads accumulated more evenly.  However, that would require the TTC actually do something about its service rather than gripe about the cost of more service, the lack of equipment or traffic congestion.

Subway City? (Update 3)

Updated April 2, 2011 at 6:30 am: Additional details about the plan have been provided by Metrolinx.  The dialog below has been slightly edited from email exchanges, but preserves the sense of the conversation.

Q:  The Memorandum of Understanding (MOU) refers to both Black Creek and Jane as western terminals for the Eglinton line.  However, these are over 1km apart.  Where will the line actually end?  How will the line connect with the GO corridor if it ends at Black Creek?

A: The exact terminus for the Eglinton line, which is in the Mt. Dennis area, will be determined through a future additional study due to the vertical and horizontal alignment (how steep the grades can be climbing out of the tunnel and which side of the road we will be on to approach the yard) between Black Creek Drive and Jane Street. The objective is to make the connection to the GO rail corridor.

Q:  When does Metrolinx expect to have a preliminary design proposal for the section of the line east of Leaside that will now be substantially underground?

A:  We are meeting with the TTC now to discuss the timing for the preliminary plans and profiles for the underground segment.

Q:  The SRT replacement is described as ending at STC. Does this mean that McCowan will be abandoned as a station? Will the proposed right-of-way beyond McCowan to Sheppard and Malvern be protected to allow for future extension of the route? Is there any plan for an eastern yard so that trains would not all have to be based at the Black Creek yard?

A: The Scarborough LRT would follow the same route as the existing SRT and will include McCowan Station. At this time, there are no plans to close McCowan Station. We do see value in potentially re-using the McCowan yard for at least a layover site and we will need to study this further.

Q: Although the MOU states the number of stations on the Toronto projects, it does not mention this with respect to Eglinton.  The press release specifies 26 stations.  When will Metrolinx produce a station plan for the new line?

A: The exact number and location of stations for the Eglinton-Scarborough Crosstown LRT project will be finalized as part of the environmental assessment amendment process.

We expect the Eglinton project will have about 26 stations along a 25-kilometre stretch, and we’re pleased to provide this as a single-seat trip for residents from Scarborough to the Mount Dennis Area.

Since the new Eglinton project has changed from the previous concept, the working assumption now is that the station spacing across the route is approximately at 1 kilometre.

We want to make certain that residents get the best use from the Eglinton line, so we are taking more time to study the specifics of the project to determine the exact number and best locations for the stations along the Eglinton line.

The finalization of the Eglinton line and the locations of the station will be part of the preliminary engineering and Environmental Assessment, which is expected to be completed in the coming months.

Comment: The 26-station count includes not just Eglinton but also the SRT.  There were 26 stops on the Transit City version of Eglinton, not including Kennedy, and 6 more on the SRT.  The new combined route will have to go on a diet, and the roughly 1km average spacing implies that some stations will be dropped.  Throughout the Transit City debates, Metrolinx consistently wanted fewer stations on Eglinton, although at the time the underground section was shorter.

Q: Although the MOU makes reference to “LRT”, for certainty does this mean “Light Rapid Transit” as in the Flexity cars recently ordered from Bombardier, or is Metrolinx contemplating a return to ICTS Mark II technology once proposed for this route? This is an important decision as it affects the ability of the line to be extended.

A: On June 14, 2010, Metrolinx announced a $770M purchase of Light Rail vehicles from Bombardier, which included vehicles for the SRT upgrading project. We expect that we will need about 130 LRTs for the adjusted plan, but we will have to sit down with Bombardier and discuss the details. At this time, we do not plan to change from LRT to ICTS MARK II technology.

Comment: “At this time” are three little words that could do a world of damage to future LRT expansion in Toronto.  Metrolinx owes us a definitive answer in the context of their Big Move plan.

Q: The Sheppard East LRT’s costs to date are chargeable to Toronto, but one piece of work already underway is the Agincourt Station grade separation. Is this going to proceed independently of the LRT project as a GO improvement? If so, will it be built with room for a future LRT right of way if that scheme is resurrected?

A: At this time, there are no plans to change the current design for the Agincourt grade-separation. The grade separation construction work that is currently underway at the Agincourt GO Station to separate the GO tracks from Sheppard Avenue will proceed independently of the former LRT project.

It is important to note, though, that this grade separation construction work is an important safety improvement for GO commuters and drivers that use Sheppard Avenue. This grade separation is a project that has benefits to GO’s operations and traffic.

Continue reading

Rob Ford’s Designs on Metrolinx (Update 2)

Updated 9:45am: Environmentalists scoffed at plans to convert rail corridors to roadways.  “Electrification of GO was our big chance to show the world just how green a transit system could be”, said Jamie Kirkpatrick of the Toronto Environmental Alliance.  Trains would not just run with clean electricity from overhead wires, they could be covered with solar panels to provide supplementary power, and wind turbines could be mounted on every car.

“We always suspected Metrolinx didn’t believe in electrification, and Queen’s Park’s quick embrace of Ford’s scheme shows we were right”, said Kirkpatrick.

Transportation Minister Kathleen Wynne refused comment on rumours that a new “Ministry of Highways” would be unveiled in the coming provincial election campaign.

Updated 9:00am: Sources inside the Harper Campaign leaked word that Finance Minister Jim Flaherty and Peterborough MP Dean Del Mastro, eager to show Federal support for Mayor Ford, will ditch their hopes for GO rail service to Peterborough.  In its place will be the “Shining Waters Expressway” linking directly into Toronto’s highway system in the Don Valley.  The Harper Government, if re-elected, will support the project through PPP Canada.

Mayor Ford welcomed the early endorsement of his rail corridor plan saying that with the private sector involved, the taxpayers of Ontario and Canada will benefit from his own innovative financing for the Sheppard subway.

Original post from 8:00 am:

As illustrated on our banner, the Ford clan has secret plans for conversion of the commuter rail network to a new highway scheme.

After banishing LRT from city streets, Mayor Ford continues the hunt for public spaces that are wasted on transit.  Ford argues that the rail lines are empty most of the time, and they’re a vital resource in re-establishing the balance between transit and cars.

Premier McGuinty was not available for comment, but sources tell us that he’s open to any reasonable suggestion from his friend at City Hall.  The Air Rail Link may be the first candidate for this scheme, although community opposition may demand that the line be reserved for hybrid cars.

More info as this story develops.

(Thanks to Len Dieter and Mike Sullivan for catching a test run of Ford’s proposal.)

Finally! A Dundas West GO Connection (Updated)

Updated March 24 at 9:00 pm: Metrolinx has published the materials from the Open House.  Of particular interest is the presentation which shows the proposed changes to the area around Bloor GO Station and Dundas West TTC Station.

In the first phase, the north sidewalk of Bloor Street would be redesigned to widen and otherwise beautify the access to the GO level from the sidewalk in the underpass.  Also, a connection from Dundas West Station would be added at the east end of the platform.  (Page 33 of the presentation shows details of the subway to GO link.)

In later phases, the streetcar loop at Dundas West would be redesigned so that all access was from Edna Avenue with traffic signals.  This could be a mixed blessing given the level of transit service at this location.

Original post below:

Metrolinx has announced an open house for the Dundas West-Bloor Mobility Hub Study.

Date: Wednesday, March 23, 2011
Time: 6 p.m. to 8:30 p.m.
Venue: Lithuanian House
1573 Bloor Street West

Further background can be found in The Star.

Dundas West Station was built before GO existed, much less had service on the Weston corridor, but a connection could be built from the east end of the platform to what is now Bloor Station on the rail line.  However, a major development, the Crossways, was not on top of the subway when it opened in 1966, and any connection must deal with this building.

Trackwork Delayed at Queen & Connaught?

Both the TTC and the City of Toronto websites include announcements of major watermain and trackwork near Russell Carhouse that is scheduled to begin in late May.

This project involves replacement of streetcar tracks including the special work at Queen and Connaught, the west entrance of the yard at Greenwood, and the track on Connaught south to Eastern Avenue.

However, it is unclear whether this will actually occur in 2011 as there have been requests from local merchants that they be spared a second year of construction in a row (the City had Queen Street torn up for watermain work in 2010).

Needless to say, any track construction affecting access to Russell Carhouse will have a considerable effect on operations there.  No details have been published yet on alternate schemes for providing service during the project, whenever it might occur.

When there is a definitive answer on this issue, I will update this article.

Roncesvalles Construction Resumes

Completion of the Roncesvalles reconstruction will proceed over the next four months from mid-March to early July.

The City’s Construction Notice explains the staging of the remaining work between Queen and Dundas Streets.

  • March 21 to 30:  Housekeeping work on sidewalks left over from 2010.
  • March 28 to May 16:  Sidewalk work on the east side of Roncesvalles south from Fern to Queen, and on both sides between Dundas and Howard Park.
  • April 4 to 25:  Enbridge Gas will relocate a main between Geoffrey and Howard Park on the west side of Roncesvalles.
  • May 9 to June 13:  Sidewalk work on the west side of Roncesvalles south from Howard Park to Geoffrey.
  • June 20 to July 4:  Road reconstruction on the west side of Roncesvalles from Geoffrey to Howard Park.

From March 27 onward, the 504 King service will revert to the schedule used in fall 2010 with a bus shuttle running from Dundas West Station to Sunnyside Loop.  Southbound service will run via Lansdowne, and northbound service will run via Roncesvalles.  In early May, construction will reach the point where buses can operate southbound diverting via Howard Park, Parkside Drive and High Park Blvd.  Streetcar service will resume in July.

A related project, the reconstruction of track on King from Roncesvalles to Close, is scheduled to begin in late May and continue until mid August.

A Sudden Surge of Fare Evasion?

To everyone’s great surprise, the TTC recently discovered that fare evasion is a rising problem on the transit system, according to reports in the Globe and the Star.  Is Toronto becoming a city of transit cheaters, or is something more subtle at work here?

Over many years, when the subject of fare evasion came up at Commission meetings, the standard line from management was that Toronto has a very low evasion rate compared to other cities.  Indeed, a 2007 report on the “Business Case” for Smartcards talks about Toronto’s low fare evasion rate and the role new fare technologies might play.  Counterfeit media are considered to be more of a problem than evasion, and the TTC worries that Smartcards for concession fares may be abused at automatic entrances.

The low evasion rate was routinely cited as a reason that the TTC did not aggressively pursue fare inspections because the cost was greater than the potential revenue gain.

Times have changed.  Finding “waste” is the flavour of the day.  Moreover, as the stories linked here make clear, this debate is in the larger context of the TTC’s Special Constable force.  In 2010, the City Budget Committee and Council directed the TTC to reduce this force, and the Toronto Police Service has taken over their function for Criminal Code and other aspects of policing.  This issue came up again in the 2011 Budget, and a City report gives the background information.

It is quite clear that TTC fare inspectors do not require the full powers formerly accorded to Special Constables, but TTC management is exploiting the current financial situation and calls for crackdowns on freeloaders as a wedge to reopen the question of having their own, dedicated force.

Strangely, we find that fare evasion, long considered a non-issue in Toronto, is suddenly a problem.  Have the numbers really changed, or is the jump from past results simply the effect of better enforcement?

Recently, I was riding the Queen car and was asked to show my pass.  This is the first time in over a decade that this has happened.  All door loading is regularly used on Queen, and the occasional freeloader will hop on for a short trip — after all, with almost no inspection, the odds of getting caught riding for five minutes is quite small.

According to the Star’s article, transfer fraud has jumped.  TTC transfer enforcement was simplified some years back by the inclusion of a prominent day number on all transfers, and different colours for each day.  However, a parallel evolution was for operators to avoid confrontation with passengers over fares.  Indeed, even with polite riders, when 30 people all board in a crowd, checking all of their fares is not easy.

For those who do pay fares, we know that over half of all adult trips are done using a Metropass, and there tend to be more passes used on frequent downtown routes because the population of heavy transit users is greatest there.  This begs the question of what the evasion rate is among those passengers who don’t have a pass, those for whom there is an incentive to cheat.

The Queen car’s 50,000 daily riders represent annual revenue of about $30-million, but over half of this will be from passes and various forms of discount media.  If the TTC is really losing $1.2m annually from transfer fraud, this is a large proportion of the riders using transfers.  Catching them should be like the proverbial fish in a barrel, but two fare inspectors working the entire line won’t bring in a big haul.

The move to any new fare system with any kind of self-service validation (e.g. Presto) requires that the system be enforced, and even the TTC acknowledges that it should start more aggressive fare inspection on the streetcar routes, at least, as a prelude to the introduction of the new fleet where all-door loading will be standard.

Oddly enough, the TTC still wants to keep its Special Constables (or whatever they are to be called) deployed on the subway system, with a few left to handle the Queen car on weekdays.  That’s not a scheme designed to catch fare cheats, but simply a continuation of the way the Special Constables have been used since their inception.  If the TTC really wants to improve their haul of fares, then Special Constables should actually spend more time on this activity.

Otherwise, it’s hard to believe that “fare evasion” is anything more than the latest excuse to perpetuate the TTC’s own security service.

TTC’s “State of Good Repair” Funding Crunch

In past articles, I have reported the growth in TTC capital spending and the concurrent problem in funding for the system.  Over coming months, the City of Toronto and its agencies, including the TTC, will struggle to create a viable financial plan for 2012 and beyond.  This will include a five-year projection on both the operating and capital sides, an exercise that will (or should) frighten those concerned with the survival of public services.  However, it should also bring some discipline to year-over-year budgets and project approvals by demanding better accuracy in projections and clear justification for “surprise” projects in the out years.

The TTC capital budget is a formidable document with details in two binders of over 1,600 pages.  The summary form is tens of pages long.  Parts of the public presentation are so dense that one page brought a laughable comment from Vince Rodo, the TTC’s General Manager — Executive:  “You’re not supposed to be able to read that”.  A joke, yes, but a sad comment on the level of detail the Commission and the public see when confronted with a multi-billion dollar budget.

I have already written at length about the 2011 Capital Budget, and in this article I will focus on changes to the budget as it passed through the City’s approval process as well as the outlook for 2012 and beyond. Continue reading

Understanding TTC Project Cost Creep

The recent TTC meeting saw Commissioner Minnan-Wong digging into questions about rising costs on two TTC projects, the design of Finch West Station and the resignalling of the south end of the Yonge subway.

Reports asking for increased spending authorization come through the Commission quite regularly, and Minnan-Wong has raised the question of “out of control spending” at Council on past occasions.  Just to declare my political leanings, I have never been a fan of the Councillor, even though there are certainly legitimate questions to be asked when project costs rise unexpectedly.

Unfortunately, Minnan-Wong tends to approach these issues as if someone is trying to pull the wool over his eyes and implies outright incompetence as the starting point for discussion.  This approach brings more confrontation than information.  Let’s have a look at the two projects in question and consider how information about them (and their many kin in the overall budget) might be better presented.

Continue reading