My Ride on the King Car

A few days ago, my travels took me to Parkdale for a presentation near Jameson Avenue in the early afternoon.  The obvious route for someone like me living near Broadview Station was the King car.  That journey gave several examples of how service can be delayed that have nothing to do with traffic congestion, and illustrate the changes that will be possible when the TTC moves to low-floor cars and all-door loading.

Just south of Danforth, we picked up a load of students from Moncrest School on their way to Thomson Hall.  They filled up the back half of the car.  Just loading them all took a while, and I wondered to myself how the TTC will handle fare collection for this type of group when they move to self-service.  Now we were slightly late.

By the time we were westbound on King, the car was filling up.  A man had boarded with a shopping buggy, and he took a single seat just ahead of the rear vestibule on the left side of the car.  This started a plug in the aisle that worsened when a group of five boarded.  There were not enough seats for all of them, and they wound up partly seated and partly standing right across the aisle from the shopping buggy.  Needless to say they were not going to “move to the rear”.

At Sherbourne, we passed up the first group of would-be customers even though there was still room in the rear vestibule.  This continued at Jarvis, Church and Victoria.

At Yonge, the crowd turned over, but the car was now quite late and we still didn’t manage to fully use the capacity.  By University we were again leaving people at the stops.  The students piled off the car at Simcoe, and by Spadina the car had cleared out reasonably.  All the same, we left an unhappy customer running for the car at Bathurst because getting back on time was more important than waiting, and the next car was only a block behind us.

While this may have been a particularly bad example of how service can be screwed up by loading delays, it’s not uncommon.  The combined effect of many factors interferes with the travel time of TTC vehicles, and this has nothing to do with whether they are in a private right-of-way.

Loading delays caused by inadequate service can cause a downward spiral where line capacity drops even as ridership grows because cars spend longer at stops and onboard crowding slows or blocks movement of passengers.  We hear far too much about traffic congestion as the root of all evil.  Yes, it exists, but it’s not the only problem.

A Few Details About New Streetcars

Based on some of the comments here as well as a few of my own interests, I recently posed three questions to the TTC about the new Bombardier cars.

1. What are the “specified options” mentioned in the report, and when will we know which of these, if any, will actually be included in the order?

Specified options include security camera system, wheel flange lubrication, pantograph current collector, cab training simulator etc. 

Timing for ordering optional equipment depends on:

  • better definition of scope of work and system offered (e.g. camera system);
  • technical and noise necessity (e.g. flange lubricator);
  • system compatibility (e.g. pantograph); and,
  • completion of negotiation of the design and scope of work (e.g. cab simulator).

 2. When will a plan showing the interior layout be available which accurately reflects the dimensions of the Toronto car? Will there be an opportunity to fine tune this, or will that be done as part of the prototype operation when there’s a real car for people to walk around in? I have to assume this must already be available for discussions with ACAT.

While the exterior dimensions are fairly well set, the interior layout can be an evolving process. As noted at the April 27, 2009 Commission Meeting, there are four cost-neutral layouts that would afford flexibility in the final configuration. The current schedule calls for completion of the Conceptual Design Phase four (4) months after Notice of Award (NOA); Preliminary Design Phase twelve (12) months after NOA.

There will be opportunities to review the design through computer modeling and presentations during the design phases. A full-scale, half-car mock-up is scheduled for delivery in 18 months NOA. This would offer a “real car” feel for stake holders including ACAT to critique. The actual Prototype Car No. 1 is scheduled for delivery 26 months [after] NOA.

3. For the transit city network, will this be built to TTC gauge or to standard gauge? In other words, will the two systems and fleets be physically able to interoperate (assuming the TC cars stay away from “tricky” parts of the legacy network) or will the two systems remain disjoint?

This has a specific application to the St. Clair line because there has been talk of connecting it to Jane and operating it out of a TC carhouse. This would require that the 512’s trackage be made compatible with the TC fleet. This has obvious and immediate implications if the specs for the TC fleet have to be nailed down within the next year.

The Transit City network will be built to TTC gauge. Note that once the carbody structure, bogies, articulations etc. of the legacy system vehicles are proven through design, Finite Element Analyses, testing and validation, there will be savings in “proven” equipment and configuration for the TC vehicles, as well as savings through common tooling, manufacturing and quality control processes, if negotiation with the base vehicle carbuilder is successful.

TTC’s wider gauge also offers a wider aisle width and roomier interior, with little incremental construction cost, compared with a “standard gauge” vehicle.

Interoperability obviously involves more than track gauge. If Jane cars are required to operate on St. Clair, a whole host of challenges will have to be addressed, including tight radius curves and steep grades at St. Clair West station and short turn loops en route.

 Thanks to Brad Ross, Director, Corporate Communications at the TTC for this information.

After receiving Brad’s reply, it occurs to me that if St. Clair cars are to be based at a TC carhouse via Jane Street, this would be done by keeping some “city” cars at the new Eglinton West carhouse and running them over the TC network down to St. Clair.  This assumes, of course, that the Jane line is on the surface and makes a physical connection with an extended 512.  All of that is many years in the future, and St. Clair cars will be based at downtown carhouses for many years to come.

Who Will Pay for New Streetcars?

A great deal of bilge was pumped out by Ottawa and Queen’s Park over the past few days about the TTC’s proposed order of new streetcars from Bombardier.

In today’s Globe & Mail, John Barber did a particularly nice job of eviscerating George Smitherman, the Minister of Infrastructure, for his apparent total ignorance of the TTC’s funding needs and requests.

It’s no secret that the TTC is looking for new streetcars.  The original bid process had to be halted when no vendor came up with a technically and commercially compliant proposal, and more recently the whole process of getting a second set of bids has been well covered in the media.

Many of us will remember walking through Bombardier’s mockup display at Dundas Square which happens to be in Smitherman’s riding.  Maybe he was out of town at the time and missed it.

Smitherman claims that the City can’t make up its mind what its priorities are.  Strange that in a letter to Dalton McGuinty, copied to Smitherman, dated December 16, 2008, Mayor Miller wrote of upcoming meetings of Finance and First Ministers:

Toronto’s first priority for infrastructure is to build Transit City, the 21st century modern public transit network that our city needs.  The Government of Ontario has demonstrated foresight and leadership in its support for Transit City.  Toronto City Council has unanimously agreed to request the Government of Canada to provide:

  • $368 million toward the streetcar fleet’s replacement and expansion; and
  • the federal $6 billion share of Ontario’s $17.5 billion Move Ontario 2020 commitment for the Metrolinx Regional Transportation Plan.

The streetcar fleet replacement also shows up in the list of funding requests under the stimulus program by the Federation of Canadian Municipalities.

Other related letters to both Queen’s Park and Ottawa can be found on the City’s website.

Meanwhile, Smitherman’s comment that the TTC shouldn’t be awarding a contract without knowing funding is in place shows that he is badly out of touch.  First off, the TTC has not signed the contract, and its execution is dependent on funding being in place.

Second, there is a long history of agencies such as Metrolinx (a provincial body) announcing plans for which they have no funding, and for which even discussion of proper funding won’t happen for years into the future.  There are two subway extensions (Spadina/Vaughan and Richmond Hill) of which the first was not fully funded until long after the project was announced, and the second still does not have full commitments.

That’s how projects like this work.

The streetcar purchase will run over a 10-year period, and funding it can hardly be called a short-term stimulus.  Funding would likely come from some other program, but the funding should come.  Toronto is asking, in effect, for $40-million a year from Ottawa and from Queen’s Park to re-equip the core of central Toronto’s transit system and to anchor the expansion of LRT in our city.

Bombardier Recommended for Low Floor Streetcar Order (Updated)

Updated April 25, 9:30 am.  I have added material from the media briefing and the staff report that I did not have time to incorporate in the original article.  The additional material is appended below after the break. 

On April 24, the TTC announced that Bombardier has won the competition for an order for 204 new low floor streetcars for Toronto.  The staff recommendation will go to the Commission itself for approval on Monday, April 27.

Both Bombardier and Siemens bid on this tender, and the proposals from both vendors were considered to be compliant both on technical and financial grounds.  Therefore the question came down to cost and with Siemens’ bid over 50% higher than Bombardier’s, there was no question about the winner.

The vehicles will be a modified version of the Flexity car with three powered two-axle trucks and five car sections.  Bombardier has not yet updated their site with information about the vehicles (as of 2:00 pm EDT April 24).  An illustration of the proposed car is in the Toronto Star’s article posted earlier today.

Although not guaranteed, this contract places Bombardier at the front of the line for supplying cars to the much larger Transit City system, especially if that builds out to anything near its full extent.  The contract includes provision for add-on orders, but the TTC will be negotiating their price separately as the Transit City cars will have significant differences affecting their cost:

  • Transit City will be built to specifications that allow off-the-shelf cars to operate on it — no tight curves or steep grades.
  • The TC cars will be double-ended and double-sided.
  • The TC cars will likely have only two powered trucks rather than three.

Subject to funding, a process still under negotiation with the Federal and Provincial governments, the first prototypes would arrive in Toronto in mid-to-late 2011 for non-revenue testing.  Production deliveries would start in 2012 and stretch out to 2018 by which time the last of the existing CLRV and ALRV fleets would have been retired.  A new carhouse, likely in the Port Lands, will be required to house this fleet while the older cars would run from Russell and Roncesvalles.

Postscript:  I cannot help mentioning that the illustration of the new car shows a vehicle facing westbound on Queen at Bay signed “Neville”. Continue reading →

Buses on Streetcar Routes?

The CBC this morning carried an item reporting that the TTC would begin running buses on streetcar routes to relieve crowding.  Chair Adam Giambrone was quoted as saying that cars don’t get out of the yard due to “safety” problems such as dashboard heaters failing and causing windows to fog up.

Sigh.  That’s this week’s excuse.  Things are getting bad when the best that Giambrone can trot out is that chestnut “safety” that is a catch-all excuse in the same league as “congestion” and “TTC culture”.  The real problem is that the TTC has been hiding reliability problems with the streetcar fleet for years, and needed service improvements don’t show up because they don’t have enough working cars.  The problem has been masked because at least one carline has been under construction for most of the last five years.

Next week, a new schedule comes into play on Queen with less, yes less service than today.  The reason?  The operators need even more layover time (strangely only on weekday schedules but not in the evening), and the TTC comes up with this by stretching the headways.

Management’s refusal to undertake a restructuring of the line, to break it into separate components that don’t have an immense round trip and a corresponding need for layovers, is getting quite trying.  The use of relief crews at Russell Division works in the east end because the carhouse is near the end of the line, but a completely different scheme is needed in the west for Long Branch bound cars.

If we are going to start busing streetcar lines, then let’s stop running inadequate service to handle the demand on the routes.  Stop telling us about average loads that are within standards when news reports include clips of people complaining about huge gaps and crowded cars.

Thanks to inaction on streetcar reliability, riders will have to put up with ongoing problems for three years until the new fleet begins to arrive.  Even that is dependent on funding, and I am not convinced that the streetcar fleet will survive the many demands for new money in Ottawa and Queen’s Park.  Is this the beginning of the end?  A fate like the trolleybus network that was allowed to deteriorate beyond the point of no return?

Transit City — The Movie

Today’s TTC meeting brought us an update on the various parts of the Transit City plan.  You can read the full report yourself, and there is a quick review of the status of various lines and studies below.

Meanwhile, the TTC is starting a media campaign to tell people about Transit City and about LRT.  You can watch the video on the TTC’s website.  Although it is a breath of fresh air to see the TTC promoting LRT after all these years, there are a few oddities in this piece (the timings where they occur are included below).

  • (0:39) “Work on Transiy City is already well underway.”  Hmmm … a few traffic barriers does not make a construction project.  I wonder why they don’t show the upheaval on St. Clair?  Shortly later we see a new car mockup superimposed on the westbound stop at Yonge Street.
  • (0:55)  “What is Light Rail Transit?”  We learn that LRT is used around the world including, wait for it, in Vancouver!  Er, ah, there’s a heritage streetcar line running with a former BC Electric interurban car, but no LRT.  This is a howling error.  Other cities shown on the world map are many fewer than the actual inventory.
  • (1:15)  “LRT can operate in a street, but has the flexibility to operate underground like a subway.”  LRT advocates will be amused to hear that their chosen mode has the “flexibility” to be just like a subway, when the real issue is the inflexibility and cost of 100% grade separated modes.
  • (1:50) Light rail is bigger than standard streetcars, and allows level boarding from platforms.  It’s nice to hear how LRT is a streetcar, but not a streetcar.
  • (2:10) LRT cars don’t need loops!  Amazing what you can do with modern technology.  See also Kennedy Station Loop.
  • (2:20) All door loading … but wait .. it’s a subway car!
  • (2:38) LRT will be separated from the effects of traffic congestion, not to mention pesky “transit priority” signals if the animation can be believed.
  • (3:32) Streetscaping.  Aside from the gigantic, fast-growing trees (maybe they’re from Vancouver too), note the typical suburban layout with wide setbacks of buildings from the street.  Contrast this with later illustrations of dense suburban redevelopment.
  • (4:05) Transit will be an even better travel alternative.  With a new subway train?  What’s that doing here?

The map of projects reflects the original Transit City announcement because many possible changes are still under study by both TTC and Metrolinx.

Transit City project updates follow the break.

Continue reading →

The TTC’s Low-Floor LRV Presentation of August 27, 2008 (Update 2)

The TTC has not published the presentation on their website, and in the interest of having the material in view, I am transcribing it here.  Few pages involve diagrams, and so for the most part I will simply transcribe the text.

Where I comment on the material, I will do so in italics to distinguish my words from the TTC’s.

The pages with diagrams are linked to scanned images.

Update 1 (August 30):  In the post below, I originally said that the chronology did not mention the change from a 70% low floor spec to 100%.  A quibble has been raised on this point.

The original spec had both 70% and 100%, and the change was to remove the 70% option.  The net effect was the same:  any 70% low floor car that might have been proposed was eliminated from consideration.  It remains to be seen whether, in fact, any builder can adapt their designs to Toronto’s track geometry.

Update 2 (September 16):  The full presentation is now available on the TTC’s website.  The links in the post below take you to scanned images on my site.  If you want better resolution, use the TTC copies.

Continue reading →

TTC To Discuss New Streetcars with Three Builders (Update 1)

Updated August 29:

At the Commission meeting on August 27, various deputations spoke to the issue of the streetcar contract.  I am not going to attempt to reproduce their presentations and, in some cases, the extensive Q&A sessions that followed, but will give an overview.

The TTC has not yet posted the staff presentation on their website.  If it has not appeared by this evening, I will scan and post my copy along with comments in a second update.

Mario Péloquin spoke for Siemens Canada with a brief presentation.  Siemens, for internal reasons related to their corporate reorganization, had chosen not to bid but is now interested in the streetcar contract.  Péloquin was slightly apologetic for Siemens’ not having emphasized their long-standing presence in Canada and Ontario.  Obviously this is not as a rail car builder, but in the many other aspects of Siemens operations.

An Alstom representative, who did not expect to be called on, and who has only about half a year’s experience with the company, spoke briefly indicating his company’s interest in the contract.  It would be useful if Alstom can find someone with more depth and credibility the next time they show up.

Skoda was not present, and TTC CGM Gary Webster said that because they chose not to respond after the RFP cancellation, they are no longer at the table.   Whether Skoda accepts this situation remains to be seen.

Representatives of the Toronto Labour Council and of the Canadian Auto Workers (who represent the Bombardier Thunder Bay plant) spoke of the importance of Canadian content in any contract.  This is a difficult issue because so many subsystems for rapid transit cars are built offshore, and even the carbodies would likely be fabricated in existing foreign plants and shipped to Canada for final assembly.

The TTC and Ontario already have a 25% Canadian content rule, and the Commission passed a motion indicating that they would like prospective builders to work toward a higher goal of 50% if this contract progresses to include the 350 cars needed for Transit City.  A proposal to ask for sliding scale bids based on various levels of Canadian content was not adopted.

Bombardier’s representative, Mike Hardt, spoke about his company’s unhappiness with the process.  Bombardier feels that their bid was disqualified on a technical ground that was not justified, and they are concerned about now being placed in a different, unstructured bidding situation.  Bombardier claims that the mismatch between their cars and the TTC’s existing track system can be remedied by $10.4-million worth of work, but it is unclear of the time period this would cover nor the validity of the estimate. 

The work would involve grinding and filling track mainly at intersections to fit the Bombardier equipment’s wheel profile.  The TTC disputes this scheme and is concerned, legitimately I believe, that this would impose an ongoing requirement to maintain all track to a special standard to avoid safety problems with the new cars.  Ironically, Hardt also stated a few times during the Q&A that Bombardier could meet the TTC spec if they had to, but disputes the requirement.  The positions are contradictory:  either Bombardier could bid a car that met the spec, or they have strong objections to doing so and prefer that the TTC adapt their infrastructure.

Hardt said that if Bombardier’s cars wouldn’t work on the TTC system after delivery, they would be repaired at the vendor’s cost.  Commissioner Perruzza told Hardt to put that in writing.  However, we already know that Bombardier’s idea of “working” includes having the TTC make track changes, and there would doubtless be endless wrangling over whether a derailment was the TTC’s or Bombardier’s fault.  It’s easy to claim you will pay to fix something when you have an escape clause of blaming the client.

Most striking about Hardt’s deputation was the arrogance he displayed toward the TTC.  I was fascinated to watch the faces as one Commissioner after another could not believe the way they were being treated.  If I had presented a deputation half as contemptuous of staff, I would have been at best given my five minutes and at worst told to shut up and sit down.  Even Commissioners of a left-wing bent who support the Thunder Bay workers were driven to far more aggressive questioning than Hardt might otherwise have received.  He did Bombardier and its workers no favours and has likely alienated the very “friends at court” Bombardier might need if the debate comes down to a close decision between proponents.

Continue reading →

Škoda to Propose Streetcars for Toronto

News comes to me that Škoda, one of the streetcar manufacturers who declined to bid on the recent TTC request for proposals, plans to re-enter discussions with the TTC.

At this point, I have no information on what vehicle(s) they might suggest, but a look at their website shows an interesting mix of possibilities.

Tramcar product page

This page shows a range of Škoda’s streetcar products, but does not include their latest 100% low floor model.

Model T15 low floor car

An order for these cars was recently placed for Riga, Latvia according to a press release.  Although the T15 is officially standard gauge (1435mm), the Riga cars will be a wider gauge (1524mm, or 5 feet) leaving Toronto in the middle of the range.

More news on this as and when it develops.

TTC Cancels Streetcar Request for Proposals (Update 4)

Updated July 20, 10:00 pm:

TTC Chair Adam Giambrone now admits that his statements about information in Bombardier’s bid referred to TTC staff remarks, not Bombardier’s submission itself. 

See coverage in the Globe and Star.

I can’t help finding this situation very embarrassing for the bid process, and distressing because of the potentail for delay in procurement of cars for both the “city” streetcar system and for Transit City.

Updated July 18, 4:10 pm:

Additional media reports in the Globe Report on Business and in the Sun.

Updated July 18, 6:30 am:

Media reports on this issue appear in the Star, Globe and National Post.

Updated July 17, 10:10 pm:

When a story this big lands at 4:30 in the afternoon via a press release, there is usually a flurry of interest and followup information, but so far things have been fairly quiet.  In the absence of specific comments, here are a bunch of questions for everyone involved:

  • Why did Bombardier tell us throughout the RFP process that they had a car for Toronto, and happily let the CAW shill for them to keep jobs in Thunder Bay, only to turn around and bid a non-compliant car.  Did they think that the TTC would automatically turn to them for an alternate design without widening the field?
  • The TTC press release states that they can sort out the problems with some manufacturer over the next four weeks.  How is this possible unless Bombardier already has a “plan B” ready to go? 
  • Why was the TTC so confident, when they changed their spec midway through the process to require 100% low floor vehicles, that this would not compromise bidders’ ability to propose a compatible vehicle?
  • What parts of the spec, beyond the tight curves on our street railway system, are impediments to other vendors, or are they just tired of all orders going to Bombardier and not bothering to waste their time on a bid?
  • Has the TTC considered whether other operators of “legacy” street railway systems in North America might also have a need for cars that fit on older systems where PCCs had no problem operating for decades?
  • What is the future of our streetcar system with an aging fleet of CLRVs and ALRVs rumoured to be less than 100% available?  Will the TTC at least commit the resources needed to get all of its current fleet back on the road?
  • How will a delay in acquiring new “city” cars affect plans for Transit City?

Inevitably, opponents of the TTC and of LRT in general will seize on this foul-up to show how the TTC can’t plan properly (as if we had any sterling examples elsewhere in these parts), and how an all subway, BRT and maybe even RT network is just the ticket.  They would be wrong, and any agency or politician who attempts such an attack will get no quarter from me.

Yes, this is a bad situation.  Toronto dithered for years about new versus rebuilt streetcars, finally opted for all new, then changed their spec to all low-floor, and now faces a delay for which there really wasn’t any room in the schedule.  Moreover, they still don’t know who will pay for the new fleet.

Metrolinx for its part is still pulling together a regional transportation plan, but seems to be pricing themselves out of the market.  Their plan has a huge capital and operating cost, and does nothing to improve local transit service, an essential part of any regional scheme.  Any move by Metrolinx to slip into a perceived vacuum at the TTC would be complete folly.

Indeed, Metrolinx was specifically set up not to be a local transit operator for fear of alienating the 905 municipalities forming the heart of its Board.  The last thing Metrolinx needs is having to explain what passes for service on the Queen Car.

The TTC needs to be upfront about the problems, about why so few bids were received and about what can be done to get real competition.  They need to re-establish Toronto as a credible city in which any vendor other than Bombardier actually has a chance of winning business. Continue reading →