Events of the past 24 hours have overtaken me with the leak of a draft of the Draft Regional Transportation Plan to the Globe and Mail.  I had intended to hold off talking about that for a few days on the assumption it would leak out of this weekend’s retreat by the Metrolinx Board, but there it was, at least a few tastes, on the front page no less.

All the same, I want to pursue my original plan which was to trace the evolution of plans to what is likely going to show up in the Draft RTP.

In the previous post, I talked about the IBI studies done for the GTTA/Metrolinx startup in January 2007.  The Green and White Papers, and now the draft plan are direct descendents of those original studies, but with important differences along the way.

All of the reports I am discussing (except the draft plan which is not yet published) are available on the Metrolinx website.

Continue reading

Where Should Metrolinx Be Going? (Part 2)

In the first part of this article, I wrote about many of the ancilliary aspects of the transit system and ways to move people around the GTAH.  Active Transportation.  Mobility Hubs.  Transportation Demand Management.  Now it’s time to look at the transportation networks.

When we review the various proposals, it is important to remember that right up to and including the White Paper, the networks were only samples intended as fodder for the demand assignment model.  “Let’s see what happens if we put a line here” is the basis for these exercises, although some knowledge of the overall behaviour of the GTA informs where one draws lines on the trial maps in the first place.

The test cases originated with a group of reports written by IBI as part of the startup of the GTTA, later Metrolinx, called Transportation Trends and Outlook for the Greater Toronto Area and Hamilton, and the Strategic Transit Directions report within this.

Next came the Metrolinx Green Paper #7 on Transit, followed by White Paper #2.

All of these reports are available on the Metrolinx website.

Strategic Transit Directions

Going back to this report (dated January 29, 2007), I was fascinated by some of the material it contains and how this has, or has not, been reflected in Metrolinx work over the past 18 months.  At the risk of being accused of “cherry picking”, there are important findings in this document.

Continue reading

Where Should Metrolinx Be Going? (Part 1)

With the Draft Regional Transportation Plan due out in September and a brief consultation period thereafter, I’ve decided to stake out some basic positions in advance.  Will Metrolinx give us a plan, or merely a warmed-over rehash of MoveOntario 2020?  Will they propose realistic financing both for capital projects and the increased scope of transit operations, or will they assume money will somehow be made available in budgets they don’t control?  Will the plan recognize the importance of local services, or fixate on regional, commuter-oriented lines?  Will the plan meaningfully address issues of congestion and the environment?

These questions and more should provide yardsticks to measure the draft RTP and the associated financing strategy.

What Is the Metrolinx Mandate?

Metrolinx operates under a legislative requirement to produce a Regional Transportation Plan including:

  • all modes of transportation,
  • intelligent transportation systems and other innovative technologies,
  • compliance with provincial and local policies, strategies and Official Plans,
  • the integration of local transit systems with each other and with GO Transit,
  • reduced congestion, commute times, and emissions,
  • development that supports transit and optimization of transit infrastructure,
  • a rolling five-year capital plan and associated investment strategy.

[Greater Toronto Transportation Authority Act, 2006, Section 6 (2)]

Notably, sections of the legislation involving the takeover of GO Transit by Metrolinx (43 to 45) and the creation of a consolidated fare card (7) have not yet been proclaimed.

The question of compliance with local plans is quite intriguing.  Many of the strategies for handling transportation demand will require changes in the way the GTA is developed.  Densities and land use patterns in place for decades will not achieve transit supportive development, and yet the imposition of new rules will almost certainly require that local plans be brought into line with Metrolinx goals. 

I hesitate to say “provincial goals” because we never quite know how serious Queen’s Park is about changing the built form of the GTAH.  A further problem is that the provincial goals change with the political weather, and all we need is one term of a laissez-faire, pro-development government, and all the controls will vanish in an instant.  Once the rules give developers the right to build, taking away that right is contentious and expensive.  We’ve seen this strategy in Toronto itself (complain when the left wing is in power, grab all you can when the right wing takes command), and there’s no reason to believe Queen’s Park would be any different.

Continue reading

The Psychology of Free Parking

Over the past week, since the TTC proposed, then approved, the elimination of free parking for Metropass holders, I have been amazed by the volume of comments on this blog, other sites and in feedback in the mainstream media on this subject.

Parking is something dear to the hearts of motorists, and taking away free parking seems to be on a par with kidnapping a firstborn child.

Several people commenting on my site have claimed that getting rid of free parking at TTC or at GO lots will drive people (sorry about that) into commuting all the way downtown even if they have to pay for parking. There is a long comment by Andrew currently at the end of the thread comparing the costs and time required for various types of trip (all car, part transit, paid and unpaid parking). The viewpoint embedded in his calculations mirrors that of many who write about the need for free parking. Continue reading

Commuter Parking for Metropass Users (Update 1)

Update 1, August 27, 10:00 pm:

After a lengthy debate regarding the fairness of charging for parking and various alternatives, the Commission voted 5-3 this evening to implement the staff recommendations.

Original post:

Today, the TTC will consider a proposal to eliminate free parking for Metropass users at its lots.  When I first heard of this, my reaction was supportive because, as a non-driver, I don’t benefit from whatever subsidy the parking lots represent.  Some media comments have placed this subsidy as high as $7 per user per day, an unconscionable amount of subsidy that would be intolerable if “parking” were a proposed new route.

However, looking closely at the figures reveals a different story.

The TTC loses $3.6-million annually on parking operations on a total budget of $6.3-million.  In other words, the cost recovery is about 43 percent.  Things don’t look too good yet.

However, there are 14,000 parking spaces and this means that the loss per space is about $250 per year, or about $1 per weekday.  This is nowhere near the figure cited above, and is much more in line with a reasonable incentive to use transit. 

By analogy to bus and streetcar routes, the subsidies vary from route to route, but the network is most important.  At $1/space/day, this subsidy is higher than the average for many bus routes, but not completely off the map.

Conversely, if the TTC were able to fill its lots even with a parking charge of $2 or more, they would make far more than is needed to offset the operating cost.  Bluntly, the TTC’s numbers don’t add up.

Lest you think that I am an advocate for commuter parking, that’s quite another matter.  Parking lots have many undesirable characteristics including the poisoning of land for community use — buildings generating lots of pedestrian activity and a sense of neighbourhood.  New parking lots have property and construction costs, and if structures are involved, those costs will be substantial.

Even existing lots can represent lost opportunities.  When the outer stations on the Bloor-Danforth line were built, land was cheap and a lot of it was already in the public sector.  Parking was an obvious land use.  Only now, 40 years after the lines opened, are we starting to see development at some locations that should have appeared years ago if the common myths about subway stations creating development could be believed.  In effect, the TTC strangled development right where it would be most desirable by dedicating so much land for parking.

As an aside, I should note that some lots such as Finch are on land that cannot be developed, and this at least puts the Hydro corridor to some use.  However, there is a limit to how far east and west from Finch Station parking can be built, and sites like this are an exception in the system overall.

On GO Transit, the lots at stations are full by 7 am, and massive parking expansion is really not in the cards.  GO has more stations in industrial areas where high density residential development is less likely, but the problem remains that there’s a limit to how much land the transit system can dedicate to parking.

The real problem is that feeder services to GO and TTC stations leave a lot to be desired especially as demand on both systems grows, bidirectional travel becomes common, and frequent all-day GO service is finally getting serious discussion in transit plans.

As for the existing TTC lots, my position is this:  if they can be redeveloped both to liberate the capital value of the land and to provide more transit riders while converting sterile transit terminals to community centres, so be it.  In those odd cases like the Hydro corridor where redevelopment is not practical, let people park, but recognize that there are limits to this and that parking is not a panacea for attracting riders to transit. 

As always, good service is the key.

Green is Nice, Working is Better

The New York Times has an article today about a scheme in NYC to operate escalators at variable speeds.  This is intended to save energy by slowing down escalators when nobody is on them.

Despite claims by the MTA, several of the “converted” escalators either were not working at all, or were not behaving as advertised.

The nub of the issue comes right at the end of the article:

Rick O’Conor, who runs the Roosevelt Islander blog, questioned the need for the new technology. “It’s not of primary importance to have motion-activated escalators,” he said. “It’s of primary importance to have escalators that work.”

He said that all 10 escalators at the Roosevelt Island station had been out of order recently, and that his elderly mother had had to walk up the stairs. “A group of teenagers were nice enough to ask if she wanted them to carry her,” Mr. O’Conor said, adding that his mother pressed on.

Of the 10 escalators at Roosevelt Island on Monday, two had yet to be fitted with the sensors and two were shut down.

Another resident, Valentina Montecinos, 28, said, “Sure, it’s a good idea to save energy, but these escalators are never working anyway.”

Alas this is the fate of so many good ideas that bedevil transit systems and other public agencies.  In the name of some higher goal, be it the environment or fiscal responsibility, something is rolled out through an organization that is already doing a tenuous job of running their system.  The new, improved function doesn’t work and may even work less reliably than what it replaced, and “going green” takes a black eye.

Toronto has a bad habit of ignoring or downplaying the importance of a lot of things like reliable escalators and elevators.  Without these, many people can use the subway and RT only with difficulty or not at all.  We hear a lot about “safety” and the number of checks that must be made before a machine can be restarted.  The point is that if you’re going to have this technology, then it has to run reliably and staff must be available to keep it online.

Meanwhile, if anyone has some brilliant brainwaves about transit, make sure that they can actually work successfully rather than creating one more way for riders to be annoyed with poor service. 

How Many People Will Ride the Eglinton Line? (Updated)

[Update:  As promised, I have received the updated ridership projections TTC is using for Transit City.  They have been added in the body of this post.]

Recently, there has been a lot of ink about the technology choice for an Eglinton rapid transit line, whatever it may turn out to be.  Earlier this weekend, after a nagging period when I thought the ridership projections looked a bit off, I went back to the source material to check.

In the Globe article on July 24, Adam Giambrone says that the route’s projected 9,000 riders in the peak hour of the morning rush in 2021 don’t justify a subway.   Hmmm.  9,000 you say?

[This section has been updated.]

Let’s have a look at the original Transit City projections and the revised values now in use as part of the EAs in progress.  Original values are in parentheses.  Current values are for 2031 and reflect anticipated population and employment growth, although further refinements are possible as the EAs progress.

  • Eglinton:  5,000-5400 (4,700) (see below)
  • Scarborough-Malvern:  4,600-5000 (3,900)
  • Don Mills:  2,600-3000 (2,900)
  • Sheppard East:  3,000 (2,700)
  • Jane:  1,700-2,200 (2,700)
  • Finch West:  2,300-2,800 (2,300)
  • Waterfront West:  2,000-2,400 in 2021 (Taken from EA document) (2,200)

The revised values are current while the originals date from March 2007.

The Eglinton projections do not include Airport ridership.  However, traffic to Pearson will generally not co-incide with the peak time, location and direction and is unlikely to make much if any impact on the required level of service.

In the Sheppard EA, there is a note that peak ridership on a full Sheppard Subway to STC is projected to be about 5,000/hour versus 3,000 projected for the LRT east of Don Mills.  This appears to support arguments that a subway network will attract more riders, but the TTC also notes that the majority of the additional riders are merely diverted from other transit services.  What is unclear is the impact of less accessible transit service for local trips and the effect on transit usage and pedestrian amenities in the areas between subway stations.

If we look at the Eglinton projection of 5,400, we can expect that a full subway would attract more riders, but still well below the level needed to justify that level of capital investment, and still leaving the question of what other routes these riders might have used.

Even with revisions, none of the lines was expected to come anywhere near subway-level demand.  I am particular struck by the drop in the estimated demand on Jane which begs the question of whether it is an appropriate corridor for this technology.

[End of Update]

Eglinton is a particularly important case because it is at least two separate routes west and east of Yonge, and the demand accumulating at any point will be affected by what routes and services intersect it.  For example, as on the bus service, riding east of Eglinton West Station will be lower than to the west because many trips will transfer to the Spadina subway.  East of Yonge, the provision of an alternate, fast route to Danforth or further south via a Don Mills or Downtown Relief line will drain much load that would otherwise continue west to the Yonge Subway.

Many months ago, I asked Metrolinx to release the detailed ridership projections for each component and segment of their various “test case” networks.  I was assured that this information would be published concurrently with the draft Regional Transportation Plan.  Alas, that plan sits in limbo and will not appear until, at best, late September.  The modelling is for the test cases was done long ago, and there is no reason Metrolinx should keep the results secret. 

Of course, the numbers may not back up some of the plans people have for various rapid transit schemes, and the data could set off a debate about just what sort of network is really needed.

The last thing we need is a huge rush this fall to ram through a draft plan just so that Queen’s Park can announce something in time for the next election.  Given both the economic situation and the frosty reception from Ottawa to fund MoveOntario, let alone Metrolinx, the pressure to approve something, anything may have waned a tad.

Without question we need to spend more on transit, but let’s do so where and how it’s demonstrably needed rather than pre-announcing routes and technologies. 

Metrolinx vs Toronto: What To Build on Eglinton

Jeff Gray and Matthew Campbell report in today’s Globe on the potential for conflict between Metrolinx and the TTC over the future of Transit City and, in particular, the choice of technology for the Eglinton line.

I have written at length about this before and won’t rehash the arguments here, but a few remarks in the article deserve comment.  Rob MacIsaac parrots subway boosters with this gem:

“If you’re going to travel from one end of that line to the other, we think you’d probably better pack a picnic lunch,” Mr. MacIsaac said.

“We would like to find a way to speed it up for people who are travelling longer distances.”

And why, he asked, build something that could end up overcrowded?

“There’s little point in spending a lot of money on an LRT line that will end up with passengers whose faces are pressed up against the windows.”

Why indeed would someone ride from Scarborough to Pearson Airport or Mississauga when MacIsaac’s own plans call for an express route across the 401 corridor?  The whole point of a network is that it must serve a variety of demands — some long haul, some local.  Just as we now have GO Transit for commuters from the 905 to downtown, we would also have high-speed services for trips across the 416/905 region.

A trip from Scarborough to Pearson is longer than a trip from Pickering to downtown Toronto, and comparable to a trip from Richmond Hill.  Misguided planners and politicians insist on treating it as a local trip that should be stuffed into the TTC network.  Having created this straw man, they claim this justifies a full-blown rapid transit line on Eglinton.

As for demand, the TTC’s projection for Eglinton is 9,000 per hour, and this would be on the busy central part of the route that will be underground.  Outer parts of the route will easily be within the capacity of surface LRT which has the added advantage of lower cost and more attractive station spacing for local demands.

Despite its protests that its work is only “test cases”, not formal plans, Metrolinx is showing its true colours by making technology choices long before they have demonstrated the need for their network schemes.  Public consultation is a sham designed to give people a warm fuzzy feeling about Metrolinx rather than engaging them in a real debate.

MacIsaac’s comments about Eglinton show that the real agenda is to push through a major rapid transit project, likely a western extension of the Scarborough RT.

The Metrolinx Board has not met publicly since June 13, and the regional plans were last on the agenda on April 25.  Their next meeting is scheduled for late September.

It’s time for the Board to tell the chair to stop musing about network options that are not yet even a draft plan.

Transit: Too Important For The Politicians? (Updated)

In today’s Star, Christopher Hume advances the argument that the only way we are going to get some decent decisions about transit hereabouts is to have a regional board with real teeth — taxing and expropriation powers.  Moreover, this board should not be composed of politicians, but of “experts”, whatever that may mean.

As regular readers here will know, I have my doubts about “experts” for many reasons, but principally because they inevitably serve some political master.  Somehow they get appointed, and that usually results directly from kissing the hand that blessed them for their supposedly apolitical role.

Just because someone is unelected and has a degree in a professional field does not make them ideal to handle the complex job of not only planning and operating a regional transportation system, but of convincing people (and those pesky politicians) that the money raised and spent actually goes for a good cause.

The TTC used to be an un-elected body, then a mix of Councillors and appointees.  That dysfunctional arrangement eventually led to a complete takeover by Council to ensure that the TTC actually operated for the public good.

To date, Metrolinx, an organization largely run by “experts” even though the public face is that of politicians, has done poor job of explaining itself and its proposals even to those, like me, who take the trouble to read all of their material.  Already, we see an immense web of transit lines with no data to justify individual components.  “Test cases” constructed as straw plans to see how they behaved in a traffic model threaten to become unchangeable blueprints for our future transit network without benefit of proper analysis.

I contrast this with the outcry from many “expert” quarters when Transit City was announced that the presumption of LRT foreclosed debate on alternatives.  Some of those same experts would now foist a regional plan on us for unquestioned acceptance.

Politicians will always be in charge of large-scale infrastructure decisions whether they are officially on boards or not.  They control the funding.  There is no way an agency with a published appetite for almost $8-billion a year will be allowed to operate without political oversight.

The challenge is for both the board and staff to have the public’s trust, to bring forward plans and projects that demonstrably improve our transportation network.  Self-perpetuating cliques, be they friends of government of the day or an old boy’s club of experts, are throwbacks to past failures, not models for our future.

Updated July 22

A comment yesterday evening from “POS” triggered a lengthy response from me, and the argument is important enough to move it here into the main part of the post.

“Steve, do I sense a hint of sour grape bitterness in your post? Who would be better suited to plan and operate this complex job?”

My point is that that any organization performing this function needs to be open and accountable, and that inevitably brings us to politicians of some flavour. Many agencies, not just those in the transit business, yearn for the simplicity of just getting a potload of money out of thin air and going forth with their allegedly good works unburdened by public oversight. A benign rule of experts.

There are three big problems. First, there is rarely enough money available for the taking without debate. The right wing spent the better part of three decades convincing everyone they are overtaxed, and the word “toll” is guaranteed to get you tarred and feathered in many quarters.

Second, the experts are not necessarily in sync with the larger public about what should or should not be done. For example, we would have a lovely highway network and no downtown if the “experts” in charge of transportation planning through the 50s and 60s had not run headlong into public opposition and, yes, another set of “experts” whose view of the world consisted of neighbourhoods and urban civility.

Third, some experts have agendas of their own born out of personal prejudice (I may like streetcars, you may like subways) or blatant conflicts of interest (property development, technology vendors).

The idea that the correct set of experts will be in power at any time is no more credible than the concept that any one political party has an ideal program and the divine right to govern without benefit of public review. The premise that we can escape the sins of decades of bad planning simply by handing our cities over to a technocracy is laughable.

“Making the trains run on time” sounds like a laudable goal until you are forced to leave your car at home by an environmental dictatorship, or my house is demolished by a road czar to make room for a wider thoroughfare. Both would protest that they’re just doing their “expert” job, but at what cost?