Will The TTC Board Ever Discuss Policy, or, Good News Is Not Enough (Updated)

Updated January 21, 2014 at 2:20 pm:  The description of the loading standards introduced with the Ridership Growth Strategy has been corrected.

The election season is upon us in Toronto, and transit made an early appearance on the campaign with mayoral candidate David Soknacki’s proposal that Toronto revert to the LRT plan for Scarborough.  I am not going to rehash that debate here, but there is a much larger issue at stake.

The Ford/Stintz era at Council and at the TTC has been notable for its absence of substantive debate on options and alternatives for our transit future.  Yes, we have had the subways*3 mantra, the palace coup to establish Karen Stintz and LRT, for a time, as a more progressive outlook on the TTC Board, and finally the Scarborough debate.

But that’s not all there is to talk about on the transit file.  Do we have a regular flow of policy papers at Board meetings to discuss what transit could be, should be?  No.  Ford’s stooges may have been deposed, but the conservative fiscal agenda remains.  Make do with less.  Make sacrifices for the greater good, whatever that may be.  Show how “efficiency” can protect taxpayer dollars even while riders freeze in the cold wondering when their bus will appear.

Every Board meeting starts with a little recitation by the Chair of good news, of stories about how TTC staffers helped people and the good will this brings to the organization.  There is ever so much pride in improved cleanliness and attractiveness of the system – a worthwhile achievement, but one that should become second nature to maintain.  It should also be a “canary in the coal mine”, a simple, obvious example of what happens when we make do with “good enough”, with year-by-year trimming to just get by.

If the bathrooms are filthy, imagine the condition of the trains, buses and streetcars you are riding.  I’m not talking about loose newspapers blowing around, but of basic maintenance.  From our experience in the 1990s, we know how a long slide can take a once-proud, almost cocky system to disaster, and how hard it is to rebuild.

In a previous article, I wrote about the threat to basic system maintenance posed by underfunding of the Capital Budget, an issue that has not received enough public debate.  Part of the problem is that the crucial maintenance work that must occur year over year is treated the same way as new projects.  Maintenance competes with the glamour projects for funding, and may be treated as something to be deferred, something we don’t need yet.  Couple that with starvation of funds for basics like a new and expanded fleet and garage space, and there’s a recipe for a TTC that will decline even while more and more is expected of public transit.

The budget isn’t the only issue that deserves more detailed examination, and many other  policies should be up for debate.  Within a month, the TTC will have a new Chair as Karen Stintz departs for the mayoralty campaign.  Within a year, Toronto should have a new Mayor, one whose view of transit is not framed by the window of his SUV.  At Queen’s Park we may have a Liberal government with a fresh, if shaky, mandate to raise new revenues for transit construction and operation, or we may have a populist alternative with a four-year supply of magic beans.

In the remaining months, the TTC Board has a duty to lay the ground for the governments to come, especially at City Hall.  The 2015 budget debates should be well informed about the options for transit, if only for planning where Toronto will need to spend and what services the TTC will offer in years to come.  Will the TTC rise to this challenge, or sit on its hands with a caretaker Board until the end of the current term?

Here is a selection of the major policy issues we should be hearing about, if only the TTC would engage in actual debate to inform itself, Council, the media and the voters.

  • Fare structure:  What is the appropriate way to charge fares for transit service?  By time, distance, week, month?  How does smart card technology change the way fares are collected and monitored?  What are the implications for regional travel and integration?
  • Service standards:  What loading standards should be used to drive service improvements?  Should the TTC build in elbow room to encourage riding and to reduce delays due to crowding?  Should there be a core network of routes with guaranteed frequent service?
  • Service management:  What goals should the TTC aim for in managing service?  Do the measures that are reported today accurately reflect the quality of service?  Are bad schedules to blame for erratic service, or does this stem from management indifference or from labour practices that work against reliable service?  What are the tradeoffs in the relative priority of transit and other traffic?  What are the budgetary effects of moves to improve service?
  • Budgets and Subsidies:  Both the Operating and Capital Budgets have been cut below the level recommended by TTC management.  These cuts will affect service and maintenance in the short and long term, but there has been no debate about the effect, especially if these are not quickly reversed in a post-Ford environment.  The Capital Budget faces a huge gap between available funding and requirements.  Over ten years, the shortfall is 30% in available financing versus requirements, and this is back-end loaded so that the shortfall rises to 50% in later years.  The proposed level of City subsidy is barely half what would be needed if Queen’s Park returned to its historical 50% capital funding formula.  Hoped-for money from Ottawa is more likely to finance major projects such as new subway lines, not the “base” budget for capital  maintenance.  The budget, especially capital, is not well understood by the TTC Board or Council in part because of the confusing way in which it is presented.  Toronto cannot begin to discuss subsidy policies if those responsible for decisions cannot understand their own budgets.
  • The Waterfront:  While battles rage over subway and LRT proposals for the suburbs, a major new development on the waterfront is starved for transit thanks to cost escalation, tepid interest by the TTC, and the perception that waterfront transit can be left for another time.  The pace of development may be threatened if good transit does not materialize on Queens Quay, and later to the Port Lands, but meanwhile this project sits on the back burner little understood by most members of the TTC Board and Council.
  • Rapid transit plans:  The artificial distinction between GO and the subway (or even higher-end LRT operations such as the proposed Scarborough line) will disappear as GO becomes a frequent all-day operation.  There will be one network regardless of the colours of the trains.  GO service to the outer parts of the 416 is particularly important as an alternative to subway construction serving long-haul trips to downtown.  Subways, LRT and BRT each has its place in the network, but electoral planning must not leave us with fragments of a network rather than an integrated whole.
  • Accessibility:  The need for accessibility extends all the way from the severely disabled who require door-to-door service, through a large and growing population who have some degree of independence, to those whose only problem may be bad knees or a weak heart.  Neither the TTC nor the City has taken the issues of accessibility particularly seriously in recent years.  There may be good words, but the budget and service policies clearly limit the growth of the parallel Wheel Trans system.  Meanwhile, retrofitting the system for full access is delayed thanks to funding limitations at both the City and Queen’s Park.  What we do not know is the true extent of the need for accessibility on the TTC and what this means for service and infrastructure.

Continue reading

Tearing Apart The Big Move

The Neptis Foundation has published a long report which provides a serious critique of projects in the Metrolinx Big Move plan and proposes significant alterations to the proposed network.  Everything is based on cost-effectiveness although the critique depends on implementation of the overall scheme rather than the usual piecemeal approach to network expansion.  Of particular note is the need to regard GO as a high frequency, high capacity regional system closely integrated with local transit.

There is too much in this report for me to comment on as I write this (midnight, December 11), but I will try to pull together more extensive remarks in the next day or so.  Meanwhile, coverage of this report will appear in the Wednesday Star, and this is likely to stir up several hornet’s nests.

A quick review indicates the following significant issues:

  • The Downtown Relief Line disappears and its “relief” function is provided by a combination of GO Transit upgrades and increased subway capacity.
  • The only service to Pearson Airport remains the Union Pearson Express which is considered to be profitable (operating cost recovery only) despite a conclusion to the contrary by the Provincial Auditor.  The wider question of this service’s ability to absorb greater demand and a wider variety of traffic is not examined beyond a proposal for a “frequent user” fare that would attract trips by airport workers, not just business class travellers.
  • Electrification of GO Transit is essential.
  • Fare and service integration with GO is an essential part of the proposal.
  • Several stations on the Eglinton Crosstown line would be dropped, and the proposed at grade section would become an elevated structure.  This takes us back to a version of the Eglinton line originally pushed by Metrolinx as a regional facility, and begs the question of transit service to the now wider “in between” locations that would lose their stations.
  • The Richmond Hill subway would also lose some of its stations pending contributions by developers along the line.
  • The Scarborough Subway, LRT and Sheppard LRT would be converted to one consolidated, automated line to attract more riders.

At first blush, I cannot help thinking that this report is hopelessly naive on a few counts.

First, it depends on a co-ordinated scale of network expansion we are unlikely to see, especially for the GO component which is used to justify dropping other parts of the Big Move network.

Second, there is a focus on cost-benefit that at first glance appears to preclude the function of new transit lines as part of a network.  A related issue is the question of marginal new ridership where a large expenditure to improve the quality of service for existing riders is given no credit for that benefit as they generate no net revenue.

Third, there appears to be no discussion nor appreciation of the role of local services for areas beyond the immediate reach of rapid transit stations.  This is very much a return to the kind of thinking that infected early days at Metrolinx.

I will leave further comments until I have a chance to read all of the details.

Future Demand on the Downtown Subway Network

Recent discussion about the Downtown Relief Line study and its Terms of Reference sent me back to the TTC’s Downtown Rapid Transit Expansion Study (DTRES) published last year for a look at the demand projections.

What I found there was rather troubling.

The TTC looked at three scenarios to model future shortfall in network capacity by 2031:

  • The existing TTC and GO networks
  • An enhanced “reference network” with improved subway and GO service
  • The reference network plus the Yonge extension north from Finch to Richmond Hill

The demand model outputs appear in three separate tables within that study, but it is not until we consolidate the information that some anomalies really jump out.

DTRES_Demand_Comparisons

There are four sets of numbers in this table with columns corresponding to the three model networks.

  • Capacity:  This gives the capacity of each route based on service levels and train lengths.
  • Inbound demand:  This is the modeled demand on the network.
  • V/C:  This is the ratio of demand to capacity.  A value near to or greater than 1.0 indicates that the line will be over capacity during at least part of the peak period.
  • Inbound deficiency:  Where the capacity is lower than the demand, this is the magnitude of the shortfall.

The capacity of the reference network is about 50% greater than the existing one.  Note that for the northern GO services, ten-car trains are assumed although 20% could be added to the capacity with 12-car trains on the same presumed schedules.  (The model also considered the east-west GO services and their effect in draining trips off of the BD subway that would otherwise contribute to demand south of Bloor Station.)

The modeled demand is also about 50% greater than the demand that the model assigns to the “existing” network configuration.  This shows the modeled effect of increased transit service on network demand.  However, this also begs the question of where those trips would be if the TTC and GO improvements did not take place.  An obvious useful addition to the discussion would be the added road trips, or the trips simply not taken because there was no network capacity to handle them.

The big surprise is that there is almost no difference between the total demand with or without the Richmond Hill extension.  Indeed, most changes are re-assignments of trips from GO lines and the University subway in the “reference” network to the Yonge subway in the “reference + YSE” network.

Route                    Without YSE     With YSE
University Subway           25,100        23,500
Yonge S of Bloor            35,800        39,400
Barrie GO                    7,500         7,400
Richmond Hill GO             2,500         2,200
Stouffville GO               8,600         8,000
Total                       79,500        80,500

Why would we spend billions of dollars building a subway to Richmond Hill to carry no more total riders on the network than we do without it?

There are two obvious responses to this question:

  • Some of the new trips have destinations at or north of Bloor Street and therefore they do not contribute to the count of riders into the core area.
  • In the model’s world, the subway extension does not attract any net new trips beyond what would occur simply with better service on the subway to Finch and enhanced GO services (i.e. with the reference network).

This is a rather strange situation considering that the holdup on building the Richmond Hill extension arose from the claim that it would overload the Yonge line.  However, in the model, it does this primarily by attracting trips that would otherwise have been on GO or on the extended University subway.

(At this point, I have to wonder whether a similar methodology produced the inflated ridership projections for the Scarborough Subway, but that is another matter.)

The model shows very low ridership on the Richmond Hill line.  Indeed, the greatest number of riders (2,900) is obtained with the “existing” network and the value falls even though GO service is improved in the “reference” and “reference + YSE” networks.  This implies that the model prefers to assign trips to the “faster” Yonge subway especially when it goes all the way north to Richmond Hill.

On the BD line, although an increased capacity is included in the model (about 27%), ridership only goes up in the section east of Yonge.  This implies either that demand from the west is static (difficult to believe) or that it is going somewhere else in the model.  Where?  Is growth assigned mainly to GO because it competes well with the subway for traffic in Mississauga while to the east Scarborough is poorly served by GO?

There is no question that Toronto needs more capacity into the core area, but the modeled numbers in the DTRES are suspect.  If anything, they may understate the problem and the potential benefits of alternatives to stuffing more riders onto the Yonge subway.

The TTC has a long history of downplaying the need for anything beyond Yonge subway capacity expansion (more trains, new signals, bigger stations) to the detriment of long-term planning for better GO service and new TTC subway or LRT services.  For many years, all we heard about from TTC was the need for a Richmond Hill subway.  Any other project was cold-shouldered because it threatened that favoured scheme.  Only when capacity problems could not be ignored did the TTC turn to the “DRL” as a possible solution.

Toronto has been ill-served by this blinkered planning, and coming studies on the future of the transit network (without regard to the paint scheme on the vehicles) must be based on a fair and accurate assessment of how new and improved services will contribute to moving passengers and limiting the growth of congestion in Toronto.

The Big U and the little u

The Transit Investment Strategy Advisory Panel has ventured off its supposed path of looking at ways to fund transit growth in the GTHA to at least one proposal for a change to the Metrolinx Big Move plan.  This showed up at recent open houses in a handout that is not yet available online.

InvPanelOfficeEmpAndTransit

[The image above was posted on Twitter by Rishi L (@CdnEnginerd).  Click for full size version.]

The purpose of this map is to show how office employment is not sited along existing or proposed rapid transit lines.  With this as a jumping off point, the Panel suggests there is a need for a “Big U”, a much enhanced GO Transit route from Meadowvale, through Union Station and then north via the Uxbridge Subdivision (Stouffville line) to Markham.

A related factoid (one of those handy bits of information whose presence is supposed to silence critics) is that employment concentrations generate far more transit usage than residential ones.  It is certainly true that it is much easier to serve a place like downtown Toronto with a transit network that acts like a big funnel, but this does not eliminate the need to serve the residential ends of those trips.

Toronto’s Bloor-Danforth subway and GO’s commuter lines, for example, spend much of their time running through comparatively low-density neighbourhoods, collecting passengers as walk-ins, park-and-rides, and transfers from the surface transit network.  Every time a new transit route is proposed, we hear how it will only be viable if stations are surrounded by huge condo developments.  This is utter nonsense because any transit route has a catchment area.  The problem is to ensure that transit, sidewalks and bike lanes serve that area and deliver riders to a network that will take them where they want to go.

What is missing from the chart above is any indication of where the people who work in those centres actually live.  Looking at the Meadowvale end of the line, how many people come from the area that would be served by the GO corridor and a feeder network to it?  There is a lot of territory north, west and south of Meadowvale for which a rapid transit line to the east will do absolutely nothing.  Similarly, many who work in Markham live west, north and east of the employment centres.  Indeed, most of the red dots on that map are well west of the rail corridor.

Much as I sympathize with the Panel’s desire to get people talking about how parts of any network proposal might actually serve the region, I fear that we are seeing a classic example of someone who got out their crayons and drew a map.  The job will quickly change from discussing the philosophy of transit planning (and, don’t forget, funding) to defending the specifics of a proposal.

That is precisely why I have been so restrained about getting out my own crayons except in special circumstances.  The recent Don Mills Subway discussion needed a line on a map to illustrate how the “downtown” focus needed to change.  Well over half of the debate this triggered became a matter of dueling proposals between “my” line and “your” line that added little to the real issue — the need to see what such a line could connect and serve beyond simply diverting trips away from Bloor-Yonge Station.

People would even argue that there wasn’t “enough” development in some locations to justify such a route ignoring what is there today, what is in the pipeline for tomorrow and what could occur with planning and political encouragement.  Meanwhile, we build a subway to land that was recently the middle of nowhere, and propose one through miles of low density residential development as a vote-buyer claiming that only with a subway will Scarborough reap the development it “deserves”.

There is one big problem with the “Big U” — it diverts attention from the “little u” otherwise known as the “Downtown Relief Line”.  It doesn’t help one bit that the version of the “little u” shown on the map is the Pape-Queen-Roncesvalles alignment, one that is guaranteed to be very expensive and fails to recognize shifting development patterns (ironically, one of the goals of the “Big U”).  It ignores the southerly shift of population and jobs, avoids the available Weston rail corridor where we are spending a fortune to intensify transit infrastructure for a Toonerville Trolley to the airport, and it stops at the Bloor-Danforth subway missing the opportunity to reach further north to be more than a “downtown” line.

“Alternatives analysis” is a fine art in many projects, but the real art for many agencies is to ensure that what you always wanted to build is the “preferred” choice.  This is often guaranteed by setting up straw man comparisons so that the one you want shines out as the best of breed.  Such may be the situation with the DRL where, on darker days, I suspect that the whole idea is to paint as grim a picture as possible so that it will never be built.  Remember that the TTC for decades claimed we didn’t need a DRL, that they could stuff everyone into an upgraded Yonge-University line.  Expanding YUS capacity on a heroic scale was their “preferred alternative”.

With the Big and little U’s, we risk being trapped into specifics of route designs that looked good on a napkin in a bar, but which need much more thorough discussion as to purpose and specifics.  They are good as starting points for discussion, but are most definitely not the final answer in their respective fields.  Moreover, they are not alternatives to each other, a point that is often lost as the political imperative says “build in the suburbs, not downtown”.

The Big Move and the Investment Strategy that supports it have one gaping hole.  Very little attention is paid to the role of or funding for the feeder network to a regional system.  Moreover, the plethora of lines on the map hides the fact that many of them will not have the most frequent service on the planet.  Not all “rapid transit” lines are created equal.  As a recent Metrolinx report noted, the growth in “rapid transit” recently has mainly been in “BRT Light” for which the infrastructure requirements are minimal along with the service levels.  Crowing about progress in bringing transit to the millions ignores the question of how attractive that transit will be and how people will connect from the trunk routes, such as they may be, to their homes, work and other destinations.

This will be an important issue for network design on both the Big and little U’s.  One would serve rail corridors and be totally dependent on local service to deliver riders from homes and to employment locations.  The other would serve established and growing neighbourhoods and would enjoy an existing, well-developed set of local transit services as feeders.  These are not trivial differences, but they show the problems that will arise if the study does not look beyond the edges of station platforms.

This is the real debate the Transit Panel should engage — does The Big Move really serve the market it claims to address?  How useful will it be in attracting trips out of cars and onto transit?  Can developers and owners of residential and employment properties expect a real improvement in travel to and from their developments, or will their value be strangled by poor access?  Underlying all this is the basic question of whether we are spending all of those billions in the “right” place and what benefit each component of the proposed network will achieve.  That speaks directly to the concept of spending wisely, not just for the sake of generating construction jobs and photo ops for the next generation of politicians.

Returning to the “little u”, there will be a motion before Council from Councillor Josh Matlow, seconded by Cllr. John Parker (also a member of the TTC Board), to accelerate work on the EA for a “Relief Subway Line”.  Moreover, it asks that Council confirm such a route as “Toronto’s next subway expansion priority”.  It will be intriguing to see how this motion fares amid the current circus at City Hall, the recent battle over the Scarborough Subway and a faction claiming that downtown “has enough subways” already.

If this proceeds, it will be vital that it not be hamstrung with narrow terms of reference that filter out options before they are even discussed.  A major shortcoming of the new “Transit Project Assessment” protocol is that there is no consideration of alternatives because the decision that something is a “good project” is already assumed.  Debating alternatives just gums up the works in what is supposed to be an expedited process, but actually winds up as an exercise in selling an already-determined choice.  This is precisely the criticism many had of Transit City that compounded the process with less than stellar detailed planning and “sales”.  (Moreover, once a project is approved, it can be amended beyond all recognition, even though the original design was the one that “justified” the project in the first place.)

There is no point in doing a study if the underlying desire at the political and staff level is to sell a “Big U” as a replacement for the “Relief” line, whatever we call it.  The terms of reference must ensure that all options are reviewed, including cross-jurisdictional issues such as repurposing the Weston corridor’s UPX trackage for rapid transit.  We must not prejudge the outcome by requiring one continuous line to serve both legs of the U/u, especially considering that in some variants both western legs run in the same corridor.

Will Toronto Council, Metrolinx and Queen’s Park embrace the need for a full study of these routes without prejudice toward any preconceived doodlings on maps?

Metrolinx Benefits Case Analysis for the Richmond Hill Subway

Metrolinx has published a study of the proposed subway extension to Richmond Hill updating a Benefits Case Analysis done in 2009.  The new report is dated May 2013, but it has only recently been publicly released.

Background information in the study gives an indication of the demand challenges facing the transit network in coming decades.  The study itself shows many of the shortcomings of Metrolinx analyses in the selective use of information and limited scope of alternatives comparison.

The study looks at four options for the Richmond Hill line:

  • A Base Case assuming substantial additions to existing subway capacity, leaving things as they are with buses serving the existing terminal at Finch Station.
  • Option 1: Full subway extension to Richmond Hill Centre close to the existing GO station.
  • Option 2: A two-stop subway extension to Steeles with buses serving the area beyond.
  • Option 2A: A Steeles subway extension accompanied by improved GO service on the Richmond Hill corridor.

Notable by its absence is an option of both a full subway line to Richmond Hill and improved GO service or any analysis of how demand would divide between the two routes.

The study notes that the Metrolinx Board, in response to earlier analyses, requested additional information:

  • Possible adjustments in project scope, timing or phasing;
  • Consideration of the extent to which improved service levels on the parallel GO Richmond Hill rail corridor off-loads some of the demand on the Yonge Street subway; and
  • The cost impacts of the various options on the subway yards strategy, Yonge-Bloor subway station improvements, and a future Downtown Relief Line to bypass the Yonge-Bloor congestion pinch point.  [Par. 1.12, page 3]

The 2013 report does not address these requests because it does not include any option where both the subway and improved GO service operate to Richmond Hill.  Although parallel studies (such as the TTC’s own subway yards needs analysis) do look at some aspects of the third point above, this information is not integrated into the analysis, nor is there any review of configurations that could avoid some of the cost of increased subway capacity.  This should follow in the Metrolinx study now underway of the Relief Line and associated alternatives, but that sort of network-based review is years overdue.

Continue reading

Another DRL Proposal or Just Another Gerrymander? (Update 2)

Updated August 2, 2013 at 6:00am:

André Sorensen has written a commentary in today’s Star expanding on his proposed use of the rail corridor for express airport service and a quasi Downtown Relief line.  I’m with him on a more intelligent use of the rail corridor, especially to the northwest of downtown, but not with the premise that this could replace the proposed subway from Don Mills & Eglinton to the core.

Continue reading

Metrolinx Board Meeting of June 27, 2013

The Metrolinx Board met on June 27 with a full agenda.

There is a great deal of duplication between various reports, and I have consolidated information to keep like items together.  Some reports are omitted entirely from this article either because the important info is included elsewhere, or because they simply rehash status updates with no real news.  Metrolinx has a love for “good news” to the point that each manager stuffs their presentations with information that is already well known, or which parallels other presentations.

Among the more important items in these reports are the following:

  • Metrolinx is now conducting various studies all of which bear on the problem of north-south capacity into downtown Toronto.  This involves the (Downtown) Relief Line, the north-south GO corridors and the Richmond Hill subway expansion.  A related study involves fare and service integration across the GTHA.  It is refreshing to see Metrolinx taking a network approach to planning, rather than looking at projects in isolation, and recognizing that some of their own, existing routes can be part of an overall approach to solving this capacity problem.
  • The Metrolinx Five-Year Strategy includes dates for the beginning of service on various projects including the LRT replacement for the Scarborough RT.  Previous versions of these dates cited “by 2020”, and Metrolinx has indicated a desire for as short a construction/shutdown period of under three years.  However, the new strategy paper talks of an “in service date” of 2020.  Metrolinx is aiming for a three year shutdown at most, but the SRT might continue operating beyond the originally planned September 2015 date, possibly for one additional year.  This could lead to an earlier reopening than 2020.  (Correspondence from Metrolinx on this issue is included later in the article.)

Continue reading

Sabre Rattling in Halton?

Earlier this week, Tess Kalinowski reported in The Star that Halton Region, a fast-growing region west of Toronto, would simply stop approving new developments without more provincial support for transit and other services.  Chair Gary Carr wants to see funding for transit – including two-way, all-day GO rail service – not to mention schools, roads and public health.

Halton’s population of half a million is planned to grow by 50% in the coming two decades as new residents pour into the Greater Toronto region, but the infrastructure to support them does not exist.  This problem is shared by other municipalities either because they face growth of their own, or because they lie between newer neighbourhoods and downtown and absorb increases in travel through older parts of the GTHA.

Metrolinx had originally slated all-day service for Halton on the Kitchener and Milton GO lines in the first 15 years of its 25-year Big Move transportation plan. But the plan’s updated version pushes the GO expansion to the list of projects in a 16- to 25-year window.

Besides more GO trains to Milton and Georgetown, Carr said the region wants Metrolinx to reinstate plans for another GO station on Trafalgar Rd. and it wants the Lakeshore West GO line electrified so it can deliver 15-minute express service.

Municipalities in the 905 now have (or are planned for) populations and the transportation demands they will create that exceed the capacity of road-oriented development.  Even if transit in the 905 (and commuting capacity for 905-to-416 travel) were much better, the land use patterns work against effective transit service.  This is not just a question of dispersed work and home locations, but of neighbourhood designs generally where stops to run errands as part of larger trips demand the use of a car.  These problems will not be wished away with better bus routes or all-day GO service.

Halton, like many regions, is reacting to proposed new region-wide “revenue tools” with the question “what’s in it for us”, but this is a natural result of the “Big Gap” between the original promise of Metrolinx (and of provincial plans for managing GTHA growth) and what is actually happening on the ground.

Various plans exist for the expansion of GO Transit service, and these have changed from time to time leaving some confusion about what, exactly, will be provided and when service expansions will occur.

Continue reading

The Metrolinx “Big Conversation”: What are The People Saying?

Through early 2013, Metrolinx conducted roundtables across the GTHA to sound out interested citizens on the transportation plan, “The Big Move”, and on possible ways that this might be funded.  A summary report consolidating the input from each area makes interesting reading.

“Consistent, top-line themes” are identified right at the outset:

Participants across the region feel frustrated with the level of congestion they face on highways, roads and public transit. They feel the negative impact of gridlock on family life, work obligations and health. The inadequacy of existing public transit systems is a common concern for participants. GTHA participants agree that across the region – along its busiest routes – our roads, highways, subways, trains and buses are straining to meet demand.

The need for reliable and frequent service was heard consistently across the GTHA. Participants are looking for leadership among transit providers to collaborate and deliver improved levels of service that is better integrated across the region. Participants look forward to system improvements that will allow them to more easily coordinate their schedules, enjoy a wider range of transit options with less uncertainty and stress, and travel more efficiently and cost-effectively from A to B. [page 3]

A few points leap out here:

  • “Public transit” is a generic problem, not a “GO” or “TTC” or “HSR” issue, and there is no call for a few “magic bullet” solutions.
  • Frequency and reliability rank highly, and would-be riders want to see better co-ordination and service delivery.
  • Efficient and cost-effective travel are important.

A subtle but important linking factor here is that delivering on these issues requires a network approach, and high quality operations are at least as important as building new infrastructure. Continue reading