29/929 Dufferin Analysis: 2024 to 2026 (Part II: Headways)

This is the second of two articles reviewing the service on the local and express buses on 29/929 Dufferin. In Part I, I reviewed the evolution of travel times both on the route south of Bloor which acquired reserved “red lanes” in 2026, and on the longer northern portion from Bloor to Wilson. This article looks at headways (the space between buses) over the same period and at the same locations.

In brief:

  • The variation in headways over a wide range has persisted more-or-less unchanged for the past three years on both the local and express services.
  • A slight improvement occurred in mid-2026, but this is likely due to increased line management during the World Cup and its aftermath rather than to the red lanes. This improvement, a narrowed spread of headways with less erratic service, only applied to part of the route, and disappeared in September.
  • Service leaves both terminals on erratic headways that exceed the official Service Standards which are generous. Similarly, mid-route headways routinely exceed the core standards which have a target of only 60% success rate leaving 40% of the service to fend for itself..

There is no question that a route like Dufferin is not easy to manage even under ideal conditions. However, looking at the data, there is a sense that little is being done to address service quality on this major corridor.

There are a lot of charts in this article. Apologies to readers who prefer less detail, but I am including them so that those who want a deep dive have the material available.

Continue reading →

29/929 Dufferin Analysis: 2024 to 2026 (Part I: Travel Times)

The 29/929 Dufferin local and express bus services are the subject of many rider complaints about irregularity and crowding. In 2025-26, priority “red lanes” were installed on the south end of the route in two stages:

  • November-December 2025: King to Dundas
  • April-May 2026: Dundas to Bloor

Parking was removed from both sides of Dufferin with the expectation of substantial improvement in bus travel times and service reliability.

Project details are on the City’s RapidTO web page for Dufferin.

This article reviews travel time data for the 29/929 services for the period from January 2024 to October 2026. Vehicle tracking information is from the TTC’s Vision management system. Interested readers can find descriptions of the methodology and charts in the “Reference Material” section of this site. Brief explanations are included in this article.

In summary:

  • Travel time savings between King and Bloor are almost entirely in the northbound direction, and only during certain times of the day. Another way of looking at this is that some periods were not congested before the red lanes went in, and so the lanes had less or no impact.
  • Some of the benefit seen in summer 2026 might have been due to seasonal effects rather than the red lanes. Travel times dropped in the Summer, but rose again in the Fall. Further review will be necessary in the Winter when road capacity is typically reduced, especially by the City’s half-hearted approach to snow removal.
  • Beyond the red lane area, from Bloor to Wilson, there are considerable swings in travel times, much greater than south of Bloor. This implies that more road capacity dedicated to transit could produce greater benefits in these areas, provided it can be achieved. Where there is already severe congestion, any proposal to remove road space from use by cars will meet considerable resistance.
  • A major problem on Dufferin is erratic headways with bunching and gaps. The red lanes did little to improve this problem because service was already irregular leaving the southern terminal and entering the red lane territory from the north. (Headway data will be reviewed in Part II of this article.) This is compounded by …
  • The range of travel times is similar to the scheduled headway, and this will affect service reliability.
  • The difference in travel time between local and express buses over the full route is modest, less so for a trip that only covers part of the route. Irregular headways can undo the benefits of the faster travel times.