A Small Fix for Page-to-Page Links

Page-to-Page Links: 

Some of you may have noticed that if you tried to follow links to “previous” pages, you were dropped into a message telling you that it didn’t work, and to go to the main page again.

Without going into the details, this was related to security hooks added to this site.  Unfortunately, those hooks sideswiped another piece of code.  This has been fixed.

For those of you who get messages saying that your address has been listed by Spamhaus:

This is an inevitable problem with the fact that people (like me) who have high speed access but don’t stay camped on or have a permanent IP address will occasionally inherit an address that someone else used for spam.  I have found that simply recycling my DSL modem to pick up a new IP address gets around this problem.

A Visit to Fleet Street

Monday afternoon, I took advantage of the balmy Thanksgiving weather to look at the state of Fleet Street, an oxymoron if ever there were one in its current state.  The construction is working its way east from Exhibition Loop, and is currently at the Strachan intersection where the coming realignment of the tracks is already visible.  From here east, the street is a mess, pedestrians are walking along the roadway because the sidewalks are torn up, and the former brewery site is now a vast and empty lot awaiting more condos.

All of this doesn’t warrant a post, but two observations do.

First, despite the fact that the 509 Shuttle only has to run back and forth from Spadina to the Princes’ Gates, there are three buses on this service, and two of them were running almost as a pair.  I was one of a handful of people on the trip east from the CNE, and I didn’t see many on the other two buses either.  Isn’t it amazing how the TTC can run such frequent, if erratic, service for construction replacement, but when it comes to basic everyday service, well, you know the rest.

Second, I saw the best example of a transit priority signal in Toronto.  Eastbound at Strachan and Fleet, there is a signal to let the streetcars out of Exhibition Loop.  Despite the physical impossibility of any streetcar actually appearing here for several months, the light dutifully cycles through its “transit” phase.  Clearly, the presence or absence of a streetcar has nothing to do with this “pro transit signal”, and it is simply one phase in a multi-phase progression.  That’s what I see elsewhere and indeed it’s the sort of thing that is actually “anti-transit” because streetcars must wait for their own phase rather than using the regular green time that had been available to them for decades.

The TTC and the Works Department need to start being honest about which signals are true “transit priority” and which are rather expensive decorations whose main effect is to keep streetcars out of the way of other traffic.  There is supposed to be a report on this subject coming to the TTC, maybe even at its October meeting.  Stay tuned. 

The 507 Lives, Sort Of

I have written before about the need to reorganize the way service is operated on the Queen line, and the TTC never quite gets around to doing a detailed review.  I’m not sure what it will take to light a fire under them, but the time is long overdue for them to admit the through-routing of 501-Queen and 507-Long Branch was a disaster.

Other related issues include the problem of Humber Loop (not the most ideal location for a transfer given its isolated location) and the mix of services running downtown from Parkdale.

I received a comment from “Ed” recently that shows finally, someone has realized there are problems on Lake Shore, although the “fix” is a temporary one. Continue reading

St. Clair Construction Begins / Local Unrest Continues

Chris W. sent in the following comment:

Hooray!  The St. Clair Transit website was updated today!  There is a new, very informative flyer.

Highlights:

  • Phase 2 (Westmount to McRoberts) to start October 15 and continue into the spring.
  • Vaughan Road to Westmount Avenue to start next spring.
  • Caledonia to Gun’s loop to start late next summer.
  • Shelter installation on Phase 1 to start early October 2007!
  • Later this fall streetcars will returns from Yonge to Oakwood loop, initially running straight through St. Clair West Station.
  • Streetcars will be removed in spring 2008 “With other TTC work occurring on Bathurst Street “. Could this mean the tracks from Bloor to St. Clair will be replaced next year instead of 2009?

If this all comes to pass someone should throw a party.

Yes, I believe that Bathurst from St. Clair down to Bathurst Station is supposed to be rebuilt in 2008. Continue reading

Toronto Tree Portraits