SmartTrack: Now You See It, Now You Don’t!

Oliver Moore in the Globe and Mail reports that there have been major changes to the SmartTrack plan, to wit:

  • The western branch of the service to the Airport district will be provided by the western extension of the Eglinton-Crosstown LRT as originally proposed.
  • “SmartTrack” per se will operate as a heavy rail service overlaid on GO Transit with the initial phase running from Mount Dennis to Kennedy Stations.
  • The northern extension of “SmartTrack” to Markham will be a separate phase of the project.

The map from the Globe & Mail is reproduced below.

GlobeSTLRTMap_20160114

According to Moore, the cost of adding SmartTrack to GO under this configuration would be much, much less than the originally quoted figure for the entire line. In turn, this would free up substantial capital spending headroom in City plans for other projects.

SmartTrack service at 15 minutes (the level proposed in Tory’s campaign) is far too infrequent to attract much riding, and especially to make a dent in demand on the existing subway interchange at Bloor-Yonge. We saw this in the June 2015 Metrolinx demand projections that were far more favourable to a Relief Line operating north to Sheppard and Don Mills. However, getting SmartTrack service down to as close a headway as every 5 minutes will be challenging for Metrolinx and for the corridors through which this would operate. There are no details yet on how this would be achieved.

The Eglinton West LRT has always been the superior way of serving this corridor compared to the heavy rail SmartTrack scheme. ST foundered on major problems with constructibility and neighbourhood effects, issues that were dismissed in a stunning display of cavalier “expert” knowledge during the campaign. Planning by Google Maps from an office in the UK has its limitations, but Tory’s campaign relied on this “expertise”. One shameless professor even rated ST with an “A+” in the CBC Metro Morning interview.

Keeping the first phase of ST confined south of Eglinton on both branches limits the operating costs the City must bear if this to be truly a “Toronto” project with “Toronto” fares, and it avoids the complexities of building into the 905.

Indeed, SmartTrack began as a real estate development scheme to make commercial property near the Airport and in Markham more accessible from downtown in a series of studies that actually claimed the market for downtown office space was static and falling. Yet another expert should be eating crow pie from his perch on the Metrolinx board. It was never clear why Toronto should shell out billions to improve property values in the 905, and this task now falls clearly to Metrolinx where it belongs.

The eastern leg of SmartTrack, north from Kennedy, obviously competes with the Scarborough Subway Extension, and there is no need for two routes serving the same demand, especially when GO already plans substantially improved service in the rail corridor. The long-standing issue of SSE demand may be clarified by the absence of SmartTrack as a competing service.

It is no secret that my own position would be to revert to the LRT plan in Scarborough, but that train has probably left the station, especially if the City can “save” a small fortune by scaling back on SmartTrack.

These changes could also foreshadow a revised schedule for the LRT projects at a time when “shovel ready” projects are in demand to soak up new federal spending. Eglinton West’s LRT extension is relatively easy to build, and it could be started soon enough to complete concurrently with the main Crosstown route. There is also the matter of the Sheppard East LRT including its proposed service linking to UofT Scarborough campus.

Coming weeks may bring many sputtering denials, or possibly, much improved clarity and acceptance of an – at last – realistic plan.

 

 

Eglinton Crosstown Station Names Settled At Last

After an extended discussion at its December 2015 Board Meeting, Metrolinx has decided on names for three stations on The Crosstown that were in dispute.

  • The station at Dufferin will be called “Fairbank”, as originally proposed, after the name of the original community.
  • The station at Bathurst will be called “Forest Hill”, as originally proposed. Although outside of the traditional centre of this community, the Bathurst/Eglinton intersection does lie on the edge of the borders of the original village.
  • The station at Lebovic/Hakimi will be called “Hakimi Lebovic” to recognize that the street changes name as it crosses Eglinton. Originally this was to be “Lebovic” station after the older and longer street of the two, and then the TTC Board, egged on by member Glenn De Baeremaeker, changed the name to “Hakimi” (the location isn’t even in his ward). Metrolinx adopted a “Solomon-like” decision to use a double name.

The Board held a teleconference meeting to discuss one item, the staff report on proposed names. The report proposed staying with the single name “Hakimi”, but this idea did not survive long in the rather short debate. Director Janet Ecker proposed “Hakimi-Lebovic” saying that this preserved some of “the integrity of the process”, but Director Bonnie Patterson wondered why this had not  been the original proposal.

The problem turns on the matter of a hyphen, and such punctuation offends the Metrolinx naming standards. The question of great import: to hyphenate or not to hyphenate? One director pointed out that the hyphen could indicate a link between the two families (as in a compound name), and this tipped the decision against the hyphen.

On a related note, all stations whose names are not already those of intersecting streets will get a subtitle, much as the stations on University Avenue have today, to identify the intersection they serve. Chair Rob Prichard suggested that people unfamiliar with their location could look at the signs on station walls to get the supplementary name, but subway riders will quickly tell you that this is not always possible depending on where a train stops and whether one can even see out of the window. There is also the basic question of access for those who cannot see easily or at all.

The entire exercise has the feel of massive face-saving for Metrolinx staff and the station naming protocols developed with much fanfare. The double name was described by Chief Planning Officer Leslie Woo as being in a grey zone, on the edge of the protocols. This is just plain silly. Many stations will have names that do not match the intersection they serve, and locations with different street names on opposite sides of a line are common (there are at least four on the Finch West LRT alone).

The protocols should be amended so that:

  • Double street names are allowed as station names where appropriate and where another option, such as a major nearby landmark or neighbourhood name, is not available.
  • Station “subtitles” should always be used to clarify a station’s location at a major cross street.

These “protocols” were not engraved in stone and they do not warrant worship as if they are immutable. Two basic issues were missed in creating them, and Metrolinx should be honest and humble enough to address this. “Nevermore” is not the correct answer in this circumstance.

Meanwhile, on a related topic, the actual name of the Eglinton-Crosstown name is still in debate given that the TTC has moved to line numbering. Will it become “Line 5”, or will someone complain that Toronto has scoffed all of the “premium” numbers for its rapid transit routes on a regional basis? At least GO Transit uses letters rather than numbers, and we can avoid a prolonged debate about who gets to use “Line 1”.

Such are the weighty matters that burden transit planners and politicians.

TTC Fleet Plans 2016

This is the first article in a series reviewing the details of the TTC’s 2016-2025 Capital Plan. The topic here is the plan for the TTC’s three “conventional service” fleets: subway cars, streetcars and buses.

The Capital Plan provides for two types of spending: vehicle acquisition and major overhauls. No transit vehicle lasts until its design life without overhauls, and these are a substantial portion of the annual budget

The fleet plans for each mode are summarized in the charts linked from each section of the article. The information in them has been adapted from the TTC’s Capital Plan “Blue Books” which contain details on every project. In some cases, the numbers have been reformatted for clarity, and information has been consolidated from multiple charts.

Continue reading

TTC 2016 Budget Update

On January 8, 2016, TTC management presented an overview of the operating and capital budgets at the City of Toronto Budget Committee. The presentation slide deck and video are available on the City’s website.

The format of the presentation is, in part, dictated by a standard city template used by all divisions and agencies for consistency. Much of this material has been covered from previous meetings, and so this article will only touch on some clarifications and highlights.

Continue reading

Does More Running Time Improve Service?

[This is a long article, and I won’t hold it against anyone for failing to read all the way to the end, or not looking at every page of every chart. The issue here is a system-wide one of how service is scheduled and managed using routes where the TTC is attempting to improve operations as a reference.]

At the TTC Board Meeting of December 2015, Chief Service Officer Richard Leary gave a presentation “Performance Based Service” outlining the work done to date to improve the reliability of surface routes. [A YouTube video of the presentation is also available.]

The focus of changes made to several schedules has been that end-to-end running times should reflect actual on-street conditions rather than presenting drivers with an unattainable goal that cannot be met during typical conditions, let alone anything unusual such as poor weather or unusually bad traffic congestion.

The changes to date are summarized in the table below.

201512_Leary_AddedRTT

In some cases, the extra running time is provided simply by widening the headway. For example, if a route takes one hour, and it has a bus every 10 minutes, that’s six buses. Extending the headway to 11 minutes would change the round trip to 66 minutes with no added cost. In theory, if this allows vehicles to stay on time, better service might actually be provided because all buses would show up as planned. That, however, depends on them being properly spaced so that their capacity is evenly used.

In other cases, where the problem is not just scheduled time but also capacity, more vehicles can be added. In the example above, a seventh bus would allow the headway to stay at 10 minutes while the trip time went up to 70. With the long-standing problems of a constrained fleet, this is only possible in off-peak periods, or by raiding other routes for vehicles.

Continue reading

NextBus Next to Useless After Major Schedule Changes

Updated January 5, 2016: New schedules have been installed at NextBus and the service on affected routes should now appear correctly.

On January 3, 2016, the TTC implemented major changes in the schedules on 501 Queen and 510 Spadina, as well as minor changes to 509 Harbourfront and 511 Bathurst. Since then, NextBus information has been wildly erratic for these routes.

There are a few underlying problems of which I am aware from past experience like this, and there are likely more, but it’s worth consolidating this information in an article.

First, it is important to understand the basics of how NextBus works:

  • TTC vehicle location information is collected by their monitoring system which polls each bus and streetcar every 20 seconds to obtain GPS readings. These are consolidated into an updated feed that is available to NextBus, but not to the general public.
  • There are two extracts of schedule data that provide the “in theory” version of service for external agencies/applications:
    • A GTFS (General Transit Feed Specification) data feed available through the City of Toronto’s Open Data site
    • A NextBus-specific feed that is not public
  • NextBus uses the real-time data plus the schedule to produce maps showing all vehicles on a route, plus predictions of arrivals at stops. The predictions are based on historical tracking of vehicles and their likely running times, not on scheduled values, except at termini where a vehicle is expected to leave on its scheduled time.
  • Downstream stops from terminals show predicted arrivals based on the schedule until a vehicle leaves the terminal. This can cause errors in predictions because the schedule and real world might differ. Conversely, predictions based on actual travel times will correct for cases where the schedule is unrealistic provided that a vehicle is actually enroute to the stop. This is a “Catch 22” situation.
  • Predictions and displays (e.g. on video displays at stations) can run “late” to the real world for a variety of reasons related to latency in updating the data at each step along the way. If the “real-time” location feed is slow getting from TTC to NextBus, then vehicle positions will not reflect the world “now”, but some time ago. If the station/stop displays do not refresh their information frequently, they will show stale predictions.
  • NextBus only displays vehicles whose “run number” (the reference number assigned by the TTC to each vehicle) is actually in the schedule. When schedules change, an entirely new set of run numbers might be in use, or there could be some overlap with the old schedule. This can cause only partial service to be tracked/predicted because some vehicles are not linked to a run number that is in the schedule NextBus is using. Problems arise either if the new schedule is not imported to NextBus, or if the data exported from the TTC is in error.

All of the apps that run on various platforms use the NextBus feed. They may present this information in different ways, but all are limited to whatever NextBus puts out because that is the only feed available.

As I write this, there is an additional problem with the NextBus display for Queen which is hinted at by the snapshot below.

20160104_Rte501_0515

Note that all of the cars show with the arrow pointing west. If you watch the animated version, some of these cars are actually moving east. Predictions are wildly inaccurate because NextBus does not seem to “know” that eastbound cars actually are eastbound. (This snapshot was taken at 5:15 am.)

The problem changed somewhat later (5:56 am) when a few “eastbound” cars did show up in the display, and in downstream predictions. However, the predictions are still wrong because they only include cars NextBus is tracking, not all service on the route.

20160104_Rte501_0556

For example, NextBus claims there will be two cars eastbound at Bathurst in 18 minutes (they are both at Humber Loop eastbound), and the next one 53 minutes hence.

It is a bit early in the day for examples, but there will likely be cars missing from displays and predictions for 510 Spadina (which has a completely revised schedule for Flexity operation), on 509 Harbourfront and 511 Bathurst (which have been revised to terminate at Fleet Loop due to construction).

Updated: The problem with vehicle direction tracking also appears to have affected 505 Dundas.

The schedule data [this link returns a large XML file] NextBus is using for 501 Queen is from December 2015 when all service operated from Long Branch to Neville rather than with a route split at Humber. (For those who are interested, search on the string “scheduleClass” to locate the start of each block of schedules available.) The situation is the same for other routes.

This type of foul-up between TTC and NextBus has occurred before and at times has taken weeks to resolve making the “service” NextBus provides of poor quality, to be as generous as possible. The problems may lie at TTC or they may be at NextBus or some combination of the two, but they are problems that should be fixed. At the very least, some basic testing should occur at the TTC’s end when there is a change to ensure that the updated schedules have been installed. If I can do this with a simple XML call to the NextBus site, then so can anyone at the TTC.

Problems have arisen in the past where the TTC’s schedule extract for NextBus does not contain complete or correct data. This will only show up with actual use, but some sort of internal quality control on the content of the extract should be possible, especially for a major change such as the restructuring of a route.

This has been an ongoing problem, and it says a lot about the TTC’s alleged commitment to “Customer Service” that it has not been fixed.

501 Queen Service Design Effective January 3, 2016

The TTC has now split the 501 Queen route at Humber Loop on a temporary basis to allow concentration of the larger “ALRV” streetcars (the two-section articulated cars) on the main part of the route east of Humber, while “CLRV”s (the standard one-section cars) provide service from Humber to Long Branch on a more frequent service than before.

The “507 Long Branch” route is back in everything but name except for late evenings when some cars from Neville run through to Long Branch.

Service between Humber and Long Branch Loops is provided by a dedicated fleet of five or six cars operating at a 10 minute headway until mid-evening every day. Early evening service is provided by five cars on all days.

Starting at about 10:00 pm, some of the service west of Humber is provided by through trips originating at Neville Loop. Three cars remain on a Long Branch to Humber service with generous recovery times to make the integrated 9 minute headway work properly. It will be interesting to see how well managed these cars are (or not) and whether they actually split the gap between cars to and from Neville, or run close behind them. If the latter, then the advertised “ten minute headway” on Lakeshore will fall apart late in the evening.

Eastbound from Humber, there will be a mix of cars from Long Branch as well as Queen service scheduled to turn back at Humber. This is, in effect, the current schedule with every other inbound car originating from the two terminals. Again, an essential part of service reliability will be that these cars leave on the scheduled 9 minute spacing, not with a pair every 18 minutes.

The service transitions occur at different times depending on the location and direction of travel:

  • First car from Neville destined for Long Branch: About 9:00 pm
  • First car from Yonge destined for Long Branch: About 9:30 pm
  • First car from Long Branch destined for Neville: About 10:40 pm

During the late evening, service at Humber will be provided on two separate platforms for each direction:

  • From roughly 11 pm and 1 am, eastbound service from Humber Loop will be provided by a mix of cars originating from Long Branch, and cars from Neville terminating at Humber. These use different platforms because of the track layout. It is not yet clear whether the cars from Neville will load on the outbound track (as they did 20 years ago) or on the poorly paved area beside the inbound track.
  • From roughly 10 pm to 2:40 am, westbound service from Humber Loop will be provided with some service on the “Long Branch” side of the loop and some on the “Humber” side outbound. For some reason, the TTC has scheduled the last outbound car, weekdays, on the Long Branch side at exactly the same time as a car on the Humber side, so that there is a scheduled pair of cars westbound to Long Branch. The weekend schedules work better.

Some of the information on the published schedules for the new service is wrong in that some running-in trips to carhouses are mis-identified, and Long Branch trips do not appear on westbound timetables for the east end of the line implying considerably worse service than is actually scheduled. The complete schedules are accurately available in the TTC’s Open Data feed, but making sense of this requires some scripting to assemble the raw information into a comprehensible format.

Concurrently with these changes, running time increases are provided over much of the route to improve schedule performance. The table below shows a few of the changes as examples.

Neville to Humber Round Trip    Travel   Recovery   Total
                                 Time      Time
Weekday Midday
December 2015                    136'       12'      148'
January 2016                     158'        7'      165'

Saturday Afternoon
December 2015                    136'       14'      150'
January 2016                     172'       10'      182'

Sunday Afternoon
December 2015                    126'        6'      132'
January 2016                     164'        7'      171'

How well the service will operate under the new schedules will depend a great deal on line management. It is one thing to stay “on time” and quite another to maintain spacing, especially where services merge as at Humber Loop. In theory, being “on time” should ensure this, but the TTC’s interpretation of that phrase has enough leeway to accept very erratic service as “on time”.

Meanwhile, thanks to a technical foul-up with the schedule feed to NextBus (which might be either at the TTC or NextBus end), vehicle position displays and arrival time projections on this route are totally unreliable as of the launch date, January 3. None of the service west of Humber, and much of the service east of there is missing. This makes tracking of line performance by observers, let alone use of NextBus by riders, impossible. (Displays for other routes with new schedules, notably 510 Spadina, are also affected.)

TTC Transfers: 1954/55

Transfers as a physical fare medium are set to disappear from the TTC in 2017 with the completion of the migration to Presto fare cards.

Here are the transfers as they existed in 1954 and 1955, the first year of the “Toronto Transit Commission” by that name. These include many suburban bus routes that were amalgamated into the TTC’s network with the formation of Metropolitan Toronto in 1954.

A few items worth noting:

  • Many of the suburban routes used red ink on white paper as a distinct colour scheme to identify cases where a check for a “zone 1” fare on a city route would be necessary. When coloured paper was abandoned for the older routes, Carlton was already using the “suburban” colour scheme and was missed in the conversion. For many years, it was the only “downtown” route with a red transfer.
  • There are two Yonge transfers. One is for the “Yonge T.C.”, the trolley coach operation from Eglinton to Glen Echo. The other, simply “Yonge” might suggest that the streetcars were still operating in 1955 over a year after the subway opened. This is for the night service.
  • Many route names are recognizable, but the outer ends of the suburban routes are a lot closer to the old city than they are today.
  • The text on the back of the transfer exhorting riders to only make their connections in the proper TTC way has not changed in years (it can be found on transfers from 1921). The use of the word “Conductor” is amusing considering that by 1955 two-man operation had ended. The term even appears on bus transfers.
  • “Up” and “Down” refer to directions of travel and correspond to the “U” and “D” cutoffs along the edge of the transfer. Generally, “Up” is westbound or northbound, but there are exceptions sometimes caused by route changes and amalgamations with segments in the “wrong” direction.

For a look at pre-TTC transfers, please refer to this article.

TTC Budgets for 2016: City Analyst Preliminary Notes

As the budget cycle begins, analysts from the City’s Finance Division publish reviews of the budgets submitted by every department and agency. These will eventually show up on the City’s general “budget” website, but most of them are now part of the agenda for the Budget Committee’s meeting of January 5, 2016. This article reviews the notes for the TTC’s Operating and Capital budgets.

All illustrations within this article are clickable for a larger version.

Operating Budget

The notes begin with an overview of the “conventional” and “Wheel-Trans” budgets:

PrelimANotes_OpsSummary

This chart shows how the total budget, fares and subsidies interact. Although the gross expenditure for the conventional system goes up 2.5%, the subsidy goes up by 4.5% because revenues do not keep pace. There is always a tug of war between providing more service to handle both growth and political promises, while keeping fares down, again for political reasons. Council can hardly complain that the subsidy grows well above the inflation rate under these circumstances.

For Wheel-Trans, the growth of the subsidy is dictated almost entirely by the growth in costs because so little farebox revenue comes from that service. Ridership is growing thanks to eligibility changes and increased service, while fares grow by only a small amount.

On the conventional system, ridership has not been growing at the expected rate not just in 2015 but for a few years previous. The routine claim from TTC is that this is due to bad weather in early 2015, but this does not explain the ongoing shortfall in previous years, nor the fact that ridership continues to run below budget into the fall of 2015 when the weather, if anything, has been quite balmy.

PrelimANotes_OpsRidership

Since 2013, actual ridership has been below budget, and the 552-million figure for 2016 shown here will be a challenging target to meet.

The TTC is funded primarily by fares, with much of the remainder coming from subsidies.

PrelimANotes_OpsSourceOfFunds

This chart is actually in error in that Property Tax does not supply all of the $495.2-million shown here. The City also receives Provincial Gas Tax revenue of about $160m of which $90m is dedicated to the Operating Budget where it appears as part of the City subsidy. (No Provincial subsidy is directed to Wheel-Trans.)

An outstanding issue for the City is that the TTC does not have “Service Standards” for its departments. These should not be confused with the standards applied to service design (crowding, maximum headways, etc.). These values the City seeks relate to departmental performance, and it is difficult to say just how meaningful such standards would be and how closely they would relate to the actual “service” the organization provides to riders.

The Preliminary Budget included here is not the same as the TTC’s version because it omits $18.4-million in various TTC-approved improvements for 2016.

PrelimANotes_OpsServiceImprovements

Note that “Earlier Sunday Transit Service” applies to the surface network, primarily bus lines, where many routes do not now begin service until 9:00 am. Although earlier rapid transit service on all routes will begin at about 8:00 am effective January 3, 2016, the feeder surface routes will not see earlier service until later in 2016, and assuming that this budget line is approved at Council (or the TTC takes some other action to fund the service without affecting the subsidy level).

The POP Fare Inspection is a particularly amusing item because Proof of Payment and All Door Boarding were implemented with great fanfare by the TTC on its streetcar system quite recently. However, Council might well not approve funding of the Fare Inspectors the TTC requires.

Operations in 2017-18

Future years’ operations pose a challenge for the TTC and City beyond the usual pressures of inflation and ridership growth. These include:

  • Garage leasing: To accommodate a “hump” in total bus fleet requirements that will last until new rapid transit lines replace bus services in the early 2020s, the TTC will lease a “temporary” garage at an annual cost of $25-million starting with the 2017 budget. This is a net new operating cost to which must also be added the cost of staffing and maintaining the new garage.
  • Presto fare card: The cost in fare handling fees to the TTC from Presto is estimated to grow to over $50m in 2017. The TTC has not yet identified offsetting savings from the reduced scope of existing fare collection systems. The Analyst notes recommend that Council require the TTC to report to Executive Committee by June 2016 on the savings that will be used to offset Presto costs.
  • Wheel-Trans costs are projected to rise at well above inflation due to demographic changes and increased eligibility.
  • The additional cost of operating the subway system once the TYSSE opens to Vaughan (net of new revenue) is projected to be $11m in 2017 (startup and commissioning) and a further $20m in 2018 for an annual added cost of $31m.
  • Further “significant funding increases” will be required for operation of the LRT lines and the Scarborough Subway, and there is “currently no funding strategy in place” to address them.

Another way of looking at this is that before Toronto even manages to spend any new money it might find to support improve transit service, it must deal with a backlog of unavoidable demands on the operating budget.

Capital Budget

The Ten Year Capital Plan for 2016-25 includes just over $6-billion in proposed spending. As discussed in a previous article, this is nowhere near the total of the TTC’s capital needs, but stays within the City’s “affordability” target.

The budget is subdivided by type of work with “State of Good Repair” consuming the lion’s share. Assignment of some projects to these categories can be misleading because some projects address more than one area. For example, a project to increase subway car storage capacity for the TR trains is booked as “SOGR” although, in part, this is a cost related to system expansion. Similarly, part of new fleet costs are related to replacement of old vehicles, and some to system growth. By contrast, the cost of McNicoll Garage is divided equally between “SOGR” and growth [see p2 for details], while Presto costs related to new fare gates are booked against “growth” when they are really “SOGR” and “legislated” because they address accessibility at automated subway entrances.

PrelimANotes_CapSpendingBreakdown

Over 75% of the funding for this plan comes from Provincial and Federal subsidies, and from City debt or capital-from-current spending. Of the subsidy moneys, only about $230m ($160m from Ottawa and $70m from Ontario) comes from Gas Tax and is not tied to any specific project. On a long-range basis, the subsidy will fall based on current commitments placing great pressure on the City’s own ability to raise capital.

Development Charges are mentioned from time to time as a funding source, but as they now provide less than 10% of the total (and that for an underfunded plan), the ability of DCs to offset much of the shortfall is limited.

“Other Revenue” is primarily money from Waterfront Toronto’s budget for projects that they are funding such as the Queens Quay rebuild and Union Station second platform.

PrelimANotes_CapSourceOfFunds

There remains almost $3-billion in projects that the TTC has approved in principle, but for which there is no funding, and another $5.5b worth of projects that have not even made it into the 10-year plan.

Some Capital spending planned for 2015 has moved into future years, and 2016 now has the peak spending rate.

PrelimANotes_CapChangeFrom2015

There is a steep decline after completion of the TYSSE (Spadina extension), the Yonge-University resignalling, and the new streetcar procurement projects. These have subsidy funding from one or both senior governments, and the spending rate beyond 2019 reflects the City’s own ability to fund ongoing capital needs. (Metrolinx projects such as the Crosstown LRT do not appear on the TTC’s books.)

Among projects that have fallen “below the line” to unfunded status are:

  • Bus heavy rebuild program
  • Bus replacement program

Projects with increased funding include:

  • Easier Access Program: full accessibility to subway stations is now funded for completion by 2024. This project was formerly “below the line”.
  • Subway car overhaul
  • “Finishes” which includes roof rehabilitation and station modernization costs.

Spending of less than $400m/year cannot sustain a $9b 10-year plan.

The constrained rate of capital spending brings a growing backlog of unfunded “SOGR” work. Such a backlog cannot be allowed to accumulate forever, and one must wonder what sort of catastrophe will be required to wake up City Council and other potential funders analogous to the Russell Hill subway disaster in 1995. With all the claims that the TTC is focussed on an improved experience for its riders, taking pride in restoring the system to its former premier status, the underfunding is an uncomfortable reminder of what has happened before.

PrelimANotes_CapBelowTheLine

The replacement of the T1 subway car fleet (which operates on the BD line) first appears in 2018 with early contract payments. The Analyst notes that the T1s will be reaching the end of their life in 2025. This timing is also related to the resignalling of the BD line and conversion to Automatic Train Control which the T1s cannot use, and the existing signals cannot be decommissioned until the T1 fleet is retired.

A program to overhaul Hybrid Buses in 2019-25 has been moved below the line. The TTC has already planned to retire the oldest of its Hybrids rather than trying to keep them in operation, but treating maintenance of those remaining in service as unfunded begs the question of which buses will be available to provide service when these fail.

A plan to buy 99 additional buses to improve loading standards has been placed below the line.

Among the projects that are not part of the approved capital plan are:

  • Fire ventillation upgrades ($1.5b): This is not a legislatively mandated program except at sites where construction triggers a need to meet the current building code.
  • Yonge-Bloor capacity improvements ($1.1b): This project dates back to the era before the TTC accepted the need for and benefit of a “Relief Line”. If Metrolinx demand projections are to be believed, the future demand at this junction could be reduced substantially. This begs the question of exactly what “capacity improvements” are really needed, and whether savings in this project can be used to offset the Relief Line’s cost.
  • Waterfront ($1.1b): This project is described as being for the West Donlands LRT and four vehicles for the Bremner LRT. These lie beyond the timeframe of the East Bayfront LRT which is not included in the TTC’s list presumably because Waterfront Toronto is expected to pick up the tab.

Notable by its absence here is the Relief Line itself which, by virtue of its distant commencement date (if ever), is not within the plan’s 10-year scope.

Financing of the TYSSE has been affected by various factors including:

  • A provision for $150m in additional costs to complete the project.
  • A loss of hoped-for investment income from the Move Ontario Trust (which held Provincial subsidy monies for the project) of $85m as the trust was unable to achieve a 4% rate of return. This has been partly offset by redirection of surplus funding from TTC’s 2015 operations.
  • A loss of hoped-for Tax Increment Financing because the Ontario government has not passed an enabling regulation. This has been offset by a draw on the City’s Strategic Infrastructure Reserve.

PrelimANotes_CapTYSSEBudgetAdj

The Scarborough Subway Extension (SSE) will be funded from a number of sources including Federal and Provincial commitments. It is unclear whether these funds are “net new” or whether they represent a draw against programs such as the planned new Federal Infrastructure Program. If the latter, this will reduce the amount available to Toronto from this “pot” for other capital programs.

PrelimANotes_CapSSE