A Bigger Loop at Union Station?

In all the discussion of new transit lines serving the waterfront, we are also getting into the question of capacity at Union Station Loop.

Since many people will not have seen this design before, and a good quality drawing was just handed out by the TTC at a recent waterfront meeting, I’m posting it here.

UnionLoopDetail

The design shows a scheme for a new loop at Union at an interim stage in its development.  Here’s how the design works:

There is space underneath the teamways and outside of the existing tunnel structure to fit two more tracks plus platform space in the north-south direction.  In this design, you will see that the existing (now centre) tracks are disconnected at the south end and all streetcars take the outer loop past the new platform.  Inbound cars unload on the east side of the loop and outbound cars load on the west side.  There is room for four CLRVs on each platform.

Note that the existing platform space at the north end is expanded, and connects directly onto the new northbound Yonge Subway platform to be built as part of the Union Station expansion now underway.

Sometime in the future, if demand warrants it, the loop could be changed so that the east platform was reserved for cars bound to the eastern waterfront while the west platform was used for western waterfront services.  The inner tracks would be reconnected and used as bypass tracks so that the two sets of services could run through the loop somewhat independently of each other.

A further option, although tricky, would be the entry of a “Bremner LRT” (the proposed inner end of the Western Waterfront line) that would punch into the tunnel just south of the loop.  Dodging the pillars would be tricky, but apparently it is possible.

Southern Etobicoke and The Queensway

Mark Dowling sent in the following note in response to the item on Park Lawn Loop:

Where do you stand on a Queensway ROW west of Humber Loop?  I know ridership on 80 is dismal but so is the service.  The street is wide and to my mind screams for LRVs or Citadis 302s bombing along between Roncesvalles and Sherway at 2x bus stop lengths with all the toys – next-car displays, signal priority and the like – giving a real “subway-like” service as opposed to the joke our Mayor cracked in relation to St Clair.

The residential developments at Sherway and along the Queensway would, I believe, generate a decent ridership if decent service was offered. Who knows, it might even pull in some park and ride traffic from the Gardiner?

Steve:  First off, The Queensway as far as Kipling is an “Avenue” in the Official Plan, and it is also shown as a Transit Priority corridor all the way to Brown’s Line (as is Lake Shore).  You would never know this from the sort of service offered in that part of the world or the total absence of planning for improvements as part of the TTC’s LRT studies.

Southern Etobicoke has a huge amount of redevelopable land — old industrial property, strip malls, parking lots — and there are also big possibilities up at the Six Points.  However, if we keep pumping out the message that this part of the world won’t be developed soon, if ever, from our own Planning Department, transit will continue to ignore this part of the world as well.

To answer your question, yes, an LRT service along The Queensway would be a great addition to the network, assuming redevelopment to support it.

What effect this would have on the Gardiner is another matter.  I think that the car traffic comes from further afield in the 905, and the benefit of new transit services will be to allow growth in population without overwhelming the road system.  However, we must have the will to “invest” in the future of this part of the city just as we hope to do in the eastern waterfront.

Western Waterfront and Park Lawn Loop

This post is extremely long and most of it will be in the “more” section.  I received a copy of a letter addressed to Mike Olivier from David Nagler, the public consultation co-ordinator for the Western Waterfront LRT project.  The discussion is all about “why Park Lawn and not somewhere else” with a few other bits thrown in for spice.  My own comments are sprinkled through the post.

I have edited this slightly to eliminate duplicate information. Continue reading

The Myth of Fuel Cell Buses (2)

Recently, I wrote about the proposal by one neighbourhood group at the waterfront to use hydrogen fuel-cell buses in place of LRT.  Many thanks to all who contributed feedback to that piece.

This item contains a lot of technical bumpf and calculations.  If anyone finds an error in this, please let me know and I will be happy to correct it, even if that worsens my own argument.  I would like some real information to be “out there” on the issue rather than a lot of hype. Continue reading

The Myth of Fuel Cell Buses

There are times that the hot air surrounding transit technology forces my hand, and I have to take a stand on what really should be a marginal, non-starter of an issue.

In reviewing possible transit services in the eastern waterfront, one group, the Central Waterfront Neighbourhood Association (CWNA), is advocating not just that we use buses in place of LRT, but that we use hydrogen-fuelled buses.  Their presentation material includes a PowerPoint from Ballard Power Systems who have been trying for years to make a go of this technology. 

According to a Ballard press release dated October 23, 2006, there are only 36 buses operating worldwide that have, collectively, operated over 1.5-million km of service.  Let’s put that in context.  In 2005, the TTC bus fleet averaged just under 70,000 km/vehicle, or 2.5-million km for 36 buses.  That is over 60% more than the total mileage operated by all of the Ballard buses running worldwide.

Meanwhile, worldwide interest is focussed on hybrid diesel-electric buses on which a diesel generator powers an electric motor through a power storage system.  Hundreds of these vehicles are running in many cities, and the TTC already has 90 of its first 150-bus order in service.

There is no question that small-scale trials of hydrogen buses have been undertaken in many places, but it is unclear how this technology will stack up against diesel hybrids, especially considering that far more work is underway to produce hybrid buses that do not require the special fuelling facilities of hydrogen. Continue reading

The World’s Fair, the Gardiner and the Front Street Extension

[This item was originally posted last Saturday morning, and it has been recreated here following the recent system crash.  The comments submitted by various folks have vanished into the ether.]

Three would-be projects tell us so much about how screwed up Toronto’s priorities are. The proposed World’s fair is one of a long line of mega-events that would rocket Toronto to its place in the stars, a great city shining out for the world. Once upon a time, people came from all over North America to see “The City That Works” not for its one-time fairs, but for its neighbourhoods, for its commitment to a liveable city. We were renowned for that, and we managed to bring thousands of tourists here on the strength of that reputation. We really had something world-class to show off.That was 30 years ago. Continue reading

To Toll or Not To Toll

Today’s Metro Morning included a discussion of road tolls as a way to fund public transit.  Let’s put this in perspective.

The Gardiner Expressway report talks about a toll equivalent to a transit fare, and it would generate $130-million annually.  What can we get for $130-million?

  • Over 150 new buses per year, or
  • 15 to 20 percent improvement in TTC service, or
  • A 3 year project to build all of the eastern waterfront transit improvements, or
  • A 10 year project to rebuild and expand Scarborough’s transit network, or
  • A 20 year project to build the Spadina Subway to Vaughan

There is an unfortunate tendency to talk about funding sources such as tolls without putting them in context.  We know that the TTC’s own Capital Budget projections require about $1-billion annually for the next 10 years.  This includes about $3-billion worth of subway construction.

We keep talking about better transit, but we need to be honest about the amount of money involved.  $130-million a year is small change beside the Board of Trade’s estimate that congestion costs the GTA $1.8-billion.  Tolls might raise some money, but they are not going to solve all of our funding problems by a long shot, especially if we add major road projects like the Gardiner to our project list.

Any government thinking of funding transit has to face up to one basic fact:  tax revenue (whatever you call it) has to go up.  The only question is which pocket you pick.

Waterfront West and St. Clair LRT Projects

St. Clair Streetcars Return in Late November

The St. Clair line will resume streetcar operation on the last weekend of November 2006 when trackwork from Vaughan Road to St. Clair Station and elevator construction at that station will be completed.  We will have wonderful new track and maybe even working priority signalling (although I doubt we will actually see that for years, if ever), but the cars will still tiptoe over the rotten track at St. Clair West Station whose loop won’t be redone until next year.  So much for good construction planning.

There are rumblings that the section from Vaughan to Keele won’t be finished in 2007, but I have not tracked down anything definitive on that.  As for a possible extension beyond Keele, this is mired in redesign of the underpass at Dundas, Scarlett Road and St. Clair.

Isn’t it nice to know transit has such a high priority?

Waterfront West

Meanwhile, work is underway on the EA for the Roncesvalles to CNE portion of the waterfront line.  The TTC has the good sense to recognize that running this service into downtown via the Tonnerville Trolley operation on Queen’s Quay is a non-starter, and they are looking at branching off from Fleet Street via Fort York/Bremner Boulevards coming into Union Station in a tunnel along the north side of the Air Canada Centre.

No word yet on a redesign of Union Station Loop to handle the substantial additional loads that the eastern and western waterfront lines will bring.

All this will, of course, require funding for construction and for additional vehicles.