SmartTrack: That Pesky Curve in Mount Dennis (Updated)

Updated October 17, 2014 at 4:15pm:  Information from Metrolinx about the revised design for the Air Rail Link spur line from the Weston subdivision to Pearson Airport has been added.

John Tory’s SmartTrack proposal has been roundly criticized by various people, including me, on a number of counts. When one looks at the scheme, it is the technical issues — the degree to which SmartTrack will crowd out the Metrolinx RER scheme (or simply take over its function), the question of capacity at Union Station, the route along Eglinton from the Weston rail corridor to the airport. But the biggest challenge is the link from the rail corridor to Eglinton itself.

Let’s get one issue out of the way up front. Writing in the Star on October 6, Eric Miller states:

And it’s interesting to note that very little criticism deals with the basic merit of the proposal as an addition to Toronto’s transit network. The design logic to address major commuting problems is self-evident; analysis to date indicates high ridership and cost-recovery potential that is expected to be confirmed by more detailed post-election studies; and it is modelled on successful international best practice.

Criticisms have, instead, focused on the line’s “constructability” where it meets Eglinton Avenue W. and on Tory’s proposed financing scheme. As already briefly discussed, however, the constructability issue is truly a tempest in a teapot. And with respect to financing I would suggest that all three mayoral candidates and most of the popular press still have this wrong.

In fact, constructability and the technical issues are precisely what could sink this proposal. Dismissing this as a “tempest in a teapot” is a neat dodge, but it is the academic equivalent of “you’re wrong because I say so”. Many who support Tory’s campaign see criticism of SmartTrack as the work of naysayers who, like so many before us, doom Toronto to inaction.

This is tantamount to saying we cannot criticize the plan because doing so is disloyal to the city’s future. Never mind whether the plan is valid, just don’t criticize it.

Miller’s comments in his op-ed piece (linked above) also don’t line up with statements in the “Four Experts” article of October 9 where he and others talk about what SmartTrack might do. Miller is much less in agreement that SmartTrack could achieve what is claimed for it. Should we dismiss his comments as being irrelevant or counterproductive? Of course not.

This article deals with the challenge of getting from the rail corridor to a point under Eglinton Avenue West at Jane Street, the first stop on the journey west to the airport. To put all of this in context, it is vital to look at the details of both the Eglinton Crosstown LRT (including amendments) and at the Metrolinx Georgetown South project in the rail corridor.

Continue reading