The Gardiner Expressway and Transit to Downtown

The City and Waterfront Toronto are holding a public meeting to present an update on the future of the eastern section of the Gardiner Expressway.

Bluma Appel Salon
Toronto Public Library, Yonge North of Bloor
Thursday, February 6, 2014 from 6:30 pm to 9:00 pm

A media briefing on February 5 introduced the material, and there is widespread coverage in the mainstream press that I will not duplicate here. My interest lies more in the relationship of the expressway to travel demand generally, and to the importance of transit for the future development of central Toronto.

The media presentation contains information that will be included in the public meeting, and illustrations here are taken from that file.

StudyArea

The section of the Gardiner under study extends east from Jarvis Street to the Don Valley Parkway, plus the ramp down to Lake Shore Blvd. east of the Don River. It is important to remember what is not being changed.

  • From Jarvis Street west, the existing expressway will be rebuilt under a multi-year program stretching to about 2019.
  • The south end of the DVP will be modified only to the extent needed to connect in with whatever new or revised structure might be built.
  • The ramp down to Lake Shore will remain in its current form except if the Gardiner is removed, in which case the ramp will be demolished and a new Lake Shore will cross the Don on a bridge at grade.

The Gardiner’s design capacity was scaled for connection to a future Scarborough Expressway that was never built, and the structure east of Jarvis is wider than is needed for the demand. This section gives the greatest opportunity for reworking, and releases the most land around the expressway in any new configuration.

Continue reading