Where Will the Scarborough Subway Go?

The Toronto Star reports that Queen’s Park is contemplating an alternative route to Toronto’s proposed Scarborough subway extension via Eglinton and McCowan to Sheppard East.

The key paragraphs in the article are:

“In the next couple of weeks we should have an announcement on what the routing will be, what the design will be and what the cost will be,” he told reporters on the way into a cabinet meeting Wednesday.

Queen’s Park wants to have the subway run on a similar route to the light rail transit plan to “maximize the impact of this line and get it connected to as many people (as possible),” said [Transportation Minister] Murray.

Murray seeks to find out how much could be built with the $1.4b already committed to a subway project.  Using an existing corridor could reduce the cost compared to the McCowan alignment.

This raises questions debated in other threads here of how the subway would be extended via the existing SRT alignment including the configuration of Kennedy Station and whether a route from Ellesmere Station eastward would be elevated or underground.

Recycling some or all of the existing corridor will require a period of shutdown for the RT with parallel bus service, an issue that weighed heavily against the LRT scheme in recent debates.  Will the promise of a subway quell objections to this shutdown?

Murray will meet with Lisa Raitt, the federal Minister of Transport, to discuss funding, but he is already throwing cold water on hopes for assistance from Ottawa for a  “416” project.  Even if the feds bring money to the table, the next questions will be whether the original McCowan scheme or an SRT alignment for the subway are the best use of available cash, and how either subway would fit into a larger network.

The debate comes back to Toronto Council in October preceded by Murray’s announcement likely in mid-September.  Backers of the subway like TTC Chair Karen Stintz and recently-elected MPP “Subway Champion” Mitzie Hunter have stressed that their support for a Sheppard LRT was for a different line in different circumstances.  A Scarborough subway, wherever it goes, will leave large parts of eastern Toronto far from rapid transit.

The LRT debate is not over.  Will Stintz and Hunter become “LRT champions” for other parts of the network?

Memo to Glen Murray & Karen Stintz: Are You Really Serious About Transit in Scarborough?

With all the upheaval of transit plans for Scarborough, politicians fall over each other to tell Scarborough residents how downtrodden and ignored they have been, how they always get the short end of the transit stick.  How will we fix this?  Build them a subway!

Mind you, that subway won’t open for 10 years, and riders on the Scarborough RT will have to endure more cold winters and overcrowded service, not to mention bus routes that run occasionally and unreliably.

We should remember what Scarborough was originally promised with the Transit City scheme announced years ago by then-Mayor Miller and now-Candidate Adam Giambrone:

  • An LRT line from an underground station at Don Mills & Sheppard with a direct connection to the Sheppard subway running east to Morningside and beyond.
  • An LRT line from Kennedy Station east and north via Eglinton, Kingston Road and Morningside to Sheppard serving the University of Toronto Scarborough Campus (UTSC).
  • An upgraded and extended Scarborough RT using LRT to reach east and north to Malvern Centre.

The Sheppard LRT is “funded” by Queen’s Park, but actual construction is a moving target with completion now planned for 2021.

The Eglinton/Morningside line (aka “Scarborough-Malvern”) drifts in limbo not even a part of the Metrolinx “Next Wave” implying completion at best by the late 2020s.

The Scarborough LRT has been replaced by the Scarborough Subway.  Although Council attached many conditions to the financing for that line, you can bet that no politician in Toronto is willing to pull the plug, to return to the LRT scheme, with provincial and municipal election fortunes in play.  One way or another, even by the simple expedient of giving Ottawa more time to pony up “their fair share” (whatever that means), the subway scheme will stay alive, and the Scarborough LRT will start to resemble Monty Python’s “dead parrot”.  It will be “sleeping” only in the minds of its most ardent advocates.

Politicians love to tell us how much they support better transit in Scarborough, and they could start by talking about something more than the subway.

Continue reading

Feeling Congested Part 2: Setting Priorities

The City of Toronto’s Planning Department is consulting with the public for the development of an updated Official Plan.  The plan’s transportation component falls under the rubric of “Feeling Congested” with a website devoted mainly to transit issues.  In the first round of meetings, the focus was on “what is important”, what goals should the new plan try to achieve.  In the second round, the topic is the prioritization of goals and how these might drive out different choices in a future network.

This parallels work that Metrolinx is doing on their Big Move plan, but it includes additional options for study that are city initiatives such as transit to serve the waterfront.

A survey now in progress (until June 30) seeks feedback on the evaluation criteria for transit projects, and also for the goals of the cycling plans.  Some of this makes more sense if one first reads the toolkit, but even then the presentation will leave skeptics unhappy because there is no link to the detailed study explaining how the proposed criteria have been measured for each of proposals.  (A summary chart on page 14 does not include the subcategories within each of the eight criteria that generated the total scores .)

Even with this background, an exercise asking whether the methodology is sound seems to be an odd way to survey public attitudes without a stronger discussion of the implications for a preferred network.  This is rather like discussing the colour of a magician’s hat rather than the effect this might have on the rabbit he pulls out of it (or if there’s even a rabbit at all).

Continue reading

TTC Madness: A Subway for Everyone

Today’s meeting of the transit commission was expected to be a modest affair with approval of the Downtown Relief Line study’s recommendations, and a few other housekeeping items.  What happened was a complete upending of the transit expansion policies we thought were put in place by the Karen Stintz coup d’état that bounced Rob Ford’s crew off of the TTC board back in the spring.  Stintz herself didn’t even have the nerve to stand up to the runaway proposals from her fellow members preferring to keep peace, for now at least.

To make sense of this debacle, I have to recount some of the earlier events.

The main act was a presentation by TTC staff of the DRL Study, and it contained few surprises relative to coverage we have already seen in the press and on this blog.  One comment caused attentive ears to prick up, namely that spending $1-billion expanding Bloor-Yonge station might be less cost-effective than providing additional capacity with a new line.  Would that the TTC would look at all components of its subway plans that way (a topic for another article), but it’s a refreshing point of view.

The study and presentation make explicit reference to potential shortfalls in GO Transit capacity as part of the problem.  Although these will no doubt annoy Metrolinx (is there a TTC meeting that doesn’t anger Metrolinx?), that agency’s basic problem is that long-term secrecy about what it might actually build forces assumptions to be made.  That said, nothing prevented the TTC from modelling improved service on the GO northern corridors just to see what this would do to demand flows on a “what if” basis.  After all, the whole DRL study is a “what if” exercise.

Councillor Parker asked about Main Station as an alternative DRL/Danforth subway connection.  Staff’s position is that there are advantages to a north-south connection further west that would potentially serve Thorncliffe and Flemingdon Parks, and line up with the Don Mills corridor.  (I will address DRL options in a separate article.)  There were humourous remarks about how staff were trying to buy Parker off with a subway to his ward.

Parker moved that the Danforth to Eglinton section of the DRL be included in the next phase of the study, but the motion fell short of actually committing to this segment as a top priority.

Councillor Milczyn asked about eliminating parking on King or Queen Streets.  Staff replied that this would be important for improved surface transit, and the idea would be part of a separate Downtown Traffic Operations Study now underway by the City, but that this would not avoid the need for a DRL.

Milczyn also asked about a Lakeshore West LRT and seemed to be mixing the proposal that was one option in the DRL study (an LRT or subway line in the rail corridor) with the Waterfront West LRT (that would run on Lakeshore Blvd.).

Councillor Colle asked about capacity on the Bloor-Danforth line east of Yonge, and staff replied that with the DRL, this would not be an issue.  However, that remark misses the fact that the Danforth subway regularly passes up riders today east of Pape, the point where capacity would be freed up.  More service will be needed on the BD line even with the DRL in place.

Colle went on to ask whether extending the BD line to Scarborough Town Centre would affect the DRL’s alignment by shifting the logical point for “relief” further east.  Staff replied that the demand model already has the extra ridership that the replaced and extended SRT will bring to Kennedy Station built into projected Danforth subway demand.

Councillor De Baeremaeker observed than an overall city plan needs to include subways, LRT and buses, that the DRL is a “good subway”, and that the problems of inadequate GO service and fare structure forcing riders onto the TTC need to be addressed.  We will hear more from De Baeremaeker later.

The staff recommendations with a few minor amendments were passed, and the meeting turned to other matters including a presentation on Transit Oriented Development.  This was something of a Trojan Horse brought in by Build Toronto.  An L.A. based consultant who has done a lot of work on redevelopments around station sites talked about the importance of putting good development (including attractive amenities) around transit stations.  This is the classic transit model which looks nice, but ignores the degree of neighbourhood upheaval that the level of development implies.  When you have a greenfield site, or your client is a totalitarian government, pesky problems with local activists and zoning are rarely encountered.

The moral was that if we are going to build many new stations, we should ensure that development occurs around them.  On the Spadina Extension, this is easier said than done at some sites, and development plans are already in place at others.  On the Eglinton line, many stations are in existing low density areas, and there would be a challenge on threecounts having them all upzoned for development at the scale shown in the presentation.  First, the locals would get a tad upset, and public meetings featuring a liberal assortment of pitchforks, torches and rotten tomatoes would be on order.  Second, developers have to believe that these sites are a market for development.  Third, the transit line’s role in the network must be strong enough relative to other nearby facilities (notably highways) that the new development would actually feed the transit stations.  See Sheppard Avenue for a counterexample.

The main discussion turned on the issue of taxation and the L.A. experience with Measure “R” passed in 2008, and Measure “J” expected to pass in the upcoming elections.  “R” levied a 30-year, 0.5% sales tax on Los Angeles County to generate dedicated funds for transit.  “J” extends this for a further 30 years.  This funding will be used to underwrite debt that will be undertaken during the early period (the next 10 years or so) to build out many new transit facilities.

Unlike Metrolinx, whose Investment Strategy seems to be discussed on a pay-as-you-play basis, L.A. appears ready to take on long term debt with matching long-term funding.  This is not unlike buying a house — you buy and live in the entire house at one go rather than adding a room at a time for 30 years.

By this time, the Commission clearly had a taste for spending money.  The DRL was not enough, and the suburban councillors needed to jump in with their projects.

The opportunity came unexpectedly by way of a public presentation by Alan Yule who often deputes at TTC meetings.  He proposed that the Scarborough RT/LRT conversion could be shortened as follows:

  • Since most of the traffic is between STC and Kennedy, all other stations would be closed, and SRT service would run express between the two points.
  • The intermediate stations would be boarded off (much like what is now happening at the Union Station 2nd platform project) while their reconstruction for LRT proceeded behind the walls.
  • Eventually, the work would have to turn to the right-of-way itself, and the line would close, but presumably for a shorter period.

I won’t go into details, but believe that the really time-consuming parts of the project would not be affected by this scheme, notably the underground work north of Ellesmere and the changes at Kennedy Station.  Alan does good, entertaining presentations.  The Commission thanked him for his work, and then the wheels came off the debate.

Councillor De Baeremaeker (he of the we need all modes in the network comment above) moved that staff report on the merits of a subway extension from Kennedy to Sheppard & McCowan.  De Baeremaeker’s position, following on from the One City Plan that briefly surfaced in June 2012, is that the difference in construction cost for a subway is only $500m greater than the cost of the LRT project, and this makes the subway option a great deal.  What he misses is that the comparator subway estimate is only for a line to STC, not to Sheppard.

That extra 3.6 km will cost roughly $1b and push the delta for the subway/LRT comparison much further apart.

Correction: The extra 1.7km will cost $700-million more than the LRT project according to a 2010 estimate. Moreover, the LRT runs further going east to Sheppard and Progress where extension to Malvern is possible.

(The question of comparative costs was discussed back in December 2010 in this article.)

De Baeremaeker should know this already, but it suits his role as the Superman of Scarborough transit to continue the charade that we can have a subway replacement for LRT at only a modest additional cost.  He also does not address the much higher operating cost of a subway line, especially given that it would be on a new, underground alignment, not at grade as the RT/LRT would be.

TTC CEO Andy Byford stayed clear of this debate, but recently in an interview on CBC he expressed guarded support for extending the Danforth subway.  This sends a mixed signal to the politicians and suggests that staff are not firm in their support of the LRT network.

Oddly enough, the staff position on the DRL continues to paint this as something for the medium to long term, at least 15 years away, with the option of adding capacity elsewhere in the interim.  This provides a window into which other subway construction projects might try to slip, an idea clearly on de Baeremaeker’s mind.

Not to be outdone, Councillor Milczyn asked that staff also report on looping this extended subway west from Sheppard & McCowan to Don Mills Station.  This is the Sheppard East subway, but reborn at least entirely on Sheppard itself rather than going through an industrial district to STC.  Such a line would obviously replace the Sheppard LRT.

Need I remind Commissioners of a phrase we heard a lot back during the subway/LRT debates:  Council’s will is supreme.  Council has voted, with not a little blood on the floor, for an LRT network which the province is supporting (to the degree that is possible in the current political climate).  Indeed, the Commission voted today to give CEO Andy Byford the authority to sign the operating agreement form the four-line LRT network.

Metrolinx’ hands are not completely clean in this on a few counts.  Most importantly, as recently as two days ago (Oct. 22), a representative presented an LRT project overview at a public meeting that includes a five-year shutdown for the SRT rebuilding.  However, Metrolinx own VP of Rapid Transit Implementation, Jack Collins, has said that during the contracting stage, Metrolinx hopes to get proposals from bidders that will be under 3 years, maybe only 2.5.  However, such a change has not been blessed by a Ministerial statement, and so we still hear “5” which scares the hell out of Scarborough transit users.  Toronto is ill-served by Metrolinx’ lack of accurate details in its public statements, of which this is only one example.

As if all this isn’t bad enough, the Commission has asked for these analyses to be available for its January 2013 meeting even though staff will be pre-occupied with major work on the 2013 budget for the next few months.  The date may slip, but what is clearly going on is that somebody wants information for use in a coming provincial election campaign.

What we see here is a Commission that claims to understand the limits of spending, that claims it should focus on subways where they are really needed, but which insists on revisiting LRT proposals over and over in the hope that they can be upgraded.  Saying “no” is very hard for a politician to do, especially when constituents have been convinced that LRT is a distant second class option.

The Star reports Councillor Parker’s reaction to the vote:

TTC commissioner John Parker, who was out of the room praising the decision on a downtown relief line, confronted his commission colleagues afterwards, telling them that voting in favour of subway studies was “a stupid, stupid, irresponsible thing.”

“Irresponsible” does not begin to describe my feeling about this vote, one which proved that the current Commission, given half a chance, will be just as irresponsible about the subway/LRT debate as the Ford-friendly crew they replaced.  It is not enough to say that we are getting more information for a better debate.  We have had this debate, and only people with a distaste for the hard truths about subway costs can pretend that this option is viable.

Metrolinx Dumps TTC as LRT Partner (Maybe)

Updated October 4, 2012 at 9:20 am:

Mr reaction to the announcement yesterday that TTC would remain as “operator” of the LRT lines is on the Torontoist website.

Although the TTC sees this as a “good news” story, I am less impressed because Toronto is still very much the junior partner.  We get to drive the trains, and that’s about all.  With all maintenance remaining in the hands of Metrolinx private partner, whoever that will eventually be, this is a big step in outsourcing transit operations.

Updated October 1, 2012 at 10:00 pm:

The Toronto Star reports that discussions continue between Metrolinx, the City of Toronto and the TTC regarding the possible operation of the planned LRT lines by the TTC rather than a private contractor.

Exactly how much “operation” would entail is not mentioned, although the TTC is known to be concerned about responsibility for safety-sensitive systems such as vehicle, signal and track maintenance.

A related issue is the amount of detail that must be worked out before a master contract is let by Infrastructure Ontario.  If the private work ends when operation begins (with possible exceptions such as building and station maintenance), then this is a much simpler contract to draft than one that would require all of the details of future operations to be bundled with a design and construction contract.

Whether Queen’s Park and Metrolinx are aware of or care about the delay inherent in needing to specify so much detail so far in advance for a single contract remains to be seen.

September 21, 2012

My thoughts on recent announcements that Metrolinx would completely take over the LRT projects formerly part of Transit City are in an article on the Torontoist website.

 

OneCity Plan Reviewed

The OneCity plan has much to recommend it even though in the details it is far from perfect.

The funding scheme requires Queen’s Park to modify the handling of assessment value changes, and they are already cool to this scheme.  Why OneCity proponents could not simply and honestly say “we need a 1.9% tax hike every year for the next four years” (not unlike the ongoing 9% increases to pay for Toronto Water infrastructure upgrades) is baffling.  A discussion about transit is needlessly diverted into debates about arcane ways of implementing a tax increase without quite calling it what it is.

On the bright side, Toronto may leave behind the technology wars and the posturing of one neighbourhood against another to get their own projects built.  Talking about transit as a city-wide good is essential to break the logjam of decades where parochialism ruled.  Couple this with a revenue stream that could actually be depended on, and the plan has a fighting chance.  Ah, there’s the rub — actually finding funding at some level of government to pay for all of this.

Rob Ford’s subway plan depended on the supposed generosity of Metrolinx to redirect committed funding to the Ford Plan (complete with some faulty arithmetic).  Similarly, the OneCity plan depends for its first big project on money already earmarked by Metrolinx to the Scarborough RT to LRT conversion.  If this goes ahead, we would have a new subway funded roughly 80% by Queen’s Park and 20% by Toronto.  Not a bad deal, but not an arrangement we are likely to see for any other line.

On the eastern waterfront, there is already $90m on the table from Waterfront Toronto (itself funded by three levels of government), and OneCity proposes to spend another @200m or so to top up this project.  Whether all $200m would be City money, or would have to wait for other partners to buy in is unclear.

Toronto must make some hard decisions about a “Plan B” if the Ottawa refuses to play while the Tories remain in power.  Even if we saw an NDP (or an NDP/Liberal) government, I wouldn’t hold my breath for money flowing to Toronto (and other Canadian cities) overnight.  A federal presence is a long term strategy, and spending plans in Toronto must be framed with that in mind.

Sitting on our hands waiting for Premier McGuinty or would-be PM Mulcair to engineer two rainbows complete with pots of gold landing in Nathan Phillips Square would be a dead wrong strategy.  Bang the drum all we might for a “one cent solution” or a “National Transit Strategy”, Toronto needs to get on with debating our transit needs whether funding is already in place or not.  Knowing what we need and want makes for a much stronger argument to pull in funding partners.

In some cases, Toronto may be best to go it alone on some of the smaller projects, or be prepared to fund at a higher level than 1/3.  If transit is important, it should not be held hostage by waiting for a funding partner who will never show up.

The briefing package for OneCity is available online.

My comments on the political aspects of OneCity are over at the Torontoist site.

To start the ball rolling on the technical review of the OneCity network, here are my thoughts on each of the proposals in the network. Throughout the discussions that will inevitably follow, it is vital that politicians, advocates, gurus of all flavours not become wedded to the fine details. Many of these lines won’t be built for decades, if ever, and we can discuss the pros and cons without becoming mired in conversations about the colour of station tiles.

Continue reading

“One City” To Serve Them All

Updated June 27 at 5:20pm:  I have written a political analysis of today’s announcement for the Torontoist website that will probably go live tomorrow morning.  A line-by-line review of the plan will go up here later the same day.

TTC Chair Karen Stintz and Vice-Chair Glen De Baeremaeker will formally announce a new plan called “One City” on June 27 at 10:30.

The plan already has coverage on the Star and Globe websites.  Maps:  Globe Star

I will comment in more detail after their press conference, but two points leap off the page at me:

  • The proposed funding scheme for the $30-billion plan presumes 1/3 shares from each of the Provincial and Federal governments.  This money is extremely unlikely to show up, especially Ottawa’s share.  From Queen’s Park, some of the funding is from presumed “commitments” to current projects such as the Scarborough RT/LRT conversion which would be replaced by a subway extension.  The rest is uncertain.
  • The “plan” is little more than a compendium of every scheme for transit within the 416 that has been floated recently in various quarters (including this blog).  What is notable is the fact that glitches in some of the existing ideas (notably the fact that the Waterfront East line ends at Parliament) are not addressed.  The whole package definitely needs some fine tuning lest it fall victim to the dreaded problem of all maps — once you draw them, it’s almost impossible to change them.

For those who keep an eye on political evolution, the brand “One City” surfaced in April 2012 in a speech made by Karen Stintz at the Economic Club of Canada.  This idea of a new, unifying transit brand appears to have been cooking for some time.

TTC v. Metrolinx (Again): Who’s In Charge Here? (Update 2)

Updated June 8, 2012 at 11:00am:  My comments about the Commission’s action appear in an article on the Torontoist website.

Updated June 1, 2012 at 9:15am:  The motions passed at the TTC meeting of May 30 have been added at the end of this article.  The Commission took a much more conciliatory view of their relationship with Metrolinx than the staff report.  I will be writing about this situation in a separate article.

The original May 29 article follows below.

The Supplementary Agenda for the May 30, 2012 TTC meeting includes a report “LRT Projects in Toronto — Project Delivery”.

This report deals with the proposed transfer of responsibility for the Transit City LRT projects on Eglinton, Sheppard, Finch and the SRT replacement from the TTC to Metrolinx and Infrastructure Ontario.

As TTC reports go, this one is rather oddly worded in that it:

  • asks the Commission to “note” a number of factors,
  • requests that provincial agencies respond to various issues,
  • sets an October 31, 2012 deadline for the transfer of project control, and
  • proposes that the TTC’s own staff now dedicated to the LRT projects be redeployed internally.

In effect, the TTC is taking their ball and going home rather than play with the guys from down the block.  This suggests a strained relationship between agencies notwithstanding the soothing words we hear so often, and a sense that a fed up TTC is telling Queen’s Park to get lost.

From a purely political and administrative point of view, Queen’s Park holds all the cards because they are paying almost the entire cost (with a small Ottawa contribution to Sheppard) for these projects.  It’s their money, and they get to say how it will be spent.  Whether it will be spent wisely, and how the projects might fare with the TTC on the sidelines, these are questions that won’t be answered for years until we see the results.

Continue reading

TTC Meeting Wrapup: May 1, 2012

The TTC board met on May 1.  This was a quiet affair without the political drama of the “old” Ford-stacked Commission, and I almost missed the bumbling antics of the old crew.  The agenda was on the thin side, and everything wrapped up in a few hours.

Major items included:

  • a status report on the LRT projects,
  • proposed changes to the Richmond Hill extension of the Yonge Subway,
  • the Framework Agreement with Metrolinx for implementation of the Presto farecard,
  • the Customer Satisfaction Survey, and
  • the CEO’s report.

Continue reading