The information panels from the Finch West open houses are now online at the project’s website.

A few items of interest from the preliminary plans are:

  • Station designs for both Finch and Finch West stations
  • Design problems for the Highway 400 crossing
  • Options for the western terminal

At both subway stations the LRT will serve, one of the options will be an underground LRT station.  At Yonge Street, a few of the proposals seem a bit far-fetched especially a lengthy “around the block” arrangement that would encircle Finch Station with LRT trackage.

Something that needs to be remembered in whatever design the TTC chooses is the possibility the line will eventually be extended east on Finch.  An east-west alignment for the terminal as well as the capacity for a large volume of transfer movements with the subway are important, and my gut feeling is that the underground scheme will be chosen.

At Finch West Station, there are two main options:  surface or underground.  The surface option has two variants.  Either this would emulate the classic streetcar/subway interface such as we see downtown with passengers walking to sidewalk subway entrances, or there would be a centre platform with connections directly to the mezzanine level of the subway.  The latter is my preference.

The western terminus is not settled yet, but the Woodbine Live centre is certainly an extension option.  Totally absent from the panels is any discussion of an airport connection.  The possible alignment shows up on an overview of all transit studies, but as part of a Hydro corridor scheme. 

Finally, I must congratulate the TTC in finding a photo of an attractive substation, a lovely brick structure that would actually complement any neighbourhood rather than the dull bunkers we have seen in previous open houses.  Who knows?  Transit City may launch a whole new generation of “hummer houses”, a disappearing feature of the Toronto landscape.

Scarborough-Malvern and Finch West LRT EAs (Update 1)

The first round of public meetings for the Scarborough-Malvern line will be held on July 23rd and 24th.  Meetings for the Finch West line will follow on July 29th, August 6th and 7th.

Scarborough-Malvern Project Site

Finch West Project Site

Updated July 30:  The Scarborough-Malvern display panels are now available online.  Note that on Page 13 the peak ridership forecast is now 4,600 to 5,000 per hour.  This change from earlier estimates (3,900) I reported is due to the incorporation of updated population and employment projections, and the change to 2031 as the reference year to match the estimates in Metrolinx studies.

Various routes from Kingston Road north to Malvern via UofT Scarborough Campus are shown in the display.  The preferred route travels north on Morningside as far as Sheppard, then west (via shared trackage with the Sheppard East LRT), the north via Neilson to Malvern Town Centre.  The alignment would be generally in the middle of roads except possibly near UTSC depending on what design would best serve that campus.

The Finch West site now was a FAQ which gives a projected peak ridership for the line of 2,300 to 2,800 per hour.  The lower figure matches the earlier published 2021 estimate.  I am not sure if the two studies are drawing on the same source of ridership estimates, and I will follow this up with the planners.