How Much Service Actually Runs on King Street?

In many past articles, I have reviewed the quality of service on various routes from the point of view of headway regularity, travel times and short turns. While these analyses can show that disordered service is commonplace, they do not address a more basic question: what is the actual capacity of service offered, how consistently does the TTC actually provide room for passengers to ride?

This article uses vehicle tracking data in a different manner.

Service at Bathurst & King picks up almost all transit vehicles in both directions without effects of short turns. However, raw vehicle counts do not directly represent “capacity” because this must be adjusted for vehicle size. For example, twenty streetcars in one hour can carry more passengers than twenty buses. The capacity per hour is affected by the combination of two factors: how many vehicles of each size actually passed the intersection, and how many vehicles even operated in the peak period. The latter factor is important because “missed trips” don’t just arise from erratic service, but also from a failure to field all of the scheduled vehicles.

Hour-by-Hour Capacity

The following sets of charts show the capacity of service passing Bathurst Street eastbound during the AM peak (0600 to 1000) and westbound during the PM peak (1500 to 1900). Data are shown for all weekdays from September 2013 to July 2016 except for February 2016 (because I do not have data for that month).

There are three types of chart in each set:

  • Vehicle counts by type by hour
  • Capacity of the vehicles observed by hour
  • Total capacity over the four-hour period

504_CapData_Bathurst_EB

504_CapData_Bathurst_WB

Visible in these charts is the fluctuation from time to time in the proportion of service provided with standard CLRV streetcars, articulated ALRV cars, buses and new Flexity LFLRVs (since June 20, 2016). Very low values on individual days correspond to situations where a diversion to much or all of the service away from the intersection, typically to Queen Street. Another factor is that occasionally information for the time in question does not exist in the data provided by the TTC.

Over the length of an hour, a small day-to-day variation might be expected in vehicle counts through minor service irregularity. However, the mix of vehicles affects overall capacity. Late 2014 saw the onset of bus replacements of streetcars, and the drop in streetcar counts came primarily from ALRVs which are much larger vehicles. The number of bus trips required to replace ALRV trips was substantially larger as the charts show. However, there remains a considerable fluctuation from day-to-day in the number of each type of vehicle.

Capacities are calculated from the TTC’s service design values:

  • CLRV: 74
  • ALRV: 108
  • LFLRV: 130
  • Bus: 51

Note that vehicles can carry more people than these numbers suggest under crush conditions, but service cannot be designed based on crush loads on every trip.

What is quite striking about the capacity charts is the fluctuation over a range of about 500 passengers per hour, roughly 25% of the typical value, during the busiest periods. In other words, even if the vehicles arrived evenly spaced and, therefore, evenly loaded, there would be a considerable change day-to-day in the quality of service experienced by riders.

This begs the question of whether the days with lower capacity arise from “traffic congestion”, the TTC’s favourite explanation for erratic service, or if another factor could be at work.

Vehicles in Service

Another way to look at the data is to simply count the number of vehicles in service on the route. The next charts report on the number of vehicles of each type observed on the central part of King (Jarvis to Jameson) from 0700 to 0900, and from 1600 to 1800.

504_CapData_VehicleCounts

What one would expect to see if the schedules are to be believed is that the vehicle counts would stay more or less the same for a series of weeks corresponding to one or more “board periods”, the five-to-six week periods for which set of schedules remains in effect. However, what we see, particularly for streetcar modes, is a substantial change day-to-day in the number of vehicles the TTC actually fielded. The total vehicle count has fluctuated quite a lot (a range of about 10 vehicles on a likely scheduled total in the high 50s in the AM peak).

The numbers here do not translate directly to capacity, but they are linked:

  • More streetcars and fewer buses can lead to higher capacity depending on the replacement ratio, but this can be offset by the degree to which larger streetcars (ALRVs) are used.
  • Schedule changes to increase running times, even at similar headways, result in more vehicles in service (because the round trip time is longer) but not in more capacity (the vehicles/hour counts are unchanged).

The TTC speaks of the bus trippers on King as “expanding capacity”. As the charts clearly show, they do not achieve this effect because they are only replacing streetcars, and not necessarily on an equal capacity basis. The buses are a response to a shortage of streetcars, not a service improvement, except in the sense that without them the remaining streetcars would be even less able to cope with demand.

One factor which the vehicle-based data cannot reveal is the degree to which runs are cancelled because there are not enough operators available to drive them. This is not just a manpower issue, but one of schedule design and the degree to which all runs are part of regular crews, and how many depend on spare or overtime operators whose availability fluctuates. Trippers that operate for a short period are especially vulnerable to this because they are short pieces of work more likely to be crewed as extras.

The TTC has many challenges on King Street, and the City is now studying ways to redesign the street to aid transit operations, among other goals. However, fielding a consistent level of service is an essential part of delivering a consistent quality to riders on the line, and the TTC does not achieve this.

There has been some growth in capacity of service provided on the central part of the route, notably with the service redesign for 514 Cherry, but how long this will last in an era of trimmed budgets remains to be seen.

Note:

The counts and capacities shown here include service on 514 Cherry starting in late June 2016, but do not include service on 508 Lake Shore. This service was suspended due to the streetcar shortage in January 2015 (PM peak), and June 2015 (AM peak). It contributed a small amount of added capacity when it operated, but this was quite erratic because the arrival times and numbers of vehicles assigned varied considerably. I do not have 508 tracking data for many of the months included in these charts, and so have omitted the route from the analysis.

The Mysterious 514 Car

The TTC’s new route, 514 Cherry, is travelling incognito these days with blank destination signs on the CLRVs and with only a small route sign bound over the “Short Turn” marker.

Originally, these cars were supposed to be signed:

  • 504 Parliament
  • 504 Dufferin

in their east and westbound directions, but clearly someone decided that this was confusing. According to @ttchelps this is supposed to be a “temporary” arrangement pending the arrival of new streetcars on the 514. However, that won’t actually be completed until mid-2017 at best.

Meanwhile, would-be riders are left to wonder just where these cars are headed.

If someone approaches from the rear or side of the car, nothing is visible. From the front, one might spot the small sign “514 Distillery” but even this is meaningless for a westbound car. Meanwhile, the TTC suggests the 514 as a way to reach the CNE even though nothing on the cars suggests that the Dufferin Gates might be their destination.

This is a recipe for discouraging ridership, especially from riders unfamiliar with the route. Regulars on King will quickly learn what these cars really are – after all, the TTC messes around with service in this corridor on a regular basis and learning this week’s variation is a survival skill. Visitors, be they tourists from New York or North York, are quite another matter.

From the 2015 Customer Charter Goals:

We will provide the clearest, most accurate and up-to-date service information possible to our customers.

Alas, it is time for another round of asking readers to report problems with inadequate, incorrect or out of date signs on the TTC. For a system that prides itself on “Customer Service”, they have a long way to go.

 

TTC Service Changes Effective Sunday, September 4, 2016 (Updated)

Updated August 15, 2016: The detailed table of service changes has been added to this article.

September 2016 will see a return to the “winter” schedules on most TTC routes. Despite talk of service cuts in the budget process, the new schedules include some improvements to correct for operational problems on a few routes, and to better handle existing demand. The scheduled mileage for September is actually above the budget level due to greater than anticipated requirements for diversions and extra vehicles to deal with construction projects.

2016.09.04 Service Changes

Continue reading

512 St. Clair: Construction Effects on Travel Time

Through the summer, the 512 St. Clair route will be under construction for various projects:

  • Modification of loading islands,
  • Reconstruction of the portal ramps and track at St. Clair West Station,
  • Reconstruction of overhead wiring at St. Clair West Station,
  • Reconstruction of the roofs at St. Clair Station streetcar and bus levels.

Buses are now operating over the entire route and this will continue until the Labour Day weekend when streetcars will return from St. Clair West Station to Keele. The work at St. Clair Station will not complete until late fall 2016, and buses will remain on the eastern section of the route.

The buses share the road lanes with auto traffic and generally do not make the trip as quickly as the streetcars. This article shows comparative data from early June 2016 when streetcars were still operating and late June after the buses took over.

Continue reading

Travel Times on Queens Quay West

At a recent TTC Board meeting, the question arose of just how well Queens Quay operated as a transit street and how long it took the streetcars to navigate through the new setup.

Staff claimed that they had added six minutes to the schedule to compensate for problems, but this really didn’t give the full picture. Not to miss a chance to carp, Councillor Minnan-Wong latched onto this number and worked it into the debate at Council when the “Waterfront Reset” report was up for debate. The report passed without amendment, but the seeds of disinformation have been planted.

In the interest of clarity and accuracy,  rare commodities at City Hall, here is a review of what has actually been happening.

Continue reading

TTC Service Changes Effective Sunday, July 31, 2016

The service changes taking effect at the end of July consist primarily of realignment of surface route schedules to match the 8:00 am Sunday opening of the subway system. This affects a long list of routes, and the new first bus times are given in the attached document. Some night services will be adjusted to match the earlier startup times of the corresponding daytime routes. Routes that are part of the Ten Minute Network will have their frequent service hours extended earlier on Sundays.

For the duration of the CNE, the 511 Bathurst and 509 Harbourfront routes will return to Exhibition Loop. Although  the schedules provide running time for this effective July 31, cars will turn back at Fleet Loop until the CNE opens on August 15, 2016. A bus shuttle service will operate on Fleet Street until August 14. After Labour Day, service will be scheduled to end at Fleet Loop with a bus serving Fleet Street as at present. This arrangement is expected to continue until mid-November when construction at Exhibition Loop will be completed.

2016.07.31 Service Changes

 

Toronto’s Network Plan 2031: Part III, Fare Integration

This article is the third installment of my examination of reports going to Toronto Executive Committee and to the Metrolinx Board on June 28, 2016. For a complete list, see Part I of this series.

This article deals with two separate reports from the City of Toronto and from Metrolinx about Fare Integration. These two reports have quite different outlooks. For Metrolinx, there is an acknowledgement that any new fare policy will be difficult, but a determination to stay the course with their work plan and fare models. For Toronto, the focus is on the inequity of short versus medium and long-distance GO fares (a problem not just for Toronto as a node), and on the changes needed for GO to become more than a 905-to-Union Station commuter railway.

Additional material comes from the Metrolinx Fare Integration Advocacy Groups & Academics’ Workshop held on June 24, 2016. Presentations from this workshop are not yet online.

Continue reading

Kvetching About 512 St. Clair

The opponents of the 512 St. Clair streetcar right-of-way don’t miss any opportunity to slag the line. The TTC doesn’t help when it does not fully explain what is going on with this summer’s construction projects, and paints the work primarily as “accessibility” and “new streetcar” related.

A common complaint in Toronto is that nobody co-ordinates construction projects. Well, for those who bother to pay attention to the announcements of such things, co-ordination on a large scale is happening, and St. Clair is part of it. Many projects fit together like a jigsaw puzzle this summer.

  • St. Clair Station bus and streetcar loops require structural repairs that will take from now until late in the year. This has nothing to do with accessibility (the station already is accessible), nor with overhead changes for new streetcars (new pantograph-friendly overhead has been in place since 2011).
  • The ramps leading into St. Clair West Station Loop were not rebuilt during the line’s shutdown a few years ago (this is the only part that was, for some reason, omitted). They are the original installation from the Spadina subway opening and require reconstruction.
  • St. Clair West Station is not accessible, and work on this will begin this summer. However, that has nothing to do with the shutdown for all bus and streetcar routes serving the loop.
  • The overhead within St. Clair West Station must be converted for pantograph operation, but this is work that would typically be done overnight, or at most over a weekend.
  • Presto conversion of St. Clair West Station can be conveniently done while the station is closed, but did not strictly require it.
  • Reconstruction of small sections of the islands on St. Clair is required for proper operation of the low floor cars’ boarding ramps, but these island also require electrical fit-outs for Presto. This work is similar to that was done on Spadina.
  • Track construction at College & Bathurst prevents streetcar operation including access to St. Clair (although if this were the only issue, it would be handled by storing cars at Hillcrest or on the line as has been done in the past). The controlling factor is the ramp construction at St. Clair West. The Bathurst trackage will re-open in mid-July.
  • Work on College Street West by Toronto Water and as part of local street improvements for the BIA requires partial street closures. This has been co-ordinated with TTC trackwork at Bathurst and at Lansdowne.

In all of this, if one wants to knock the TTC, one might ask “why were the islands not done sooner” and “why were the ramps at St. Clair West left so long”. As for the islands, that’s partly a head-scratcher for accessibility, but Presto is a net new requirement. I suspect that the work could be done in under two months, but co-ordination with the other projects makes for one shutdown, not two. The ramps are another matter, and I have never heard an explanation of why this work was not done during the previous shutdown.

As for the replacement bus service running in mixed traffic, yes, that is going to be annoying. TTC does not want to use the streetcar right-of-way understandably because of narrow clearances with the overhead poles and the meandering path the lanes take. Those poles (notably absent on Spadina) were put in despite many questions to the TTC (including from emergency services) about the need for this design. What was really happening was that there was a boffin in the consulting firm working on the new streetscape who wanted the street lighting poles (which traditionally held up the TTC’s overhead) to be spaced further apart than TTC requirements. In the fullness of time, this wasn’t how the street was built (because the illumination level would not have been adequate), but meanwhile the TTC insisted on its own centre median poles except where buses share the right-of-way west of Bathurst.

It wasn’t a technical requirement, it was the combined stupidity of the street designer and the TTC’s sticking with a design that they no longer required. The result we have is a streetcar right-of-way that cannot host temporary bus service.

There is a lot to complain about with the TTC, and I am often criticized for writing more about the negatives than the positives. However, this is a case where a great deal of work has been collected into one set of shutdowns, and that is precisely the sort of thing the TTC and City should be doing.

TTC Service Changes Effective June 19, 2016

Many changes will affect TTC operations with the onset of summer schedules for 2016. These include both the usual seasonal changes to service levels, several construction projects affecting routes, and the restructuring of routes serving the waterfront.

Updated May 24, 2016 at 7:30 pm: Preliminary information on construction diversions at Broadview Station has been added to this article.

2016.06.19 Service Changes

The information in the spreadsheet linked here is organized into three sections:

  • Routine, mainly seasonal, changes
  • Groups of changes related to specific projects and route reorganization
  • Construction project calendar

20160619Map514Changes

The 514 Cherry streetcar route begins operation running via a short spur south from King to Distillery Loop. Initially this will run with a mix of Flexities and CLRVs pending an increase in the fleet of new cars. Eventually track on Cherry will extend under the rail corridor and south into the Port Lands, but that is a project still years away and subject to the usual wrangling at Council about capital spending priorities.

In the 2016 Budget, the TTC Board and Council chose not to fund the new service with additional money, and so this operation will be implemented by cutting service on the outer ends of the 504 King route. Peak service will operate every 8-9 minutes, and off-peak periods, the line will operate on a 15 minute headway with five cars. A blended service on King is impractical given the large difference in frequencies between the 514 and 504 routes. Whether the Cherry cars actually pull out onto King into gaps and carry passengers, or merely slip in behind King cars and let them do the work remains to be seen.

The 172 Cherry Street bus has been replaced by an extended 72 Pape over a new route serving Queen Quay East, and by a new 121 Fort York – Esplanade bus that will operate on, at most, 15 minute headways, a considerable improvement over the former 172 Cherry.

Sunday Stops

The TTC continues its program to remove Sunday Stops from the system with removal of stops at the following locations.

20160619SundayStops

Streetcars Return due to Bus Shortage

With the onset of construction season, and despite the summer service cuts, several streetcar routes will be partly or completely replaced by buses: 512 St. Clair, 511 Bathurst, 506 Carlton. This will be offset by the return of streetcar service to the 502 Downtowner and 503 Kingston Road Tripper lines, as well as full streetcar service on 504 King with no bus trippers. Service will likely revert to combined streetcar/bus operation in September thanks to the late deliveries of new Flexity streetcars by Bombardier.

Construction Work on College Street

Several projects on College Street West have been timed to occur over the summer of 2016.

  • Special track work replacement at Bathurst and at Lansdowne
  • Removal of safety islands at Bathurst eastbound and at Bay Street both ways
  • Expansion of the safety island westbound at Bathurst
  • Water main upgrades on College and on Lansdowne
  • Streetscape improvements on College

The effects of these will be:

  • 506 Carlton will operate with buses in the west and streetcars in the east on weekdays, and with buses over the entire route on weekends. The weekday services will overlap between Church and Bay. This will continue throughout the summer.
  • 47 Lansdowne will divert around the construction area via Dufferin Street.
  • 511 Bathurst will be operated by buses until the next schedule change at the end of July diverting around construction via Spadina between Harbord and Dundas.
  • The 509/511 bus shuttle on Fleet Street will be replaced by the 511 bus service.

Details of the service diversions are in a separate article.

When streetcar service returns to Bathurst Street, the cars will operate into Exhibition Loop so that through service is provided until the Labour Day weekend. In September/October, service will be cut back again to Fleet Loop for a track replacement project in Exhibition Loop.

St. Clair Construction

Major construction work at St. Clair and St. Clair West Stations will require removal of streetcar service over the summer and early fall. The approach ramps at St. Clair West were not rebuilt during the line’s reconstruction, and the track must be replaced. The entire 512 route will be operated with buses through the summer, and streetcars will return from St. Clair West to Keele in September. Full streetcar service will resume on the Thanksgiving weekend in October.

Buses will not be able to enter either station during this project. At St. Clair Station, all bus service will loop on street via Avoca, Pleasant Boulevard, Yonge and St. Clair with transfer connections at the Pleasant Boulevard entrance. At St. Clair West Station, the 90 Vaughan bus will be extended south to Bathurst Station, and routes 33 Forest Hill and 126 Christie will be interlined. All buses will make an on street transfer connection at St. Clair West.

Broadview Station Construction

The bus loop at Broadview Station will be rebuilt over the summer and all bus services will loop on street via Erindale, Ellerbeck, Danforth and Broadview using an on street transfer. Given the frequent congestion of streetcars on Broadview awaiting entry to the station, the bus service will add to the congestion at Danforth northbound. The arrangement of on street stops for the four bus routes affected here has not yet been announced. Running time has been added to allow for the around-the-block loop except in cases where there was already enough recovery time in the existing schedule.

Updated May 24, 2016: Brad Ross at the TTC has provided the preliminary construction notice for the service and street changes. In addition, the Brick Works shuttle bus which normally loads on Erindale outside of Broadview Station will be relocated to Chester Station.

Bayview Services Reorganized

Peak period frequent service on 11 Bayview now ends at Davisville & Bayview, but this will be extended to Sunnybrook Hospital with every second bus running through to Steeles.

The 28 Bayview South route serving the Brick Works now operates only on weekend daytime hours, but will provide service during all periods.

Victoria Park North

Service in York Region on Victoria Park will now be provided by York Region Transit. The 24D Victoria Park branch to Major Mackenzie will be dropped and all service will turn back at Steeles Avenue. The 224 Victoria Park North route will cease operation.

Richmond Street Construction

All Downtown Express services will divert westbound from Church to Peter while Richmond Street is rebuilt from Victoria to York. Whether there will be any provision to assist the left turns west-to-south at Peter that will block 501 Queen Service (itself forced to divert and turn south at Spadina for water main construction) remains to be seen.

TTC Service Changes Effective May 8, 2016

May 2016 brings the first wave of seasonal changes as attendance at universities and community colleges drops, and demand for travel to parks ramps up for the summer.

The 101 Downsview Park bus will now operate on weekdays. This was formerly a seasonal service, but the change is now permanent and it will not be reversed in the fall.

Several bus routes get new early morning trips.  Individually these are small changes, but they illustrate how the city’s work day starts well before the subway opens at 6:00 am.

After several years’ absence for construction on Queens Quay, the Sunday afternoon PCC operation will resume between Victoria Day and Labour Day weekends. One car will run as an unscheduled extra from noon until 5:00 pm on 509 Harbourfront.

Route 501 Queen will divert around water main construction on Queen Street West from May until early October via Spadina, King and Shaw both ways with a replacement shuttle bus covering the gap. Route 510 Spadina will have extra running time to allow for the expected delays caused by the 501 diversion, and the short turn service will remain scheduled to Queens Quay rather than to Charlotte to limit turning moves at King and Spadina.

There is no information yet about special provisions to assist streetcars turning, particularly to and from Spadina, such as changes to traffic signals or use of police to manage traffic. Also unknown is how the congestion this diversion will cause will interact with the King Street closure for the film festival in September.

The 97 Yonge bus will be split with overlapping services running south from York Mills and north from Lawrence, and midday service between St. Clair and Davisville will not be operated. This is intended to isolate the effects of construction at Sheppard to the north end of the route, an arrangement used previously in 2014.

2016.05.08 Service Changes