Planning for SmartTrack

At its meeting of January 22, 2015, Toronto’s Executive Committee will consider a report (SmartTrack Work Plan 2015-2016) recommending a work plan for the study of Mayor Tory’s SmartTrack proposal together with other related transit projects. This is intended to dovetail with Metrolinx’ work on their Regional Express Rail (RER) network, and will have spillover effects on studies of both the Downtown Relief Line (DRL) and the Scarborough Subway Extension.

The most important aspect of this report is that, at long last, a study is reviewing transit options for Toronto on a network basis rather than one line at a time. Factors such as alternative land use schemes, fare structures and service levels will be considered to determine which future scenarios best support investment in transit. Rather than starting with a “solution”, the studies are intended to evaluate alternatives.

If this outlook actually survives, and the studies are not gerrymandered before they can properly evaluate all strategies, then the process will be worthwhile and set the stage for decisions on what might actually be built. The challenge will be to avoid a scenario where every pet project on the map is untouchable rather than making the best of the network as a whole. The term “best” will be open to much debate.

Continue reading

The Mythology of GO Transit “Fare By Distance” Pricing

At its recent meeting, the Metrolinx Board approved a GO Transit fare increase taking effect February 1, 2015.

A separate, but important topic, and one noticeably absent from the meeting agenda, is the question of regional fare integration. Another related matter is the relative roles of GO as a regional operator and the TTC as a local one to accommodate demand to the core area. The hybrid SmartTrack proposal is a bit of both — a GO Transit corridor running with station spacings more like a subway in spots, but at TTC fares.

The problem has always been that GO simply does not regard itself, or at least not until quite recently, as having a role as part of a unified network. Critically, the fare structure is rigged against short distance trips, and this has been getting progressively worse for a decade.

Continue reading

What Does Scarborough Transit Need?

At the risk of re-igniting the Scarborough subway debate, I am moving some comments that are becoming a thread in their own right out of the “Stop Spacing” article over here to keep the two conversations separated.

In response to the most recent entry in the thread, I wrote:

Steve: Probably the most annoying feature of “pro Scarborough subway” (as opposed to “pro Scarborough”) pitches is the disconnect with the travel demands within Scarborough. These are known from the every five year detailed survey of travel in the GTHA, and a point that sticks out is that many people, a sizeable minority if not a majority, of those who live in Scarborough are not commuting to downtown. Instead they are travelling within Scarborough, to York Region or to locations along the 401. Many of these trips, even internal to Scarborough, are badly served by transit. One might argue that the lower proportion of downtown trips is a chicken-and-egg situation — it is the absence of a fast route to downtown combined with the impracticality of driving that discourages travel there. That’s a fair point, but one I have often argued would be better served with the express services possible on the rail corridors were it not for the GO fare structure that penalizes inside-416 travel.

We now have three subways — one to Vaughan, one to Richmond Hill and one to Scarborough — in various stages of planning and construction in part because GO (and by extension Queen’s Park) did not recognize the benefit of providing much better service to the core from the outer 416 and near 905 at a fare that riders would consider “reasonable” relative to what they pay today. I would love to see service on the CPR line that runs diagonally through Scarborough, out through Malvern into North Pickering. This route has been fouled up in debates for years about restitution of service to Peterborough, a much grander, more expensive and less likely proposition with added layers of rivalry between federal Tory and provincial Liberal interests. Fitting something like that into the CPR is tricky enough without politicians scoring points off of each other.

The most common rejoinder I hear to proposals that GO could be a form of “subway relief” is that the service is too infrequent and too expensive. What is the capital cost of subway construction into the 905 plus the ongoing operating cost once lines open versus the cost of better service and lower fares on a much improved GO network? Nobody has ever worked this out because GO and subway advocates within the planning community work in silos, and the two options are never presented as one package.

With the RER studies, this may finally change, and thanks to the issues with the Yonge corridor, we may finally see numbers comparing the effects of improved service in all available corridors and modes serving traffic from York Region to the core. I would love to see a comparable study for Scarborough.

Meanwhile, we need to know more about “inside Scarborough” demand including to major centres such as academic sites that are not touched by the subway plan.

I will promote comments here that contribute to the conversation in a civil manner. As for the trolls (and you know who you are), don’t bother. Your “contributions” only make the Scarborough position much less palatable, and I won’t subject my readers to your drivel.

The Dubious Planning Behind SmartTrack (Part III)

In the first part of this series, I discussed The New Geography of Office Location, 2011, and then in the second part, its successor A Region in Transition, 2013. Now, I will turn to The Business Case for the Regional Relief Line, October 2013. All three papers were produced by SRRA (Strategic Regional Research Associates).

Only a 17 page summary version of the Relief Line report is available online, compared to the full versions of the first two. Considering the clear influence this series of reports has had on transit policy and the recent election campaign, the idea that

Detailed research is available to Investment Partners of SRRA [Page 1]

leaves a big hole in the range for public comment and review. I hope that Metrolinx will rectify this situation as part of whatever studies might take place.

My thanks to those of you who slogged through the first two articles.

Continue reading

The Dubious Planning Behind SmartTrack (Part II)

In the first article of this series, I examined a 2011 report about the shifting location of office development in the GTHA. Here I will turn to a follow-up report, A Region in Transition, from January 2013.

These reports provided the underpinning for the SmartTrack campaign proposal from Mayor John Tory. It is important that we understand just where this scheme came from and what it was  intended to accomplish by authors who, in some cases, lent their support to the Tory campaign and the SmartTrack brand.

Continue reading

The Dubious Planning Behind SmartTrack (Part I)

As I reported in a previous article, Mayor Tory has launched a study process for his SmartTrack scheme via Toronto’s Executive Committee.

One intriguing, if not surprising, admission to come out of this process was for Tory to admit that SmartTrack “was not his idea” and was simply a repackaging and rebranding of the provincial RER (Regional Express Rail) scheme. However, during the campaign, SmartTrack was regularly described as something that experts had studied, a solid proposal, not simply a line on a napkin.

The origins of a “Big U” looping from Markham through downtown and out to the northwest predates Tory’s campaign and can be found in three papers:

If we are to understand the claims made for SmartTrack, we need to understand its origins, and the degree to which campaign rhetoric and fantasy may have diverged from the earlier detailed planning. Also, of course, there is a basic question of whether the studies had the same goals for rapid transit network design as those that should inform the planning process in Toronto and the GTHA beyond.

This article reviews the 2011 paper on the changing location of office space in the GTA.

Continue reading

John Tory Launches SmartTrack Study

At the December 5 meeting of Toronto’s Executive Committee, Mayor Tory walked a motion onto the floor to launch a study process for SmartTrack in conjunction with various agencies and consultants. Of particular interest is paragraph 2:

2. City Council authorize the City Manager to retain the following specialized services to support the review of the SmartTrack plan:

a. the University of Toronto to support the planning analysis and required transit modeling;

b. Strategic Regional Research Associates for assessing development scenarios along the SmartTrack alignment; and

c. Third party peer reviewers of all SmartTrack analysis.

Paragraph 2.b refers to an organization, SRRA, which has been involved in proposals that evolved into SmartTrack before. Iain Dobson, a member of the Metrolinx Board, is listed as a co-founder of SRRA in his bio on their website. He is also listed as a member of the Advisory Board to the University of Toronto Transportation Research Institute.

I wrote to Metrolinx asking whether Dobson has a conflict of interest with the consulting work contemplated by Tory’s motion and his position on the board. Here is their reply:

Metrolinx has strong policies guiding Board directors and employees on conflict of interest

• This matter has arisen today and discussions are underway to determine what is the appropriate course of action, after gathering and considering the facts

• In considering this, the most important factor is protecting the public interest

• While a final direction is being determined, the Board director will not be involved in discussions involving Regional Express Rail and SmartTrack

[Email from Anne Marie Aikens, Manager, Media Relations]

Background reports that led to SmartTrack can be found on the Canadian Urban Institute’s website and on the SRRA Research site.

What is striking, in brief, is that SmartTrack arose from a desire to link many potential development sites, some on the fringes of Toronto, while ignoring large spaces in between. Moreover, the claimed ridership is based on a high level of commuter market penetration and a level of service more akin to the core area subway system than to suburban nodes.

I will review these papers in a future article.

Another Look at A Grand Plan

Warning: This post will be offensive to those with sensitive egos.

In recent months, probably thanks to the election campaign, I have acquired a few “followers” who have enough working brain cells to put together rants on a daily basis. They decry my antipathy to anyone-but-Chow, subways, SmartTrack, and various other schemes claiming that I am eminently unqualified to run this blog. One regular writer even claims that I should “resign” so that some more enlightened soul can be “elected” by the readership to mind the store.

One wonders what part of a personal domain name this person (or persons) does not understand, or the idea that the marketplace will determine whether writings here have credibility and influence.

Those with nothing better to do but criticize almost certainly have not put in the decades of watching, commenting, advocating, consulting and even occasionally getting paid (!!!) for their thoughts on transit. Early in this blog’s history, back in March 2006, that little agency called “Metrolinx” did not yet exist, and in anticipation of its creation, I wrote an article about how the region’s transit should evolve.

I gave credit to other organizations, notably the Toronto Board of Trade, as well as the army of professionals and amateurs with whom I have discussed transit over the years.

The plan included:

  • Much more extensive use of the rail network for improved GO service.
  • Much improved service on the surface bus and streetcar network including an increased bus fleet and purchase of an accessible low-floor streetcar fleet.
  • An Eglinton LRT line including an underground section from Leaside to Keele including service to Pearson Airport.
  • A Don Mills / Waterfront east line [Since 2006, I have come to think that a full subway would be better south of Eglinton as the line would be entirely grade separated anyhow. As for the waterfront, the planned development between Yonge and the Port Lands is now much more extensive and requires far more than a DRL or SmartTrack station to serve the entire site.]
  • Various other LRT lines including one in the Weston corridor using the space that has now been consumed by the UPX trackage.
  • A Yonge subway extension north to Steeles.

… and much more.

The plan isn’t perfect. My opinion of some lines has changed over the years, but the basic premise has not. Toronto must think of transit as a network with many parts, not just a bauble here and there to get someone through an election, or a showpiece for one municipality or transit operator.

Yes, I’m an advocate for LRT, a mode that other cities were building while Toronto wasted four decades on the anything-but-LRT attitude that dates back to Bill Davis. I make no apology for that, and only wish we had built more over the years rather than pursuing pipe-dreams and fighting over the selection of new routes.

By now, we could have had a network of LRT lines plus frequent GO service in two or three corridors serving Scarborough. What we got was the Toonerville Trolley to STC.

Some folks see me as a critic, a nay-sayer who denigrates new plans and opposes “progress” (a word that usually means building what they want). I have seen plans come and go, a lot of false starts, and too many cases where small-scale, short-term thinking wasted opportunities for real progress on transit. Far too many hobby-horses, far too much vote-buying, and far too much fiscal fantasy about something-for-nothing transit systems.

So the next time you feel like leaving a really snotty comment here about how I don’t care about anyone outside of downtown, how I am single-handedly responsible for the decline of civilization as we know it, take a few moments to polish off your resumé. Tell us all what you were doing for the past 40 years, and how carefully you have thought about the transit system. Then start your own website.

John Tory’s “SmartTrack”: Will That Train Ever Leave The Station?

Late in May, John Tory launched his “SmartTrack” transit line, the centrepiece of his “One Toronto” plan. Media reps gathered for a preview at the Metro Toronto Convention Centre, and the launch was handled almost entirely by Tory’s staff. All of the background papers are on the One Toronto website, and little has been added since that event.

Even then, in the early days of the campaign, there was good reason to distrust Tory’s grasp of his own proposal, let alone a willingness to engage in debate, when he made the briefest of appearances for a canned statement to give the media clips for the news broadcasts, but answered few questions.

I was modestly impressed that at least a Mayoral candidate was not just thinking at the ward level for a transit proposal, but felt the plan was rather threadbare — a single line to solve almost all of Toronto’s problems.

Wearing two hats that day – as both reporter and activist – I was scrummed by the media for comments, and the Tory campaign chose to lift one phrase out of context as an “endorsement” for SmartTrack that remains online.

Steve Munro, Toronto Transit Blogger, said, “This is very much a refocusing of what transit in Toronto should be.”

What I was talking about was the need to look at the region and at trips to points other than the corner of Bay & Front and times other than the traditional commuter peaks. As to the specifics of SmartTrack, I was rather less complimentary.

In brief, SmartTrack would see electric multiple unit (EMU) trains operating primarily on GO Transit corridors between Unionville on the Stouffville line and Mount Dennis on the Weston corridor (the Kitchener-Waterloo line). At Eglinton and Weston, the line would veer west along the former Richview Expressway lands to the Airport Corporate Centre, but not to the airport itself.

The route would charge regular TTC fares with free transfers to the existing system, and with frequent all-day service at peak levels of every 15 minutes. Over its 53km it would have 22 stations, and might, according to the campaign, carry over 200,000 passengers per day.

Continue reading