Humber (Long Branch) Loop

Sitting on the Long Branch car’s side of Humber Loop. At this time, the QEW/Gardiner bridge at the Humber River was being realigned, and streetcar operation through the underpass was on a single track with block signals.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s