The Dubious Planning Behind SmartTrack (Part III)

In the first part of this series, I discussed The New Geography of Office Location, 2011, and then in the second part, its successor A Region in Transition, 2013. Now, I will turn to The Business Case for the Regional Relief Line, October 2013. All three papers were produced by SRRA (Strategic Regional Research Associates).

Only a 17 page summary version of the Relief Line report is available online, compared to the full versions of the first two. Considering the clear influence this series of reports has had on transit policy and the recent election campaign, the idea that

Detailed research is available to Investment Partners of SRRA [Page 1]

leaves a big hole in the range for public comment and review. I hope that Metrolinx will rectify this situation as part of whatever studies might take place.

My thanks to those of you who slogged through the first two articles.

Section 1. Background

The report begins with a clear statement of its origins:

The “Regional Relief Line” (RRL) was first developed in 2009 by Real Estate Search Corp and the CUI resulting from the research conducted in the study known as the “New Geography of Office Location”. This research showed that the location of employment had shifted from the centre of the City to several suburban nodes and employees in these nodes had no alternative to the automobile. [Page 1]

[For clarity, “Real Estate Search Corp” and SRRA have overlapping membership and should not be considered as separate entities in this context.]

From the first two reports, we know that the problem of how to serve suburban office development was a great concern, but no specific solution was put forward even though, according to this text, one was already being developed.

In a truly breathtaking claim, we read:

The new approach to solving congestion had to include reaching beyond the 416 and relieving congestion on the highways in the 905 as well as relieving transit congestion downtown. By identifying the route which forms the RRL the authors believed that the majority of the suburban auto congestion and the downtown transit congestion could be addressed in one high value project. [Page 1]

This is one of the more creative pieces of writing I have seen from a planning consultant during my long years watching transit issues. The idea that any one line can solve highway congestion in the 905 and transit congestion downtown presumes that it also addresses many choke points on the regional transportation network. Quite bluntly, that is a physical impossibility, and it should not require many paragraphs of detailed explanation as to why. In brief there are large areas in the regional network that are nowhere near the catchment area of this “relief line” and they cannot be affected by its implementation.

In another interesting claim, the report states:

The findings of the research as of October 2013 were provided to the Transit Investment Strategy Advisory Panel (TISAP) headed by Anne Golden co-chaired by Paul Bedford and included SRRA co-founder Iain Dobson. Much of the core evidence and conclusions from this study helped form the many recommendations of the panel which address the issue of creating high value, high capacity, and high ridership transit. [Page 1]

Well, no, actually, it did not. From my own conversations with Paul Bedford, I know that there was some discussion of “The Big U” which was the name used to describe the proposed Relief Line (to distinguish it from “The Little U” which we all know better as the “Downtown Relief Line”). However, the Advisory Panel’s mandate did not include making alterations to the Metrolinx Big Move, only to discuss how whatever transit projects might be built would be funded. Iain Dobson is now, but was not then, a member of the Metrolinx Board, and was an unofficial advisor to former Minister of Transportation Glen Murray.

Section 2. Introduction

We begin with another sweeping claim:

The “Regional Relief Line” (RRL) connects the majority of the Region’s office employment clusters, offering employers and employees an unprecedented degree of mobility choice, considerable reduction in commute time, significant congestion relief in the 905 and the downtown core. It further permits growth of employment in established nodes creating the necessary conditions for the Region to remain competitive.

The RRL delivers extraordinary value for public investment by creating solutions to congestion in by transit terms and has the potential to be implemented quickly without disrupting other transportation options. It will generate over 500,000 new riders within 5 years of commencing operations. It generates this high value by transforming a series of individual rail-based corridors into a cohesive, high speed, high frequency transit system. The RRL will connect to and incorporate the following existing projects or projects under construction to create the most important interconnected network possible for relieving congestion. [Page 2]

As we know from the earlier reports, the focus was on a number of nodes notably the 404/407 office cluster, the Airport Corporate Centre, the core and its satellite “brick and beam” districts. We also know that other potential nodes were systematically ignored on the basis that they were stagnant, even though they might already have substantial transit demand. The overwhelming consideration was to provide more transit to make office parks more viable as sites of greater development.

The claim of half a million new riders is quite a stretch, but I will leave that until we come to more details later in the report. To put this in context, daily TTC ridership is about 1.8 million distinct rides, and this probably translates to something like 750-900k individual riders. Getting 500k new transit riders (never mind those who may already be on transit) would be quite a feat.

Important words here are “high speed, high frequency transit system”. However, what is proposed is not a system, but one line, and both the speeds and frequency proposed (a) bear no relationship to what is practical or reasonable, not to mention (b) being significantly more aggressive as a transit operation that what was proposed in SmartTrack. That’s an important distinction because some of the claims for the RRL found their way, unchanged, into claims for SmartTrack, notably ridership estimates.

The line is purported to give many new options for travel on a variety of routes including some local streetcar lines. In fact, the RRL only crosses these lines, and not necessarily at a station. The degree to which it would provide an alternate path for the local type of travel taken on these routes is minimal.

The unique opportunity to serve employment destinations at either end of the line will result in highly productive passenger loads on trains in BOTH directions. This has only been successfully achieved in a few transit projects in the history of transit. [Page 2]

Without question, the holy grail of any transit planner is a route with bi-directional demand where what might otherwise be a low volume counterpeak move actually carries passengers. We can see this any day on the King car that serves a variety of neighbourhoods and does not exist simply to bring people downtown.

However, it is one thing to sit at the bottom of a funnel in the core of Toronto at Union Station collecting riders from several widely-space origins, and quite another to connect outward to a suburban node. For starters, many (most?) of the people working at those nodes will originate either beyond the end of the RRL, or they will come from directions it does not serve (e.g. east and west of a node in Markham). They will certainly not go out of their way to take a route that does not serve their trip unless it offers a massive advantage.

RRL will provide high frequency, high capacity and high speed transit service to car-dependent office employment clusters in Mississauga and Markham. These two clusters already have enough ridership potential (150,000 jobs in each) to make the RRL an instant ridership success and provide immediate congestion relief in the two busiest suburban areas of the Region. [Page 2]

However, the 300,000 jobs (and note that these are potential jobs, not existing ones) will not all be commuters from south of Markham and from east of Mississauga.

As for the core:

In Toronto’s Financial Core – already well serviced by transit – the line will offer significant relief to overcrowding on the Yonge line. Transit commuters will have the choice to go directly downtown from the ends of the Danforth and the Bloor subways in less than half the time or transfer from the busy Queen and King Street car or use the new crosstown LRT at Eglinton to access the core from the east or west – all for the same fare. The line will also allow employment growth to occur at “shoulder” nodes such as Liberty Village and the Lever Bros site, permitting continued growth of the core’s employment districts.

For starters, the reference to the “ends” of the Danforth and Bloor subways implies that the route will take the CPR/GO Milton corridor passing by Kipling Station. This is quite different from the Weston/Eglinton route proposed by SmartTrack and shown in the RRL map later in the report. Next, the viability of a transfer to RRL at Kennedy or Kipling presumes that (a) the service is frequent enough that a less direct transfer connection is tolerable and (b) that riders are destined for somewhere served by the RRL. We all know of the anguish caused by the SRT to subway transfer at Kennedy, and moreover, once the Scarborough subway opens, riders would need a strong incentive to get off trains westbound at Kennedy to transfer to the RRL. Kennedy will no longer be the end of the line.

(By the way, a Kipling connection aligns better with the “Big U” discussed by Paul Bedford that would have operated via the GO Milton corridor in the west end. Possibly someone had second thoughts about this idea, and switched to the Eglinton alignment, problems and all, closer to the publication date.)

Next, we see that the Lever site finally makes an appearance. Between it and Liberty Village, we now have potential relief for office space growth in the core. This was an explicit concern of the earlier reports that treated the core as if it were almost “full”.

Transferring from the Queen or King lines to the RRL imposes a time penalty both on the rider for transferring, and on the RRL itself for providing more local stops. Moreover, the riders have to be bound directly for Union Station because otherwise they would be better off just staying on their streetcars.

The RRL enables the network to add over 250,000 commuters during both the morning and evening rush hours, … [Page 3]

These are added riders, but we are also diverting traffic off of the existing network, and so the total ridership must be even higher. That 250k showed up in the SmartTrack campaign material, but for a service with comparatively short trains running every 15 minutes. Some basic math is in order.

  • If we assume a four-car train with a design capacity of about 650 (that’s roughly equivalent to a train on the Sheppard subway), we are looking at 2,600 passengers per hour at the peak point for the proposed SmartTrack headway.
  • Assuming that there is both a west side and an east side “peak”, and that we are able to attract an equal demand outbound, we might get up to around 10k/hour if the trains are full on both legs in both directions.
  • Generously, there are six peak hours per day, and so that gets us to 60k riders. If the off peak period carries (over more hours) an equal demand (the TTC actually carries about 60% of its riders off peak), we are now at 120k daily riders. This is far short of 250k, let alone the combined total of the new and existing demands that appear to be presumed.

Then we come to the question of travel times:

Most significant will be the time saved by commuters coming to the core from places like Rexdale and Etobicoke in the northwest and Scarborough in the northeast; all these commuters will enjoy a 50% reduction in travel time and convenience. [Page 3]

The exact calculation of this saving does not appear in the report, but it is likely that it applies only to the leg of the journey actually taken on the RRL, not to the full trip that will almost certainly include a bus feeder. Also, as we will see later, the claimed speed for RRL greatly exceeds what is practical given the station spacing and track geometry of the lines it would use.

In this Nirvana, the RRL will have, among other benefits:

Created two-way peak traffic where fare revenue will exceed operating costs allowing for the elimination of operational subsidies. This will afford transit planners greater financial ability to continue to expand the system instead of subsidizing transit solutions with sub optimal ridership.

Reduced commute times by at least 15 minutes and in some cases over 45 minutes for over 250,000 commuters improving the quality of life for employees.

Given high speed access (maximum commute of 45 minutes) to employment for over 750,000 people, a benefit to employers making expansion more competitive in the Region. [Page 3]

Anyone who tells me they are going to make money on transit is immediately suspect, and the challenge here is that this is a claim that can blind gullible readers (for which read politicians) who leap at the thought of a project they can announce, but won’t have to pay for.

Partial capital funding will come from beneficiaries of its services. [Page 3]

This is an echo of the financing scheme for CrossRail, and it makes big assumptions that there will be buy-in from affected property owners.

And by the bottom of page 3, we have:

The RRL will have unlocked the capacity of businesses to grow, people to get to work with many choices, and increase the capacity of the entire Region Transport system by over 20%. Estimated new ridership is 500,000 passengers per day.

Sounds marvellous (but is that 500k passengers, or 500k riders — they are not the same thing), but it all depends on running a service that can actually attract and carry them.

In previous articles, I have not reproduced the illustrations because they were too numerous, but it’s worth putting the RRL map here for reference. [Source Page 4, click for a larger version.]

RRLMapc

Here we clearly see that the RRL does not go near to Kipling Station, and using it would require transferring closer to the core at Dundas West where the time saving would be rather less than a transfer at Kipling. The RRL also makes that turn west onto Eglinton in Mt. Dennis which has been the subject of some discussion in the SmartTrack context.

Section 2.1 About the Regional Relief Line

This type of transit solution is called a “surface subway” because it moves quickly between stops unimpeded by other transit or pedestrians, and carries as many as 70,000 people per hour. [Page 4]

70k/hour you say! Amazing! And with what technology? Service frequency?

The RRL will operate through a 62.8 km of rail on the surface. Two additional parts of the system can be added at a later date to further improve the project and they will be underground. Those options are underground subway components (10.47 km) under central Toronto and the airport. These two additional high value parts of the project can be phased in as required. [Page 4]

During the election campaign, there was some debate about whether “SmartTrack” included any tunnels, but this question focussed on the difficulty of the Eglinton West leg. Now we can see that RRL has tunnels, but not on Eglinton West. They are an airport link north from the Airport Corporate Centre, and a future tunnel through downtown as a bypass for congestion at Union Station. The link from Weston’s rail corridor to the airport is quite definitely on the surface on the RRL map.

We also learn that the Meadowvale to ACC leg of the RRL would unlock the growth potential in the Airport Corporate Centre. This presumes that the majority of the net addition of commuters could reach the ACC via the RRL. More generally, we learn that the RRL will open up many areas to redevelopment along its route. [Pages 4-5] That is possible only for land adjacent to stations, and more stations means slower trains, a tradeoff the report does not explore.

Where Do Those Capacity Numbers Come From?

I have to jump out of sequence here because so many of the report’s conclusions depend on the speed of the line, the frequency of the service and its total capacity. For this we must jump ahead to section 2.5 New Trains and Stations starting on Page 11.

The rolling stock, a new high speed electric train which looks and feels very much like the new subway cars on the TTC, will be assembled in Ontario, built tested and delivered in a similar manner as the rolling stock for Crossrail in the UK which allows for the cost effective delivery of the rolling stock over time and the provision of new capacity as the system grows. Benefits of the new Rolling Stock are speed, comfort, flexibility and safety. They have the capacity to be lengthened as need be. Initially they will run on 5 minute intervals at peak hours but increase frequency easily and cost effectively as demand grows.

The new trains are being designed to meet the needs of passengers Greater Toronto Area. They will travel at speeds of up to 160kmh thereby delivering fast cross town service. Critical to increased speed is the spacing between stations, which is why stations are on average more than 2.5 kms apart. They will be electric and organized by the world`s most advanced signalling system allowing the frequency of service up to every 90 seconds if demand requires. Initially frequent (less than 4 minutes between trains) service can be delivered at peak demand times, while less frequent as demand reduces.

With Crossrail rolling stock as the model, we launch into an operating model of 5 minute headways initially (12 trains/hour, or 3 times the capacity proposed for SmartTrack) or is it a less than 4 minute headway as claimed in the next paragraph?

As for 90 second headways, that will not happen unless these trains have completely exclusive right of way for reasons that have been discussed at length here before. Conventional rail traffic cannot co-exist with a rapid transit operation, especially an automated operation needed for very frequent service.

The experience will be similar to the new TTC subway cars, only they will carry slightly more passengers with more seating and travel at twice the speed. [Page 11]

As for speed, 160kmh is faster than GO trains except, possibly, on a few stretches with widely spaced stations and a high track speed. At the RRL station spacing, especially east of Union, it would be impossible to run this fast because trains would be stopping before they reached top speed. Also, operation at this speed on the shared GO network would have implications at stations RRL did not serve, and would place demands on track geometry that may not be physically possible to build.

Now let’s go back to where we left off:

Section 2.2 Benefits of Phased Delivery

The report proposes that RRL be implemented in stages:

1. Markham to Union

The report claims a travel time of 21 minutes from what is now Ellesmere Station to Union via RRL. The overall travel time is about 40 minutes from Markham to Union (implied by the text) as compared with 47 minutes for GO trains today. The authors compare this to a small saving available to users of the Scarborough Subway (amusingly setting up a competition between the two routes which, in today’s political climate, will both be built). Of course, the last time I looked, Ellesmere Station is not at Scarborough Town Centre, and one must add the access time for the roughly 2km jaunt eastward.

A major issue for the Markham end of the line is that the rail corridor is somewhat distant from the actual job centre. This link would depend on the York VIVA BRT network, a rather odd way to deal with inbound traffic to a major employment node, and a chunk of the commuting time about which the report is silent.

2. ACC to Union (2019)

This is the most problematic for RRL and SmartTrack because the authors don’t know what they are talking about here.

This phase will take a little longer to complete than the Markham phase because there are no tracks on the section from Mt Denis to the Airport Corporate Centre. This right of way will take longer to design and obtain approval in an EA process. It is owned by the Province and was intended to be an expressway.

There is ample room for the dedicated right of way. [Page 6]

The right of way is not owned by the province, but by the City of Toronto which has been selling it off for new housing developments. There is not ample room for the dedicated right-of-way.

Note that this claim implies that the line would not be underground because otherwise it would not require a right-of-way. This is the same location where surface LRT operation was met with great hostility, in part because of bad design for LRT/traffic intersections. They should have lots of fun with a high speed RRL train that will need a well-protected corridor.

At no point is it explained how the line will get from the Weston rail corridor to the former Richview Expressway lands on Eglinton that begin west of the Humber River. I discussed this in some detail in my review of John Tory’s SmartTrack line.

3. Meadowvale to Airport Corporate Centre (2021)

This corridor from ACC to Meadowvale runs parallel to the 401 highway and connects the Hurontario LRT and Go Lines to employment areas currently containing over 100,000 commuters. The 401 highway is the most congested roadway in the Region, with all commuters completely auto-dependent. This is also a heavily travelled trucking corridor which needs to be freed up for the movement of goods and services. [Page 6]

If capacity is needed for trucking, this must occur on more than a comparatively short stretch of the 401. Only commuting traffic that is actually diverted onto RRL counts against such a benefit, and one must ask whether the highways would simply backfill with latent demand.

4. Wellington Street Union Relief Subway (2022)

This phase would shift the RRL into a dedicated subway from west of Bathurst to Broadview. For the benefit of readers, this is similar to the alignment I have often advocated for the DRL subway.

This tunnel, whatever runs in it, will be one of the most complex parts of any new cross-downtown line. It is intriguing that it magically can be in service in less than a decade under this proposal when a similar structure for the DRL almost certainly would have a much longer claimed delivery date.

5. Subway Connection to Pearson (2024)

This phase would see an underground branch off of the RRL to directly serve Pearson Airport. Of course the same service, as a surface operation, was proposed as part of the Eglinton LRT.

And so, yes, gentle reader, we could have all this in a mere 10 years if only we started today.

Section 2.3 Future Demand

The forecast growth in the GTA is quite substantial with 3 million more people living here by 2036. This represents a huge growth in travel both for work and for other purposes. Transit demand is expected to rise by 45%. This sounds impressive, but not quite so when put beside a projected 50% increase in regional population.

Even with RRL and its claims, we would not be keeping up. Moreover, many parts of the GTA would not be served by RRL. It is designed primarily around a handful of development nodes, and if it serves anything else, that’s o-by-the-way.

If we are really talking about that scale of population growth, and we intend to increase transit’s share of the market, we will need much more than one new RRL route. Moreover, it can only make a dent in the demand provided it operates as a rapid transit line, not as a now-and-then commuter rail system. There lie the two challenges: changing the operating rules for the rail corridors in general, and recognizing that large-scale improvements to transit will be needed throughout the region.

Unfortunately, thanks to the absence of details, the claims of large scale reductions in present congestion are unsupported by information such as demand models, and there is no discussion of the degree to which vacated capacity will be backfilled rather than bringing an actual reduction in congestion.

Preliminary calculations put the number of cars which will be initially taken off the road on a daily basis at 70,000. This is a number which will have an exponential impact on mobility of the highways of the Region and will reduce congestion significantly. [Page 11]

We are going to carry 250k riders in each of the peak periods, but we are only going to reduce car traffic by 70k? The key word is “initially” and it gives some sense of the early days riding and benefits that are anticipated rather than the much grander numbers for a full buildout.

Section 3. The Economic Case for Regional Relief Line

This section depends on some of the questionable techniques we have seen in Metrolinx “benefits/business case analyses”. The first and most obvious is that the construction cost and effort is counted as a benefit. That is a misleading premise because it completely avoids the question of whether spending $X billion is the best use of the money, and not just within the limited scope of transit alternatives. I can create economic stimulus simply by handing out $20 bills, a tactic already employed by one recently retired Toronto Councillor.

Spending extra billions because someone has their heart set on a more expensive option is not necessarily the best investment of public funds.

The report claims that there is

a cost benefit ratio of 2.5 to 1 making it on a par with the most valuable transit projects in the world [Page 12]

At this point we are at pure fantasy because the assumptions behind this claim are not published. With the grandiose claims made for the success of this project, it is no wonder it has a high ratio. Is this genuine, or are we talking Florida swamp land? This claim really needs detailed review, and the numbers should be in the public domain. There should be no “commercial confidentiality” about estimating the cost and benefits of a public investment on this scale.

There is no question that improved service levels and quality on the GO network will have a major effect on its attractiveness and on travel patterns within the GTA. However, there is no one magic solution, and claiming that the RRL or whatever we call it can be the one project that makes all others unnecessary is a simplistic attempt to highjack the discussion for one favoured project and for the land developments it will support.

Metrolinx is supposed to be planning regionally for all of the region, not just for those corners where a rail corridor conveniently strings together development sites of interest.

After the detailed planning background in the Geography and Transition reports, the so-called Business Case for the Regional Relief line is almost a parody, the kind of sloppy, half-baked paper one expects from amateurs, not from professionals. Metrolinx and Mayor Tory should be wary, and should review the claims made for RRL/SmartTrack with care.

55 thoughts on “The Dubious Planning Behind SmartTrack (Part III)

  1. Steve:

    It is very important to remember that the provincial interest is in the $2.7b Tory claims to bringing to the table, even though Council is nowhere near authorizing this.

    At Council on December 11 John Tory made a very clear point that bringing money (well, the promise of other people’s money) to the table meant that the city would “have a say” in how RER/SmartTrack is built.

    And here I thought the city had gotten a very strong say in how the Crosstown was going to be built without putting up any significant money … why the need to “have a say” for an RER network that will really make very little difference inside the 416 boundaries … since the stations will be “GO” type stations, the majority of which are not in the most walkable areas or the ones that are easily accessible by transit.

    Cheers, Moaz

    Like

  2. Malcolm N:

    “Having Mirabel airport named after you would be a slap, Malton or Dorval however, well that is another story.”

    Dorval was named after Trudeau, who gave us Mirabel. Perhaps we should re-rename Line 1 to “the Layton-Lastman Line”

    Like

  3. Moaz Yusuf Ahmad said:

    “… why the need to “have a say” for an RER network that will really make very little difference inside the 416 boundaries … since the stations will be “GO” type stations, the majority of which are not in the most walkable areas or the ones that are easily accessible by transit”

    I would think that if the city gets more involved in the RER planning, it will be able to make the route and station designs more useful for trips within 416.

    Like

  4. Michael Forest said:

    “Moaz Yusuf Ahmad said:

    “… why the need to “have a say” for an RER network that will really make very little difference inside the 416 boundaries … since the stations will be “GO” type stations, the majority of which are not in the most walkable areas or the ones that are easily accessible by transit”

    I would think that if the city gets more involved in the RER planning, it will be able to make the route and station designs more useful for trips within 416.”

    I would certainly hope so. This is not true just within 416 but beyond, in terms of those transit agencies. The RER/GO system, needs to be structured to be a long haul extension of local transit. That means, bus, LRT, BRT and subway all have to integrate better than current, if the RER is to have its proper effect. Otherwise, for it to make a sufficient difference, every stop is going to require very large parking lots. I do not believe that seeing many acres devoted to parking is really a reflection of best planning.

    Like

  5. Mark Dowling said:

    “Malcolm N:

    “Having Mirabel airport named after you would be a slap, Malton or Dorval however, well that is another story.”

    Dorval was named after Trudeau, who gave us Mirabel. Perhaps we should re-rename Line 1 to “the Layton-Lastman Line”

    I would not disagree, however, to be frank I have never been sure, given the disaster that was Mirabel, why Trudeau was honoured with an Airport. The recognition should at the least been done somewhere else, not an Airport in Montreal.

    Like

  6. Michael Forest said:

    I would think that if the city gets more involved in the RER planning, it will be able to make the route and station designs more useful for trips within 416.

    I would think so too. But I don’t think that needs to cost $2.7 billion.

    Cheers, Moaz

    Like

  7. Steve said:

    “What is also amusing about the “Business Case” report is that it talks about the RRL vehicles as if they are already being designed with a view to imminent manufacture. Somebody either has their verb tenses screwed up, or there’s a nice example of Bombardier getting ahead of themselves on product development. Now if only they could just deliver orders we have already placed …”

    Oddly Steve, I was reading a piece on the Crossrail (which I gather much this stuff is based) in the Globe yesterday that got me frustrated.

    As a consequence, since I could not handle the fawning words used in the article, I did a little reading on the actual Crossrail project itself. The Crossrail site seems to be talking about 24 trains per hour and train capacity of 1500 riders per train and train lengths of 200 metres (the combination of which makes a great deal of sense).

    I wish that everybody would start discussing things in the same terms, or declare their forms of measurement. Discuss ridership capacity in terms of past a fixed point, and in a single direction. If you are going to discuss total use, please note this, and make it so it can be understood.

    Impact on other lines, roads and buses is all affected, based on load through given points. Bus ridership for instance could be 6000 per hour on a single line served by a bus every 5 minutes, however, clearly this is not past a single point, and would not represent the equivalent of 4 lanes of traffic, as the riders are clearly not passing a single point. {Many riders on a long line getting on riding a couple of stops and getting off} A study to justify a new line that will not declare riderships in terms of over the portion of the line in question it is achieved, and capacity in terms of past a single point, is entirely a marketing piece, and should not be given credence.

    P.S. And in a representative democracy, politicians should be acting as skeptical critics, who seek real answers, and how this will serve the city. They should not be acting as cheerleaders.

    Like

  8. Malcolm N said:

    A study to justify a new line that will not declare riderships in terms of over the portion of the line in question it is achieved, and capacity in terms of past a single point, is entirely a marketing piece, and should not be given credence.

    This was the point I regularly made while in Malaysia where we were constantly told by the proponents of rail projects that their line would move, say, 400,000 passengers per day.

    My typical response was, “yes, but how many passengers would the line really move … you know … at the time (peak hours) when it actually counts?”

    Sadly they never answered. I couldn’t even get a generalization like the percentage share of peak hour trips out of an entire day.

    Cheers

    Like

  9. Once again someone has brought up the idea of using dual power, straight electric-diesel electric, locomotives as built by Bombardier for Montreal and New Jersey. I am against this idea for a number of reasons:

    1) The locomotives are too expensive, $15 million each versus around $5 million for. Diesel.
    2) Locomotive hauled trains, even straight electric, do not have the acceleration rates needed for short stop spacing.
    3) The Locomotives do not have enough power in the diesel mode to haul more than 8 car trains and all of GO’s are 10 cars with many changing to 12 cars.

    I have been going over a New Jersey Transit document on the operating characteristics of their new dual power Bombardier ALP45DP locomotives. These locomotives with an eight car train of dual level coaches have a maximum speed in electric mode of 125 mph and of 100 mph in diesel mode. They have a maximum power at the wheel of 5360 hp in electric mode and of 3600 hp in diesel. In either mode their starting tractive effort is 71,000 pounds of force. These locomotives cannot run a 12 car train in diesel mode because the head end power for heating etc. would reduce the power at the wheel to around 3200 to 3300 hp which is too low. Unlike the GO locomotives they do not have a separate generator for hotel power.

    In diesel mode it would take the dual power locomotive about 110 seconds to move an 8 car train one mile from a stop versus 130 seconds for an EMD GP 40 PH, similar to the type of locomotives GO used two iterations back. They do not give stats for 12 car trains but it would take at least 50% longer to travel the same distance. In electric mode the dual power locomotives would take about 90 seconds to travel one mile with eight cars. A train of EMUs would take just over 70 seconds to travel one mile from a stop at 10 hp/ton power to weight ratio.

    The maximum braking effort in regenerative mode, the one that pumps electrical energy back into the overhead, is 34,000 pounds of force so not much energy could be recovered at the braking rates needed for short stop spacing.

    The use of EMUs would have many benefits over electric locomotive hauled trains on a Regional Express Rail type service. These include:

    1) better acceleration and decelerations rates giving shorter trip times.
    2) the need for fewer trains and crews because of 1).
    3) the ability to change train lengths more easily by adding or removing cars as needed.

    EMUs should mainly be four car units of motor-trailer-trailer-motor with the possibility of two car sets of motor and trailer. The trailers would not have a control cab as that would make them locomotives and subject to the 92 day inspection rule. Equipping the cab ends of the cars with automatic couplers that also make air and multiple unit control connections would allow trains of 4, 6, 8, 10 or 12 cars to be made up quickly. If cars were uncoupled at a yard there would be no need for a hostler locomotive to take them away as they are self-propelled. There would still need to be a brake test but there would be no need for train personnel to couple or uncouple brake hoses and control cables.

    While it would be nice to run everything high platform as this would speed up loading and unloading I cannot see this being easily achieved and there are a lot of bi-levels with a lot of life left in them. A number of the newer cars could be converted into cab motors by putting a cab at one end, placing the transformers and electronic controls in the cab end where the mid-level seating now is. They would need motorized trucks installed but their trucks could be swapped out for older trucks in equipment that is kept as trucks tend to wear faster than the rest of the coach. All of the remaining cars could be used as trailers between motorized cab cars or behind locomotives. This would allow for maximum fleet flexibility.

    I realize that this does not meet John Tory’s requirements for SmartTrack but it [ST] is not buildable as he foresees it without major changes to Transport Canada regulations. The UPX line would still be a problem as it has high level and short platforms.

    Like

  10. @Robert Wightman, surely John Tory will see that to achieve what he wants the tracks in question must be “abandoned”, and push for their conversion to transit as they are electrified. This would seem impossible on Lakeshore, but surely on Stouffville and UPX it would be. If that were the case loading/unloading becomes the major issue and 6-7 minute headway (allowing 4-5 minutes for loading or unloading) should be possible (after we get around Lakeshore east). I would think that would be plenty of capacity for now – 16-18k.

    Steve: CN retains running rights for emergencies on the GO trackage, and there is also the matter of co-exitence with VIA. There are parts of the GO network where freight will always remain part of regular operations, and not just at three in the morning to avoid conflict with RER operations.

    Like

  11. @Steve yes, there is no way you will get freight and Via out of the balance of Kitchener or Lakeshore lines. I would hope with lots of begging you could get time separation in Stouffville, and get completely separate tracks in UPX (free of crossing problems). Of course without space on Lakeshore east Stouffville means little.

    Like

  12. I will chime in with one observation on the practicality of SmartTrack …

    If we agree that to realistically implement anything along these lines requires fundamental changes to mainline operating rules, and agree that these changes are otherwise desirable Tram Trains become a possibility. So far as I can see getting from where we are today to European like standards is a much bigger leap than Tram Trains are from those Euro standards. In other words, it looks to me like if we are going to fight for reform we might as well fight to go all the way and get all options on the table.

    This is significant because if Tram Trains ARE possible suddenly the whole Eglinton spur makes a lot more sense. It could then be built essentially as planned for light rail, though presumably more grade separated given the politics of the things. With vehicles operating to light rail standards the curve in Mt. Dennis becomes a lot less intimidating, as do things like connecting directly to the airport and integrating with a larger network.

    It would make SmartTrack inversion of traditional Tram Trains, using the main lines on the inner portions of the route rather than breaking off onto streetcar tracks centrally, but it does seem a real option to bring the various visions much closer together than they could otherwise be.

    Steve: This is a classic example of taking an unlikely premise to convert a dubious proposal into a superficially reasonable argument. The problems in Mount Dennis are wished away simply by adopting a new technology for the route, rather than addressing the more basic question of why we should take the western leg of SmartTrack along Eglinton at all.

    Like

  13. @ECarlson, if we are going to change the rules, I would suspect Hydro would be an easier place to start. What needs to be focused on is what a good network model would spit out as the priority routes. These are what should be on the table anyway. I suspect that would be, Finch West LRT, LRT in SRT, Morningside and Sheppard, DRL, LRT extension on the Crosstown, and RER in UPX and Stouffville.

    I would be thrilled to be proven wrong by an unbiased model run based on a resource constrained network modelling of best system to support highest transit useage and best rides, unskewed for odd land use assumptions or electoral boundaries, provided of course those real results formed the basis of a real and ongoing transit program.

    Like

  14. “What needs to be focused on is what a good network model would spit out as the priority routes.”

    No argument there, but I have had a nagging suspicion since SmartTrack appeared that assuming an extension to Square One (and assuming it on either an Eglinton line or something SmartTrack like) through running downtown from Mississauga and out Eglinton might perform very well.

    Like

  15. @ECarlson, if that were the case a Crosstown extension should do virtually as well, with a transfer at Mt Dennis. However the notion of having BRT buses running through to Mt Dennis might also be an option until the Crosstown is extended to Renforth or beyond. Possibly even initially this portion could be BRT nearly immediately given the much smaller budget required. This would allow Mi-way to link to Crosstown and RER, while greatly improving TTC service on Eglinton West while awaiting Crosstown extension.

    Either LRT or BRT has the advantage of not requiring special rules for the GTA. Also since much of the BRT is built, a link should be completed and given a chance. Proper BRT is a really good service. If it is overwhelmed then it would need be looked at. However, one of the current issues in Toronto & area seems to be a political need to opt for technologies that are hugely more expensive and whose major justification elsewhere is a capacity not required for the application being sought in Toronto. This seems to stem from a failure to appreciate just how small and sensitive to overload roadway capacity is, and therefore how few riders need to be diverted to make an appreciable difference. A BRT is the appropriate mode to move the equivalent load of a 4 lane expressway, and with passing lanes in station and platforms that can accommodate multiple buses this can be comfortably stretched well beyond this. If we can fill an Artic a minute, then maybe more is needed, but this should be well established before solutions running to the billions are proposed to fill a need that would be just as well served by a project that would cost in the tens or low hundreds of millions, and would cost millions less to operate. Sorry for the rant.

    Like